Summary of 3/4/2021 Pre-Submittal Public Meeting with PSEG Nuclear LLC to Discuss Adoption of ASME Section XI Code Cases N-878, N-879, and N-880 at Hope Creek Generating Station and Salem Nuclear Generating Station
ML21064A096
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 03/09/2021
From: James Kim
Plant Licensing Branch 1
To:
Public Service Enterprise Group
Kim J
Shared Package
ML21064A138 List:
References
EPID L-2021-LRM-0022
Download: ML21064A096 (4)


Text

March 9, 2021 LICENSEE: PSEG Nuclear LLC FACILITY: Hope Creek Generating Station Salem Generating Station Units 1 and 2

SUBJECT:

SUMMARY

OF MARCH 4, 2021, PRE-SUBMITTAL PUBLIC MEETING WITH PSEG NUCLEAR LLC TO DISCUSS ADOPTION OF ASME SECTION XI CODE CASES N-878, N-879, AND N-880 (EPID L-2021-LRM-0022)

On March 4, 2021, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of PSEG Nuclear LLC (PSEG or the licensee) by teleconference. The purpose of the meeting was to discuss PSEGs planned approach for requesting authorization to adopt American Society of Mechanical Engineers (ASME)Section XI Code Case N-879 (Use of Micro-Alloyed Carbon Steel Bar in Patented Mechanical Joints and Fittings, Classes 1, 2 and 3 Section III, Division 1), Code Case N-878 (Alternative to QA

[Quality Assurance] Program Requirements of IWA-4142 Section XI Division 1), and Code Case N-880 (Alternative to Procurement Requirements of IWA-4143 for Small Nonstandard Welded fittingsSection XI, Division 1) for Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2. The meeting notice and agenda, dated February 18, 2021, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML21049A008. A list of attendees is enclosed.

The licensee presented information from the slides contained in ADAMS Accession No. ML21057A001, on the planned scope and schedule of the relief requests. Specifically, the licensee was seeking to gather NRC staff feedback on the proposed approach of referencing Electric Power Research Institute (EPRI) reports on use of sleeve fittings and referencing previously approved relief requests.

The NRC staff discussed with the licensee whether the EPRI technical reports on use of Lokring technology have been submitted to the NRC on a docket and added into ADAMS. The NRC staff stated that the EPRI reports are not in ADAMS since they were recently issued and not referenced in previously approved relief requests. The licensee stated that the timing of the NRC approval of the planned relief requests would be in close proximity to issuance of revised Regulatory Guide (RG) 1.84, Design, Fabrication, and Materials Code Case Acceptability, ASME Section III, and RG 1.147, Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1, which incorporate the subject ASME Code Cases and PSEGs relief requests submittal would be contingent upon the current rulemaking schedule to incorporate by reference the regulatory guide revisions. The NRC staff cautioned that the current rulemaking schedule may change, which may change the licensees decision either to submit planned relief requests or wait on the final rulemaking incorporating revised regulatory guides. The NRC staff stated that the proposed rule was published for comments in the Federal Register (86 FR 7820; February 2, 2021) and the final rule is scheduled to be published on March 23, 2022.

There were no comments from members of the public. No public meeting feedback forms were received. No regulatory decisions were made at the meeting.

Please direct any inquiries to me at (301) 415-4125 or James.Kim@nrc.gov.

/RA/

James S. Kim, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-354, 50-272, and 50-311

Enclosure:

List of Attendees cc: Listserv

ML21064A096 OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA NRR/DORL/LPL1/BC NRR/DORL/LPL1/PM NAME JKim JBurkhardt JDanna JKim DATE 3/5/2021 3/5/2021 3/8/2021 3/9/2021 LIST OF ATTENDEES MARCH 4, 2021, PRE-SUBMITTAL PUBLIC MEETING WITH PSEG NUCLEAR LLC TO DISCUSS ADOPTION OF ASME SECTION XI CODE CASES N-878, N-879, AND N-880 FOR HOPE CREEK GENERATING STATION AND SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 ATTENDEES ORGANIZATION James Danna U.S. Nuclear Regulatory Commission (NRC)

Robert Davis NRC Bart Fu NRC Kerri Kavanaugh NRC Yiu Law NRC Kaihwa Hsu NRC Chakrapani Basavaraju NRC James Kim NRC Michael Wiwel PSEG Nuclear LLC (PSEG)

Paul Duke PSEG Frank Szanyi PSEG Bill Kopchick PSEG James Boyer PSEG Britanie Peabody PSEG Ali Fakhar PSEG Enclosure