Issue date | Title | Topic | |
---|---|---|---|
ML20217D591 | 17 May 1999 | Forwards Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990329-0401 & 0412-15 at Surry Power Station | Boric Acid Fitness for Duty Shutdown Margin High Radiation Area Grab sample Fire impairment Emergency Lighting Job Performance Measure Earthquake Power change |
ML20249A802 | 16 March 1998 | Discusses Re Review of Topical Programs | |
ML20249A800 | 9 March 1998 | Forwards Ltr from VEPCO & WOG Requesting Waiver of Fee for Staff Review of Certain Submittals Re Pilot Program Effort risk-informed Inservice Insp Program | Probabilistic Risk Assessment |
ML18153A254 | 8 December 1997 | Forwards Matls Analysis Rept NESML-Q-333, Unit 2 Let Down Orifice Insp, for Use | |
ML20211B946 | 6 August 1997 | Notifies of First Meeting of Plant on risk-informed ISI on 970814 in Surry,Va W/Listed Attendees to Discuss Categorization of Piping Segments & PRA Analyses & Results | |
ML20129K256 | 5 November 1996 | Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness | |
ML20134D716 | 24 October 1996 | Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary | |
ML20136C820 | 10 October 1995 | Provides Summary of Discussion & Staff Actions Re 950921 Plant Performance Review.List of Participants,Changes to Mip & Matrix Trend Charts Encl | Commercial Grade Dedication Systematic Assessment of Licensee Performance Fire Protection Program |
ML20137R952 | 22 March 1995 | Informs That Plant Performance Review of Listed Plants Was Held on 950316 | Fitness for Duty Enforcement Discretion Coatings Backfit |
ML18153B139 | 4 November 1994 | Forwards Surry Power Station Underground Oil Release Site Characterization Rept | |
ML20057B149 | 14 September 1993 | Forwards Documents on Proposed rules,10CFR2 & 72 Re Interim Storage of Spent Fuel in Independent Spent Fuel Storage Installation & site-specific License to Qualified Applicant | |
ML20057B189 | 14 September 1993 | Requests Commission Approval of Proposed Rulemaking to Eliminate Requirement of Prior Commission Approval for Specific License for ISFSI Under 10CFR2 & 72.Notice of Proposed Rulemaking & Addl Info Encl | Fuel cladding Backfit |
ML20248E939 | 29 September 1989 | Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed | |
ML20245F654 | 10 August 1989 | Submits Daily Highlight.Notifies of 890816 Meeting W/Util to Discuss Proposed Mods to Svc Water Sys at Plant | |
ML20245G310 | 31 July 1989 | Notification of 890807 Mgt Meeting W/Util in Atlanta,Ga to Discuss self-assessment Conducted at Facility | |
ML20154N836 | 13 September 1988 | Notification of 880916 Significant Licensee Meeting in Region II Ofc in Atlanta,Ga to Discuss Circumstance Re Partial Loss of Level in Unit 1 Refueling Cavity on 880517 | |
ML20196G463 | 23 June 1988 | Forwards AEOD Technical Review Rept T809, Blocked Thimble Tubes/Stuck Incore Detector. Events Where Recovery of Stuck Detector & Cleaning of Thimble Tubes Led to Personnel Hazard,Discussed | |
ML20196G405 | 23 June 1988 | Forwards AEOD Technical Review Rept T809, Blocked Thimble Tubes/Stuck Incore Detector, for Consideration Due to Recent Events at Braidwood Unit 1 | |
ML20237B268 | 11 December 1987 | Requests That Encl 10CFR50.App I Evaluations,For Listed Facilities Not Already Covered by Repts in Dcs,Be Entered Into DCS Sys on Microfiche | |
ML20153E918 | 16 November 1987 | Forwards Oct 1987 Significant Intergovernmental Activities & Issues Rept.Rept Represents Combined Efforts of NRC Regional State Liaison Officers,State,Local & Indian Tribes Programs Staff & Regional State Agreement Representatives | Safe Shutdown Fitness for Duty Chernobyl |
ML20238B308 | 27 August 1987 | Notification of 870825 Meeting W/Util in Silver Spring,Md to Discuss New Nuclear Assurance Corp Cask Design & Util Part 72 License Amend Submittal | |
ML20245B365 | 27 May 1987 | Forwards C Mccracken 870514 Memo on NRR Review Plan & Schedule for Info Requested from Licensees Re Responses to Facility Feedwater Pipe Rupture | |
ML20214L583 | 21 May 1987 | Summarizes 870519 Operating Reactors Events Meeting 87-15 to Brief Senior Managers from Nrr,Res,Aeod & Regional Ofcs on Events Which Occurred Since 870512 Meeting.Events Discussed & Significant Elements of Events Encl | |
ML20245B368 | 14 May 1987 | Forwards Proposed Course of Action & Projected Schedule for Handling Info Received in Response to Facility Pipe Rupture Bulletin,Per J Sniezek 870507 request.SECY-86-97 Also Encl to Provide Reporting Format That Will Be Followed | Backfit |
ML20215B624 | 20 April 1987 | Forwards EDO Principle Correspondence Including Question by Asselstine Re Enforcement Action Following Pipe Break | |
ML20215H885 | 13 April 1987 | Requests Description of NRC Approach to Problem of Corrosion & Erosion in Feedrings & J-tubes Based on 870312 Nucleonics Wk Article Re French Investigation Into Pipe Wall Thinning. Rationale for Not Citing Util for Poor GDC-1 Also Requested | |
ML20245A495 | 9 March 1987 | Forwards Regional Ofcs Response to NRC Request for Survey of Licensee Programs for Monitoring Secondary Pipe Thinning,Per IE Info Notice 86-106, Feedwater Line Break. Survey Conducted During Wk of 870207.Draft IE Bulletin Encl | |
ML20210M963 | 3 February 1987 | Summarizes 870130 Telcon W/M Specter of Washington Post Re Plant Pipe Failure & AEOD/E416, Erosion in Nuclear Power Plants. AEOD Procedure for Distribution of Repts,Nrc Actions & Whether Rept Sent to Util Discussed | |
ML20207Q696 | 9 January 1987 | Notification of 870115 Meeting W/Technical Experts in Washington,Dc to Discuss Parameters W/Significant Role in Pipe Failure & Development of Generic Guidance to Predict & Mitigate erosion-corrosion Piping Damage Effects | |
ML20215B358 | 29 December 1986 | Informs Augmented Insp Team (AIT) of Activities During Jan 1987 in Order to Conclude AIT Insp & Issuance of Insp Rept. Insp Rept Based on 861217 Draft Executive Summary Requested by 870109.AIT Will Reconvene During Wk of 870112 | |
ML20214J696 | 21 November 1986 | Notification of 861124 Meeting W/Util in Bethesda,Md to Discuss Util Request to Amend Licenses for 40-yr Operation from Date of Issuance of OLs | |
ML20210K078 | 3 April 1986 | Forwards FEMA Rept on 851004 Emergency Exercise.State Supplied Schedule of Corrective Actions Will Be Forwarded When Received.Overall Capability of Offsite Authorities Acceptable & 44CFR350 Approval Remains in Effect | |
ML20134N789 | 21 August 1985 | Forwards Investigation Rept 2-84-015 to Be Provided to Ofc of Investigations Region II for Release to Licensee & Pdr. Part 21 Related | |
ML20127F306 | 18 June 1985 | Forwards Tabular Summary of Key Results from Regional Survey of plant-specific Info Re Potential for Uncontrolled Radiation Exposures in PWR Cavities,Per Jg Partlow 850315 Request.No Further Generic Action Needed | High Radiation Area |
ML20128H766 | 5 June 1985 | Discusses Substantive Changes in 850416 Rev to Radiological Emergency Plans.Revs Meet Requirements of 10CFR50.54(q) & 50.47(b) | Earthquake |
ML20210P638 | 8 March 1984 | Comments on Statement That NRC Has Already Authorized Three Utils to Load & Use Fuel Intended for Burnup,Per 840222 Memo.Authorization Not Yet Granted.Forwards Paper Presented at ANS Meeting | |
ML20197G279 | 7 March 1984 | Forwards SER for Radiological Consequences of Accidents for Extended Burnup.Calculated Dose to Thyroid for Fuel Handling Accident Indicates Plant Design Adequate.Salp Also Encl | |
ML20080D532 | 17 October 1983 | Informs of 831015 Fatal Accident Involving Wc Jones. Expansion Joint Ruptured During High Pressure Drain Pump Valve Operation | Fatality |
ML20244C101 | 16 February 1983 | Forwards Engineering Evaluation of 811128 Event Involving Svc Water Valve Pit Flooding.Licensee Has Installed Dikes & Lights & Upgraded Maint Procedures to Preclude Future Occurrences.No Further Action Necessary | |
ML20127A368 | 18 August 1982 | Forwards List of Plants for Which Leak Test Repts Were Selected for Review by Ornl.Leak Testing Criteria Will Be Prepared from Review.W/O Encl | |
ML20062E079 | 29 July 1982 | Forwards Incident Reporting Sys Repts Re Spill of Contaminated Water & Contamination of Personnel in Auxiliary Bldg & Failure of Control Rod Guide Tube Support Pins for Transmittal to NEA | Reserve Station Service Transformer |
ML20062D329 | 29 July 1982 | Forwards Incident Reporting Sys Repts Re Effects of Fire Protection Sys Actuation on safety-related Equipment & Seismic Qualification of safety-related Sys for Transmission to NEA | |
ML20126L227 | 1 May 1981 | Forwards Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Vessels | |
IA-85-516, Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities | 31 December 1980 | Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities | Boric Acid Systematic Assessment of Licensee Performance |
ML20134L496 | 31 December 1980 | Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities | Boric Acid Systematic Assessment of Licensee Performance |
ML20128Q733 | 28 July 1980 | Discusses Proposed Rev to IE Bulletin 79-14,per 800528 Memo. Region II Requested to Identify Design Organizations Which Did Static Analyses for Plant Resistance Temp Detector Lines.Reanalysis Necessary | |
ML20128Q713 | 28 May 1980 | Discusses Proposed Rev to IE Bulletin 79-14 as Result of Overstressed Resistance Temp Detectors Found at Plants. Bulletin Should Be Revised to Include Small Bore Piping Under 2.5 Inches | |
ML20125E422 | 15 January 1980 | Accepts Integrated Startup Program for Facility.Baseline Eddy Current Insp of Tubing Should Be Performed After Field Hydrostatic Test & Be Considered Preservice Insp as Defined in Westinghouse STS | Hydrostatic |
ML20133N166 | 27 March 1979 | Submits Info Re Cost of Replacement Power While Facilities Shut Down.Info Will Aid in Responding to Senate Appropriations Subcommittee 790313 Question | |
ML20133M211 | 14 March 1979 | Submits Schedule for S&W to Complete Calculations.Ofc of Policy Evaluation Should Prepare Paper Re Impact on Each Region of Shutdown,Degree of Relaxation from Stds Allowable & If Mods Can Be Done Over Extended Period by 790415 |