Change PC-03,Rev 21 to Work Plan 1903.030, Evacuation
ML20217K300
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/08/1997
From:
ENTERGY OPERATIONS, INC.
To:
References
1903.030-01, 1903.030-1, NUDOCS 9708150190
Download: ML20217K300 (3)


Text

< .

5D-3al3cf Arkansas Nuclear One- Administrathe Senices Document Control Friday, August 08,1997 Document Update Notification

= = = = = = = = = = - - _ = = -

COPYHOLDER NO: 103 TO: NRC - WASillNGTON ADDRESS: DOC CNTRL DESK MAIL STOP PI-37 WASlIINGTON DC 20555 DOCUMENTNO: OP-1903.030 7777E EVACUATION 4

REl'/SION NO: 21-03-00 CHANGE NO: PC-03

SUBJECT:

PERNIANENT ClIANGE (PC)

]

If this bar is checked, please sign, date, and return transmittal in envelope provided, f ANO-l Docket 50-313 ANO-2 Docket 50-3tW Siputure Date

==:= = ._==----:======-=-_,_-,-_._..=_._==-

9708150190 970808

^~

PDR ADOCK 05000313 P pon

l ENTERGY OPERATIONS INCORPORATED ARKANSAS NUCLEAR ONE eo er >s

!O TITLE: EVACUADON PROC / WORK PLAN NO.

19%.C30 REY.

21 e

SAFETYJtELATED l E.XP. DATE N/A Bus ONO

,$oE1 0 , ;u suo CONTROLLED COPY # /03 "

,= c ' ,-

SW CM ,

2

^

3 4

=

to 5

o s

Act O

leW 15 16 17 use Nobody's perf 18 pc.aN 2 ..

DATE TIME 19 It - A VERIFIED BY 20 ft. \ ,i:L 21 22 It - A 23 Pc. 2 24 'Pc J.

e b

1 APPROVAL DATE:

l APPROVNL AUTHORITY: 24W O ~

REQUIRED EFFECTNE DATE:

FORM NO. REV.

FORM Ti 1000.006A 42 PC-1 UST OF AFFECTED PAGES

I

\ e Page 18 of 24 Page 1 of 7 NOTE This checklist contains three (3) sections.

SHIFT SUPERINTENDENT IMPIJ2ENTATION OF CHECKLIST

  • Complete Sections 1, 2 and 3 of this checklist if you have Emergency Direction and Control.
  • Complete Section 3 only, as instructed by the TSC Director, whenever the TSC Pg Director or EOF Director has Emergency Direction and Control.

e TSC DIRECTOR IMPLEMENTATION OF CHECKLIST

  • Complete Sections 1 and 2 if you or the EOF Director have assumed Dmergency Direction and Control.
  • Direct the Shift Superintendent to complete Section 3 following your decision concerning evacuation.

SECTION 1 - EVACUATION DETERMINATION NOTE 09 It is the intent of this procedure to evacuate personnel when any of the

' initiating conditions exists. Using extenuating circumstances to delay or abort an evacuation should be considered carefully.

1.0 Determine if any Initiating Conditions listed below are present

("'gf (then proceed to step 2).

CIRCLE ONE t

\- ' l.1 Site Area or General Emergency has been declared. Yes No 1.2 General area radiation levels outside of a Radiologically Yes No controlled Area exceeds 2.5 mrem /hr, which is attributed to a loss of control of radioactive material and the threat cannot be confined to a well-defined area.

1.3 Unevaluated airborne radioactivity exceeds 9E-10 pC1/cc, Yes No which is attributed to a loss of control of radioactive material and the threat cannot be confined to a well defined area.

1.4 An uncontrolled toxic gas leak (originating either Yes No on-site or off-site) where the hazard is not confined to a local area.

2.0 Determine if any of the Extenuating conditions listed below, which might preclude immediate evacuation, are present (then proceed to step 3).

2.1 An ongoing security threat within the protected area Yes No (consult with the Security Shift Commander to aid in determining the safest course of action).

2.2 Inclement weather (e.g., tornado, high winds, hazardous Yes No road conditions that may preclude a safe evacuation of plant personnel).

2.3 Radiological or Hazardous Materials conditions exist Yes No which would subject evacuees to higher exposure / risk to s personnel safety.

\~ l 2.4 Other hazards exist which might subject evacuees to a Yes No higher risk to personnel safety.

FORM NO. REV.

FORM T6TLE PLANT EVACUATION CHECKLIST 1903.030B 21, PC-3