ML20196G463

From kanterella
Jump to navigation Jump to search
Forwards AEOD Technical Review Rept T809, Blocked Thimble Tubes/Stuck Incore Detector. Events Where Recovery of Stuck Detector & Cleaning of Thimble Tubes Led to Personnel Hazard,Discussed
ML20196G463
Person / Time
Site: Sequoyah, Braidwood, Surry, 05000000
Issue date: 06/23/1988
From: Wegner M
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
To: Rosenthal J
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
Shared Package
ML20196G410 List:
References
NUDOCS 8807050528
Download: ML20196G463 (1)


Text

.. - - - _ _ _ _ - - - - _ _

C JUN 2 31900 MEMORANDUM FOR:

Jack E. Rosenthal, Chief Reactor Operations '..alysis Branch Division of Safety Programs, AE0D THRU:

Matthew Chiramal, Chief l

l Engineering Section Reactor Operations Analysis Branch Division of Safety Programs, AEOD j

FROM:

Mary S. Wegner Engineering Section l

Reactor Operations Analysis Branch Division of Safety Programs, AE00

SUBJECT:

AE0D/T809:

BLOCKED THIMBLE TUBES / STUCK INCORE DETECTOR Enclosed is a technical review report on blocked thimble tubes / stuck detectors.

Thimble tubes through which the incore detector probes are inserted into the reactor in a Westinghouse pressurized water reactor (PWR) may become blocked by hardening of the detector cable lubricant, denting of the thimble tube caused by flow-induced vibration, or by flooding of the tube caused by a leaking thimble tube. Detectors may become stuck when the thimb'e tube is blocked or the withdrawal mechanism is faulty.

Recovery of a stuck detector and cleaning of thimble tubes generally proceed without incident, but several events point out the potential for personnel hazard; including the Sequoyah 1 incident of 1984, and events at Surry 2 and Braidwood 1 in 1988 as well as several foreign events. Causes for the problems include damage to the thimble tubes caused by flow-induced vibration aggravated by damage caused by inserting or withdrawing the detector and a combination of planning and maintenance errors.

W stead by Mary S. Wegner Engineering Section Peactor Operations Analysis Branch Division of Safety Programs, AE0D

Enclosure:

As Stated cc:

W. Beaumont, W Distribution:

L. Gifford, 2 PDR TNovak C. Brinkman, CE ROAB R/F VBenaroya R. Borsum, B&W MWegner CHeltemes MChiramal EJordan MTaylor, ED0 MWilliams JPartlow, OSP KBlack ROAB:D PSE D R0AB:DSP:AE00 R

DSP:AE0D MWegn P, Chi ramal J osenthal L si / 8

$/ff/88 g://688 8807050528 080623 PDR ADOCK 050 6

P

. _ -