MONTHYEARIR 05000456/19990131999-09-17017 September 1999 Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824. Violations Noted.Major Areas Inspected:C/As & Engineering Related Activities to Address Technical Concerns Identified During Design Insp Completed on 980424 IR 05000456/19990121999-09-0303 September 1999 Insp Repts 50-456/99-12 & 50-457/99-12 on 990707-0816.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000456/19990111999-07-29029 July 1999 Insp Repts 50-456/99-11 & 50-457/99-11 on 990525-0706.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990091999-07-20020 July 1999 Insp Repts 50-456/99-09 & 50-457/99-09 on 990517-0623.No Violations Noted.Major Areas Inspected:Licensee Radiation Protection Program.Circumstances Surrounding 990428, Gatehouse Monitor Exiting Incident Were Also Reviewed IR 05000456/19990071999-06-18018 June 1999 Insp Repts 50-456/99-07 & 50-457/99-07 on 990414-0524.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000457/19990081999-06-14014 June 1999 Insp Rept 50-457/99-08 on 990415-0518.No Violations Noted. Major Areas Inspected:Isi & SG Insp Program IR 05000456/19990051999-05-20020 May 1999 Insp Repts 50-456/99-05 & 50-457/99-05 on 990405-23.Non- Cited Violations Identified.Major Areas Inspected:Review of Engineering & Technical Support & Corrective Actions IR 05000456/19990061999-05-11011 May 1999 Insp Repts 50-456/99-06 & 50-457/99-06 on 990302-0413.One non-cited Violation Re Configuration Control Error Occurred. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000456/19990021999-03-23023 March 1999 Insp Repts 50-456/99-02 & 50-457/99-02 on 990120-0301.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990041999-03-23023 March 1999 Insp Repts 50-456/99-04 & 50-457/99-04 on 990222-24 & 0303 Onsite & 0309 & 11 Region 3 Ofc.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000456/19980161999-02-11011 February 1999 Insp Rept 50-456/98-16 on 980916-990121.No Violations Noted. Major Areas Inspected:Containment Access Opening & Replacement Activities,Removal & Replacement of Sgs,Welding of SG Piping & Review of Quality Control Activities IR 05000456/19980201998-12-30030 December 1998 Insp Repts 50-456/98-20 & 50-457/98-20 on 981020-1207.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19980211998-12-10010 December 1998 Insp Repts 50-456/98-21 & 50-457/98-21 on 981110-24.No Violations Noted.Major Areas Inspected:Aspects of Corrective Actions & Engineering Involvement in Corrective Action Process IR 05000456/19980181998-12-0404 December 1998 Insp Rept 50-456/98-18 on 981015-23 & 1109-10.No Violations Noted.Major Areas Inspected:Four Areas Associated with Licensee SG Replacement Project IR 05000456/19980191998-11-25025 November 1998 Insp Repts 50-456/98-19 & 50-457/98-19 on 981027-30.No Violations Noted.Major Areas Inspected:Licensee Implementation of 10CFR50.65 Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants ML20195G3731998-11-17017 November 1998 Insp Repts 50-456/98-14 & 50-457/98-14 on 980909-1019. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000456/19980151998-11-13013 November 1998 Insp Repts 50-456/98-15 & 50-457/98-15 on 980915-1022. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Focusing on Radiological Controls for Unit 1 Outage Activities & SG Replacement Project IR 05000456/19980171998-11-10010 November 1998 Insp Repts 50-456/98-17 & 50-457/98-17 on 981013-19. Violations Noted.Major Areas Inspected:Security Measures Implemented to Support Steam Generator Replacement Project IR 05000456/19980121998-10-0505 October 1998 Insp Repts 50-456/98-12 & 50-457/98-12 on 980728-0908.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980111998-09-25025 September 1998 Insp Rept 50-456/98-11 on 980707-09,15-16,0805-06,10-13 & 26-28.No Violations Noted.Major Areas Inspected:Review of SG Replacement Program.Insp Focused on Welding of SG Feedwater Piping & Preparation Activities for Replacing SGs IR 05000456/19980131998-08-28028 August 1998 Insp Repts 50-456/98-13 & 50-457/98-13 on 980810-14.No Violations Noted.Major Areas Inspected:Review of Chemistry & Radiation Protection Programs IR 05000456/19980091998-08-25025 August 1998 Insp Repts 50-456/98-09 & 50-457/98-09 on 980609-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20236N0941998-07-0606 July 1998 Insp Repts 50-456/98-08 & 50-457/98-08 on 980421-0608. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980101998-07-0202 July 1998 Insp Repts 50-456/98-10 & 50-457/98-10 on 980615-19.No Violations Noted.Major Areas Inspected:Physical Security Program.Details Withheld (Ref 10CFR73.21) IR 05000456/19980071998-06-18018 June 1998 Insp Repts 50-456/98-07 & 50-457/98-07 on 980519-22.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000456/19982011998-06-0101 June 1998 Insp Rept 50-456/98-201 on 980316-20,0330-0410 & 0420-24. No Violations Noted.Major Areas Inspected.Team Selected & Reviewed Relevant Portions of Ufsar,Ts,Drawings, Calculations,Mod Packages & Procedures IR 05000456/19980051998-05-19019 May 1998 Insp Repts 50-456/98-05 & 50-457/98-05 on 980310-0420. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000456/19980061998-04-21021 April 1998 Insp Repts 50-456/98-06 & 50-457/98-06 on 980331-0407. Violations Noted.Major Areas Inspected:Announced Review Protection Program.Insp Focused on Liquid & Gaseous Effluent Radiation Monitoring Programs ML20216B0761998-04-0808 April 1998 Insp Repts 50-456/98-02 & 50-457/98-02 on 980127-0309. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19980031998-03-16016 March 1998 Insp Repts 50-456/98-03 & 50-457/98-03 on 980128-30.No Violations Noted.Major Areas Inspected:Operations & Maint ML20203D9201998-02-20020 February 1998 Insp Repts 50-456/97-22 & 50-457/97-22 on 971216-980126. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000457/19970211998-02-11011 February 1998 Insp Rept 50-457/97-21 on 971112-21 & 980115.Violations Noted.Major Areas Inspected:Operations & Engineering ML20198G1231998-01-0707 January 1998 Partially Withheld Insp Repts 50-456/97-20 & 50-457/97-20 on 971117-21 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support Performance Involving Evaluation of Effectiveness of Physical Protection Program ML20202F1951998-01-0202 January 1998 Insp Repts 50-456/97-19 & 50-457/97-19 on 971104-1215. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20199A5781997-12-17017 December 1997 Insp Repts 50-456/97-16 & 50-457/97-16 on 970923-1103. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19970151997-11-26026 November 1997 Insp Repts 50-456/97-15 & 50-457/97-15 on 970812-0922. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000456/19970171997-11-17017 November 1997 Insp Repts 50-456/97-17 & 50-457/97-17 on 971006-22. Violations Noted.Major Areas Inspected:Plant Support & Radiation Protection Program IR 05000456/19970121997-10-17017 October 1997 Insp Repts 50-456/97-12 & 50-457/97-12 on 970414-0815. Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000456/19970131997-09-17017 September 1997 Insp Repts 50-456/97-13 & 50-457/97-13 on 970701-0811. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19970141997-09-12012 September 1997 Insp Repts 50-456/97-14 & 50-457/97-14 on 970811-15.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Training Programs IR 05000456/19970091997-08-26026 August 1997 Insp Repts 50-456/97-09 & 50-457/97-09 on 970520-0630. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20149J7051997-07-24024 July 1997 Insp Repts 50-456/97-11 & 50-457/97-11 on 970618-24.No Violations Noted.Major Areas Inspected:Plant Support Performance & Evaluation of Effectiveness of Radiation Protection Program IR 05000456/19970101997-06-26026 June 1997 Insp Rept 50-456/97-10 on 970403-0602.No Violations Noted. Major Areas Inspected:Maint ML20141E8371997-06-17017 June 1997 Insp Repts 50-456/97-07 & 50-457/97-07 on 970408-0520. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141H4431997-05-19019 May 1997 Enforcement Conference Repts 50-456/96-16 & 50-457/96-16 on 970514 in Lisle,Il.Major Areas Discussed:Apparent Violations Identified During Inspection,Along W/Corrective Actions Taken or Planned by Licensee ML20141J9301997-05-19019 May 1997 Insp Repts 50-456/97-08 & 50-457/97-08 on 970417-30. Violations Noted.Major Areas Inspected:Plant Support Performance ML20141D7711997-05-0909 May 1997 Insp Repts 50-456/97-05 & 50-457/97-05 on 970222-0407. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19970061997-04-10010 April 1997 Partially Withheld Insp Repts 50-456/97-06 & 50-457/97-06 on 970310-14.No Violations Noted.Major Areas Inspected: Evaluation of Performance of Security Organization & Review of Previous Open Items IR 05000456/19970041997-04-0808 April 1997 Insp Repts 50-456/97-04 & 50-457/97-04 on 970303-07. Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program,Aspect of Plant Support 1999-09-03
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000456/19990131999-09-17017 September 1999 Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824. Violations Noted.Major Areas Inspected:C/As & Engineering Related Activities to Address Technical Concerns Identified During Design Insp Completed on 980424 IR 05000456/19990121999-09-0303 September 1999 Insp Repts 50-456/99-12 & 50-457/99-12 on 990707-0816.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000456/19990111999-07-29029 July 1999 Insp Repts 50-456/99-11 & 50-457/99-11 on 990525-0706.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990091999-07-20020 July 1999 Insp Repts 50-456/99-09 & 50-457/99-09 on 990517-0623.No Violations Noted.Major Areas Inspected:Licensee Radiation Protection Program.Circumstances Surrounding 990428, Gatehouse Monitor Exiting Incident Were Also Reviewed IR 05000456/19990071999-06-18018 June 1999 Insp Repts 50-456/99-07 & 50-457/99-07 on 990414-0524.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000457/19990081999-06-14014 June 1999 Insp Rept 50-457/99-08 on 990415-0518.No Violations Noted. Major Areas Inspected:Isi & SG Insp Program IR 05000456/19990051999-05-20020 May 1999 Insp Repts 50-456/99-05 & 50-457/99-05 on 990405-23.Non- Cited Violations Identified.Major Areas Inspected:Review of Engineering & Technical Support & Corrective Actions IR 05000456/19990061999-05-11011 May 1999 Insp Repts 50-456/99-06 & 50-457/99-06 on 990302-0413.One non-cited Violation Re Configuration Control Error Occurred. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000456/19990021999-03-23023 March 1999 Insp Repts 50-456/99-02 & 50-457/99-02 on 990120-0301.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990041999-03-23023 March 1999 Insp Repts 50-456/99-04 & 50-457/99-04 on 990222-24 & 0303 Onsite & 0309 & 11 Region 3 Ofc.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000456/19980161999-02-11011 February 1999 Insp Rept 50-456/98-16 on 980916-990121.No Violations Noted. Major Areas Inspected:Containment Access Opening & Replacement Activities,Removal & Replacement of Sgs,Welding of SG Piping & Review of Quality Control Activities IR 05000456/19980201998-12-30030 December 1998 Insp Repts 50-456/98-20 & 50-457/98-20 on 981020-1207.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19980211998-12-10010 December 1998 Insp Repts 50-456/98-21 & 50-457/98-21 on 981110-24.No Violations Noted.Major Areas Inspected:Aspects of Corrective Actions & Engineering Involvement in Corrective Action Process IR 05000456/19980181998-12-0404 December 1998 Insp Rept 50-456/98-18 on 981015-23 & 1109-10.No Violations Noted.Major Areas Inspected:Four Areas Associated with Licensee SG Replacement Project IR 05000456/19980191998-11-25025 November 1998 Insp Repts 50-456/98-19 & 50-457/98-19 on 981027-30.No Violations Noted.Major Areas Inspected:Licensee Implementation of 10CFR50.65 Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants ML20195G3731998-11-17017 November 1998 Insp Repts 50-456/98-14 & 50-457/98-14 on 980909-1019. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000456/19980151998-11-13013 November 1998 Insp Repts 50-456/98-15 & 50-457/98-15 on 980915-1022. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Focusing on Radiological Controls for Unit 1 Outage Activities & SG Replacement Project IR 05000456/19980171998-11-10010 November 1998 Insp Repts 50-456/98-17 & 50-457/98-17 on 981013-19. Violations Noted.Major Areas Inspected:Security Measures Implemented to Support Steam Generator Replacement Project IR 05000456/19980121998-10-0505 October 1998 Insp Repts 50-456/98-12 & 50-457/98-12 on 980728-0908.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980111998-09-25025 September 1998 Insp Rept 50-456/98-11 on 980707-09,15-16,0805-06,10-13 & 26-28.No Violations Noted.Major Areas Inspected:Review of SG Replacement Program.Insp Focused on Welding of SG Feedwater Piping & Preparation Activities for Replacing SGs IR 05000456/19980131998-08-28028 August 1998 Insp Repts 50-456/98-13 & 50-457/98-13 on 980810-14.No Violations Noted.Major Areas Inspected:Review of Chemistry & Radiation Protection Programs IR 05000456/19980091998-08-25025 August 1998 Insp Repts 50-456/98-09 & 50-457/98-09 on 980609-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20236N0941998-07-0606 July 1998 Insp Repts 50-456/98-08 & 50-457/98-08 on 980421-0608. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980101998-07-0202 July 1998 Insp Repts 50-456/98-10 & 50-457/98-10 on 980615-19.No Violations Noted.Major Areas Inspected:Physical Security Program.Details Withheld (Ref 10CFR73.21) IR 05000456/19980071998-06-18018 June 1998 Insp Repts 50-456/98-07 & 50-457/98-07 on 980519-22.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000456/19982011998-06-0101 June 1998 Insp Rept 50-456/98-201 on 980316-20,0330-0410 & 0420-24. No Violations Noted.Major Areas Inspected.Team Selected & Reviewed Relevant Portions of Ufsar,Ts,Drawings, Calculations,Mod Packages & Procedures IR 05000456/19980051998-05-19019 May 1998 Insp Repts 50-456/98-05 & 50-457/98-05 on 980310-0420. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000456/19980061998-04-21021 April 1998 Insp Repts 50-456/98-06 & 50-457/98-06 on 980331-0407. Violations Noted.Major Areas Inspected:Announced Review Protection Program.Insp Focused on Liquid & Gaseous Effluent Radiation Monitoring Programs ML20216B0761998-04-0808 April 1998 Insp Repts 50-456/98-02 & 50-457/98-02 on 980127-0309. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19980031998-03-16016 March 1998 Insp Repts 50-456/98-03 & 50-457/98-03 on 980128-30.No Violations Noted.Major Areas Inspected:Operations & Maint ML20203D9201998-02-20020 February 1998 Insp Repts 50-456/97-22 & 50-457/97-22 on 971216-980126. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000457/19970211998-02-11011 February 1998 Insp Rept 50-457/97-21 on 971112-21 & 980115.Violations Noted.Major Areas Inspected:Operations & Engineering ML20198G1231998-01-0707 January 1998 Partially Withheld Insp Repts 50-456/97-20 & 50-457/97-20 on 971117-21 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support Performance Involving Evaluation of Effectiveness of Physical Protection Program ML20202F1951998-01-0202 January 1998 Insp Repts 50-456/97-19 & 50-457/97-19 on 971104-1215. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20199A5781997-12-17017 December 1997 Insp Repts 50-456/97-16 & 50-457/97-16 on 970923-1103. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19970151997-11-26026 November 1997 Insp Repts 50-456/97-15 & 50-457/97-15 on 970812-0922. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000456/19970171997-11-17017 November 1997 Insp Repts 50-456/97-17 & 50-457/97-17 on 971006-22. Violations Noted.Major Areas Inspected:Plant Support & Radiation Protection Program IR 05000456/19970121997-10-17017 October 1997 Insp Repts 50-456/97-12 & 50-457/97-12 on 970414-0815. Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000456/19970131997-09-17017 September 1997 Insp Repts 50-456/97-13 & 50-457/97-13 on 970701-0811. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19970141997-09-12012 September 1997 Insp Repts 50-456/97-14 & 50-457/97-14 on 970811-15.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Training Programs IR 05000456/19970091997-08-26026 August 1997 Insp Repts 50-456/97-09 & 50-457/97-09 on 970520-0630. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20149J7051997-07-24024 July 1997 Insp Repts 50-456/97-11 & 50-457/97-11 on 970618-24.No Violations Noted.Major Areas Inspected:Plant Support Performance & Evaluation of Effectiveness of Radiation Protection Program IR 05000456/19970101997-06-26026 June 1997 Insp Rept 50-456/97-10 on 970403-0602.No Violations Noted. Major Areas Inspected:Maint ML20141E8371997-06-17017 June 1997 Insp Repts 50-456/97-07 & 50-457/97-07 on 970408-0520. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141H4431997-05-19019 May 1997 Enforcement Conference Repts 50-456/96-16 & 50-457/96-16 on 970514 in Lisle,Il.Major Areas Discussed:Apparent Violations Identified During Inspection,Along W/Corrective Actions Taken or Planned by Licensee ML20141J9301997-05-19019 May 1997 Insp Repts 50-456/97-08 & 50-457/97-08 on 970417-30. Violations Noted.Major Areas Inspected:Plant Support Performance ML20141D7711997-05-0909 May 1997 Insp Repts 50-456/97-05 & 50-457/97-05 on 970222-0407. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19970061997-04-10010 April 1997 Partially Withheld Insp Repts 50-456/97-06 & 50-457/97-06 on 970310-14.No Violations Noted.Major Areas Inspected: Evaluation of Performance of Security Organization & Review of Previous Open Items IR 05000456/19970041997-04-0808 April 1997 Insp Repts 50-456/97-04 & 50-457/97-04 on 970303-07. Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program,Aspect of Plant Support 1999-09-03
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000456/19990131999-09-17017 September 1999 Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824. Violations Noted.Major Areas Inspected:C/As & Engineering Related Activities to Address Technical Concerns Identified During Design Insp Completed on 980424 IR 05000456/19990121999-09-0303 September 1999 Insp Repts 50-456/99-12 & 50-457/99-12 on 990707-0816.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000456/19990111999-07-29029 July 1999 Insp Repts 50-456/99-11 & 50-457/99-11 on 990525-0706.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990091999-07-20020 July 1999 Insp Repts 50-456/99-09 & 50-457/99-09 on 990517-0623.No Violations Noted.Major Areas Inspected:Licensee Radiation Protection Program.Circumstances Surrounding 990428, Gatehouse Monitor Exiting Incident Were Also Reviewed IR 05000456/19990071999-06-18018 June 1999 Insp Repts 50-456/99-07 & 50-457/99-07 on 990414-0524.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000457/19990081999-06-14014 June 1999 Insp Rept 50-457/99-08 on 990415-0518.No Violations Noted. Major Areas Inspected:Isi & SG Insp Program IR 05000456/19990051999-05-20020 May 1999 Insp Repts 50-456/99-05 & 50-457/99-05 on 990405-23.Non- Cited Violations Identified.Major Areas Inspected:Review of Engineering & Technical Support & Corrective Actions IR 05000456/19990061999-05-11011 May 1999 Insp Repts 50-456/99-06 & 50-457/99-06 on 990302-0413.One non-cited Violation Re Configuration Control Error Occurred. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000456/19990021999-03-23023 March 1999 Insp Repts 50-456/99-02 & 50-457/99-02 on 990120-0301.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990041999-03-23023 March 1999 Insp Repts 50-456/99-04 & 50-457/99-04 on 990222-24 & 0303 Onsite & 0309 & 11 Region 3 Ofc.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000456/19980161999-02-11011 February 1999 Insp Rept 50-456/98-16 on 980916-990121.No Violations Noted. Major Areas Inspected:Containment Access Opening & Replacement Activities,Removal & Replacement of Sgs,Welding of SG Piping & Review of Quality Control Activities IR 05000456/19980201998-12-30030 December 1998 Insp Repts 50-456/98-20 & 50-457/98-20 on 981020-1207.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19980211998-12-10010 December 1998 Insp Repts 50-456/98-21 & 50-457/98-21 on 981110-24.No Violations Noted.Major Areas Inspected:Aspects of Corrective Actions & Engineering Involvement in Corrective Action Process IR 05000456/19980181998-12-0404 December 1998 Insp Rept 50-456/98-18 on 981015-23 & 1109-10.No Violations Noted.Major Areas Inspected:Four Areas Associated with Licensee SG Replacement Project IR 05000456/19980191998-11-25025 November 1998 Insp Repts 50-456/98-19 & 50-457/98-19 on 981027-30.No Violations Noted.Major Areas Inspected:Licensee Implementation of 10CFR50.65 Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants ML20195G3731998-11-17017 November 1998 Insp Repts 50-456/98-14 & 50-457/98-14 on 980909-1019. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering ML20195G3681998-11-17017 November 1998 Notice of Violation from Insp on 980909-1019.Violation Noted:As of 980818,licensee Failed to Initiate Measures to Determine Cause or Take Action to Preclude Recurrence of Loose Bolts on Two EDG Lubricating Oil Heat Exchanger Bells ML20195G3031998-11-13013 November 1998 Notice of Violation from Insp on 980915-1022.Violation Noted:On 981022,two Individuals Working Under RWP 984014 Removed Outer Rubber Gloves While Replacing Insulation in Containment IR 05000456/19980151998-11-13013 November 1998 Insp Repts 50-456/98-15 & 50-457/98-15 on 980915-1022. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Focusing on Radiological Controls for Unit 1 Outage Activities & SG Replacement Project IR 05000456/19980171998-11-10010 November 1998 Insp Repts 50-456/98-17 & 50-457/98-17 on 981013-19. Violations Noted.Major Areas Inspected:Security Measures Implemented to Support Steam Generator Replacement Project ML20196D9201998-11-10010 November 1998 Notice of Violation from Insp on 981013-19.Violation Noted: Licensee Security Staff Discovered That on Three Occasions Between 980826 & 1002,security Officers Were Found Asleep on Post IR 05000456/19983051998-11-0202 November 1998 Exam Repts 50-456/98-305 & 50-457/98-305 on 980914 with Telephoned Exam Results 981020.No Violations Noted.Exam Results:Applicant Passed Retake Exam & Was Issued Reactor Operator License IR 05000456/19980121998-10-0505 October 1998 Insp Repts 50-456/98-12 & 50-457/98-12 on 980728-0908.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980111998-09-25025 September 1998 Insp Rept 50-456/98-11 on 980707-09,15-16,0805-06,10-13 & 26-28.No Violations Noted.Major Areas Inspected:Review of SG Replacement Program.Insp Focused on Welding of SG Feedwater Piping & Preparation Activities for Replacing SGs IR 05000456/19980131998-08-28028 August 1998 Insp Repts 50-456/98-13 & 50-457/98-13 on 980810-14.No Violations Noted.Major Areas Inspected:Review of Chemistry & Radiation Protection Programs IR 05000456/19980091998-08-25025 August 1998 Insp Repts 50-456/98-09 & 50-457/98-09 on 980609-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20236N0911998-07-0606 July 1998 Notice of Violations from Insp on 980421-0608.Violations Noted:On 980424,licensee Failed to Implement Specific Fire Protection Program Requirements in That Welding Machine Was Left Unattended & Energized in Fuel Handling Bldg ML20236N0941998-07-0606 July 1998 Insp Repts 50-456/98-08 & 50-457/98-08 on 980421-0608. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980101998-07-0202 July 1998 Insp Repts 50-456/98-10 & 50-457/98-10 on 980615-19.No Violations Noted.Major Areas Inspected:Physical Security Program.Details Withheld (Ref 10CFR73.21) IR 05000456/19980071998-06-18018 June 1998 Insp Repts 50-456/98-07 & 50-457/98-07 on 980519-22.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000456/19982011998-06-0101 June 1998 Insp Rept 50-456/98-201 on 980316-20,0330-0410 & 0420-24. No Violations Noted.Major Areas Inspected.Team Selected & Reviewed Relevant Portions of Ufsar,Ts,Drawings, Calculations,Mod Packages & Procedures IR 05000456/19980051998-05-19019 May 1998 Insp Repts 50-456/98-05 & 50-457/98-05 on 980310-0420. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20248D0821998-05-19019 May 1998 Notice of Violation from Insp on 980310-0420.Violation Noted:On 980303,licensee Failed to Implement Braidwood Administrative Procedure 2321-18T11,Step E.1,for Sf Pool Skimmer Strainer Level Control IR 05000456/19983041998-04-29029 April 1998 NRC Operator Licensing Exam Repts 50-456/98-304OL & 50-457/98-304OL (Including Completed & Graded Tests) Administered During Wk of 980413 ML20217F5281998-04-21021 April 1998 Notice of Violation from Insp on 980331-0407.Violation Noted:Licensee Failed to Check That SG Worker Dosimetry Was Present & Correctly Worn IR 05000456/19980061998-04-21021 April 1998 Insp Repts 50-456/98-06 & 50-457/98-06 on 980331-0407. Violations Noted.Major Areas Inspected:Announced Review Protection Program.Insp Focused on Liquid & Gaseous Effluent Radiation Monitoring Programs ML20216B0611998-04-0808 April 1998 Notice of Violation from Insp on 980127-0309.Violation Noted:On 971010,21,1219 & 980105,licensee Failed to Require Independent Verification of Proper Sys Alignment for safety-related Valves Repositioned in Steps F.1.4 & F.1.7 ML20216B0761998-04-0808 April 1998 Insp Repts 50-456/98-02 & 50-457/98-02 on 980127-0309. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19980031998-03-16016 March 1998 Insp Repts 50-456/98-03 & 50-457/98-03 on 980128-30.No Violations Noted.Major Areas Inspected:Operations & Maint ML20203D9201998-02-20020 February 1998 Insp Repts 50-456/97-22 & 50-457/97-22 on 971216-980126. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20203D9151998-02-20020 February 1998 Notice of Violation from Insp on 971216-980126.Violation Noted:In Nov 1989,licensee Failed to Initiate Deviation Rept & Take Corrective Measures to Preclude Repetition of Mechanical Failure to All 4 Main Feedwater Check Valves ML20202F2321998-02-11011 February 1998 Notice of Violations from Insp on 971112-21 & 980115. Violations Noted:Licensee Failed to Follow NSWP-A-15 & Bwap 330-10 Requirements to Issue PIF for Tempering Line Snubber Considered Inoperable on 971110 IR 05000457/19970211998-02-11011 February 1998 Insp Rept 50-457/97-21 on 971112-21 & 980115.Violations Noted.Major Areas Inspected:Operations & Engineering PNO-III-98-013, on 980126,turbine Tripped Causing Subsequent Reactor Trip.Cause of Turbine Trip Remains Under Investigation.Appears Replacement Circuit Board Had Incorrect Electronic Configuration1998-01-29029 January 1998 PNO-III-98-013:on 980126,turbine Tripped Causing Subsequent Reactor Trip.Cause of Turbine Trip Remains Under Investigation.Appears Replacement Circuit Board Had Incorrect Electronic Configuration ML20198G1231998-01-0707 January 1998 Partially Withheld Insp Repts 50-456/97-20 & 50-457/97-20 on 971117-21 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support Performance Involving Evaluation of Effectiveness of Physical Protection Program ML20202F1951998-01-0202 January 1998 Insp Repts 50-456/97-19 & 50-457/97-19 on 971104-1215. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 07100104/20120151998-01-0202 January 1998 Notice of Violation from Insp on 971104-1215.Violation Noted:On 971102,inspectors Identified That Licensee Had Failed to Fasten Covers on Incore Neutron Detector Drive Mechanism IR 05000456/19973101997-12-29029 December 1997 NRC Operator Licensing Exam Repts 50-456/97-310OL & 50-457/97-310OL for Tests Administered on 971006-1107.Three Senior Reactor Operators & One Reactor Operator Passed Exam. One Senior Reactor & One Reactor Operator Failed ML20199A5681997-12-17017 December 1997 Notice of Violation from Insp on 970923-1103.Violation Noted:On 971014,licensee Instrument Technician Made Error When Changing Setpoints on Unit 2 Containment Area Radiation Monitor 2AR11J.Error Resulted in High Radiation Alarm 1999-09-03
[Table view] |
Text
_ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ - . _ _ _ . _ . _ . _ _ . _ _ _ _ _ . . _ . _ _ . .
'
. ,
,
,
!
U.S. NUCLEAR REGULATORY COMMISSION
REGION lll l i Docket Nos: 50-456;50-457
, License Nos: NPF 72; NPF 77 i
'
Report Nos: 50-456/97014(DRS); 50-457/97014(DRS)
Licensee: Commonwealth Edison (Comed)
Facility: Braldwood Nuclear Power Station, Units 1 and 2
Location: RR #1, Box 79 Braceville,IL 60407 Dates: August 11 15,1997 Inspectors: E. Plettner, Reactor Engineer P. Cataldo, Reactor Engineer Approved by: M. Leach, Chief, Operator Licensing Branch Division of Reactor Safety
,
9709190248 970912 PDR ADOCK 05000456 Q PDR
-
.
.
.
EXECUTIVE SUMMARY Braidwood Nuclear Plant, Units 1 & 2 NRC Inspection Report 50-456/97014; 50-457/97014 This inspection report contains the findings and conclusions from the inspection of the licensed reactor operator (RO) and senior reactor operator (SRO) requalification training programs. The inspection included a review of training administrative procedures and operating examination mateal; observation and evaluation of operator performance and licensee evaluators during a requall'ication operating examination; an assessment of simulator fidelity; an evaluation of program controls to assure a systems approach to training; and a review of requalification training record The inspectors used the guidance in inspection proceduto (IP) 7100 Ooerations Facility control room operators demonstrated good attentiveness to the operating panels and were knowledgable of plant conditions (Section 01).
All portions of the annual roqualification examination were judged to be effective tools for determining operator weaknesses (Sections 05.2 and 05.5).
Licensed operator requalification programs were implemented in accordance with 10 CFR Part 55 requirements (Sections 05.3 and 05.6).
Licensee controls to revise the licensed operator requalification training program were satisfactory (Section 05.4).
__._..__J
__ _ ____ -_ _ - _ -
.
.
Reports Details 1. Onorallent 01 Conduct of Operations Insoection Scooe (71707) ,'
The inspectors observed routine control room activities during full power plant operation, attended a day shift to swing-shift licensed operator turnover and crew briefing, performed panel walk-downs, reviewed the control room log, and questioned operators about plant and equipment status, Observations and Findings The conduct of licensed control room operators was professional. The inspectors noticed good attentiveness to control room panela and indications. During shift tumover, each operator performed front and backpanel walk-downs with their relie Face to face and phone communications were consister#j good. The control room noise level v.as minimized and no annunciators were kn in a prolonged alarm stat The operators were knowledgeable of tags on contre,i room panels, plant conditions, and equipment status when questioned by the inspek;ar Conclusions The inspectors concluded that an appropriate level of attention and detail existed in the control room and operator actions were consistent with licensee expectations as outlined in administrative procedures, l
l 05 Operator Training and Qualification 05.1 Ooerating Histqty insoection Scoge (71001)
The inspectors reviewed the following to assess the licensed operator requalification training program's affectiveness regarding operator performance:
- SALP Report Nos. 50-456/95001; 50-457/95001, o
Resident inspector observations aied reports covering the time frame of April 1996 to presen * Licensee event reports covering the time frame of June 1996 to presen e Initial license examination Repo,' Ncc. 50-456/96-01(OL); 50-457/96-01(OL).
__
.
.
- Licensed operator requalification training Report Nos. 50-456/95012(DRS); 50-457/95012(DRS). Observations and Findings The inspectors noted that poor operator performance au documented in the above reports was attributable in part to incorrect and inadequate procedures, and ineffective training for operators concerrdng usage of procedures. The inspectors noted that the licensee was continuing to take rigorous actions to improve operator performance through a program entitled Scorecard, Conclusions The inspectors concluded that the licensed operator requalification program had not been effective in the past in reenforcing proper procedural usage. Licensee corrective actions were implemented with some positive results being achieve .2 Reoualification Examinations Insoection Scoce (71001)
The inspectors reviewed the following using IP 71001, Appendix A check-lists titled " Simulator Scenario Review Checklist," " Job Performance Measure (JPM)
Quality Checklist," and the "NRC Checklist for Written Examination Questions" to assess the licensee's examination materials' quality and content; e Sample plan prepared for the current annual requalification operating examination e Written requalification exams administered in June 1997, e Operating requalification exams administered during the inspection wee Observations and Findings The inspectors reviewed the scenarios administered during the inspection week, as well as additional scenarios administered in previous weeks using the Appendix A checklist titled " Simulator Scenario Review Checklist." The dynamic scenarios were challenging and provided ample opportunity to evaluate the crew and individuals based on critical tasks and competencie The inspectors reviewed the observed job performance measure (JPM) set and two additional JPM sets administered in previous weeks. The JPMs had appropriate steps identified as critica'. Furthermore, they clearly identified and incorporated PRA elements in the selection proces _ _ - _ _ _ _ - _ _ _ _ - - _ _ _ -
.
.
The written examination questions were of good quality and were written to the appropriate difficulty level. A majority of the open reference questions were highei c.cgnitive knowledge level questions. The static examination questions made good use of the simulator as a reference. Less than ten percent of the questions were repeated from week to week, and one hundred percent of the questions were new or significantly modified from the previous examination cycle. One item for improvement was identifie The item involved the use of some " direct look-up" questions. NUREG 1021, Rev. 7, ES 602, Section B.2.e, defines a " direct look up" question as a question that immediately directs an operator to a particular reference where the answer is readily available. This type of question should be avolded and the licensee agreed to reduce the number of direct look-up questions during the next written exa Conclusions The examination material contained the necessary quantitative and qualitative attributes to provide an effective evaluation of operator skills. An item for improvement was identified involving the use of " direct look-up" questions used in the written examinatio .3 RequanGcation Examination Administration Practices Insoection Scoce (71001)
i l
'
The inspectors performed tha following to assess the licensee's policies and practices regarding requalification examination administration, and simulator fidelity:
Observed and evaluated the performance of two operating crews during dynamic simulator scenarios and the JPM examination * Reviewed Training Administrative Procedure * Reviewed the simulator fidelity lo Observations and Findings The inspectors observed the licensee evaluate two operating crews performance during four dynamic simulator scenarios. The licensee identified no unsatisfactory performance of either the crews or an individual during the inspection period. The licensee had identified unsatisfactory performance of a crew and two individuals during dynamic scenarios performed in a previous examination wee No new simulator performance or fidelity issues were identified during the inspectors'
observation of the operating examination. See enclosed Attachment 1, Simulation Facility Report. The licensee's simulator Deficiency Reports and Condition Reports were properly prioritized and addressed in a timely manne Good examination security was observed throughout the examination administratio l l
a
- _ _ - - _ _ - _ _ _ _
.
.
9 Conclusions The inspectors concluded that the licensee was implementing the licensed operator requalification program in accordance with 10 CFR Part 55.5 .4 Reaualification Trainina Procram Feedback System insoection Scoce (71001)
The inspectors performed the following to assess the licensee's training program feedback system effectiveness:
Reviewed the Safety Assessment and Quality Verification (SAQV) audit QAA 20-97-07 for Staffing and Trainin *
Reviewed recorded changes to the requalification program.
- Reviewed operator feedbac b, Observations and Findings The licensee assessed the identified individual operator and crew weaknesses, operator training requests, and plant and Industry events. Based on those assessments, training material was selected for the upcoming training cycle during the periodic meetings of the Training Advisory Committee (TAC). The program was current, up to date, and flexible enough to incorporate emerging training issues, in addition, the licensee had a satisfactory tracking program to incorporate changes to the examination bank material when procedure changes or modifications were implemented by the plant, Conclusions The inspectors determined that the feedback process was effectively implemente .5 Remedial Trainino Procram Insoection Scooe (71001)
The inspectors performed the following to assess the licensee's remedial traipirg program effectiveness:
- Reviewed individual operator and crew performance evaluations for the four completed examination week *
Reviewed the remediation training plans for unsatisfactory operator performance for the four completed examination weeks.
<
._ ,
_ _ _ _ .
.
. .
.-
e Interviewed licensee personnel (licensed operators, instructors / evaluators, and supervisors).
,
j Observations and Findings The remedial training program was customized to address the individual weaknesses when an operator failed the annual requalification examination or had an adverse trend in performance during each requalification cycle as indicated by quiz grades or dynamic simulator evaluations. Remediation would be given to crews who did not perform up to standards during the annual requalification examination or during the requalification cycle dynamic simulator evaluations. The development of remediation plans included a comprehensive root cause analysis for past individual and crew performance weaknesses and possible programmatic breakdown. Retake examinations for Individual '
operators and or crews were comprehensive to ensure that the individual operator and or crew had again achieved the required skills to retum to licensed duties, i Conclusions The inspectors concluded that the remediation plans addressed individual and crew performance weaknesse .6 Conformance with Ooerator License Conditions insoection Scone (71001)
The inspectors reviewed the following documents to assess the licensee's compliance with 10 CFR 55.53, " License condition requirements," and 10 CFR 55.21, " Medical examination."
e Systems approach to training program record * Requalification training record *- Licensed operator medical record Observations and Findinas The facility licensee's records for both active and inactive licenses covering the current two year requalification period were requested and reviewed. The records were easily retrieved by the licensee and contained sufficient documented details to compare facility licensee's activities to the requirements of 10 CFR 55.53 and 10 CFR 55.2 Conclusions The inspectors did not identify any non-compliance items associated with the requirements of 10 CFR 55.53 and 10 CFR 55.21,
_. .. _ __
.
.
.
.
05.7 Follow-un of Previousiv Identified Weaknesses The inspectors reviewed the two identified weaknesses from the last LORT program inspection (NRC Inspection Reports 50-456/95012(DRS); 50457/95012(DRS). Both weaknesses were associated with JPMs. - One involved the evaluator not having the candidate properly demonstrate the required job skills for the task. The second involved the lack of management attention in performing audits of JPM evaluator's skills during administration of in-plant JPM The inspectors reviewed both the Training Department Instruction (TDl) and the associated documentation for the identified weaknesses. The inspectors noted that corrective actions were effective in eliminating both weakness.
I
V. Management Meetings X1 Exit Meetino Summarv
-
,
The inspectors presented the inspection results to members of licensee management on August 15,1997. The licensee acknowledged the findings presente The inspectors asked the licensee whether any materials examined during the inspection could be considered proprietary. No proprietary information was identifie Attachment: Simulation Facility Report
,
'
. .
!
.
PARTIAL LIST OF PERSONS CONTACTED Licensee
- D. Burton, Operations Training Coordinator
- M. Cassidy, Regulatory Assurance - NRC Coordinator
- C. Cerovac, Operations Training Superintendent
- S. Deprest, Operations Training Instructor
- R. Gayheart, Licensed Operator Requalification Training Coordinator
- E. Hendrix, Operations Staff Superintendent
- J. Natewajka, ISEG Supervisor
- G. Stanley, Site Vice President
- J. Walker, Operations Training instructor
- R. Wegner, Operations Manager NELC
- P. Cataldo, Reactor Engineer
- C. Phillips, Senior Resident inspector
- E. Plettner, Reactor Engineer
- Denotes those present at the exit on August 15; 199 IN5PECTION PROCEDURES USED IP 71001: Licensed Operator Requalification Program Evaluation IP 71'07: Plant Operations ITEMS OPENED, CLOSED, AND DISCUSSED None
, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - - - __
,
4 g
Attachment 1
,
SIMULATION FACILITY REPORT Facility Licensee: Braldwood Units 1 and 2 l Facility Licensee Dockets No: 50-456,50-457 Operating Tests Administered: August 13 14,1997 This form is to be used only to report observations. These observations do not constitute audit or inspection finf. age and are not, without further verification and review, indicative of noncompliance with 10 CFR 55.45(b). These observations do not affect NRC certification or approval of the simulation facility other than to provide information that may be used in future evaluations. No licensee action is required in response to those observation While conducting the simulator portion of the operating tests, the following items were observed (if none, so state):
IIEM DESCRIPTION NONE OBSERVED a