Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K3161999-10-19019 October 1999 Forwards Amend 195 to License DPR-61 & Safety Evaluation. Amend Deletes Certain TSs Either No Longer Applicable to Permanently Shutdown & Defueled State of Reactor or Duplicate Regulatory Requirements CY-99-137, Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam1999-10-12012 October 1999 Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam DD-99-11, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 9910041999-10-0808 October 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 991004 ML20212L1261999-10-0404 October 1999 Forwards Viewgraphs Presented by Licensee at 990923 Meeting with Nrc,In Response to Request ML20212D0341999-09-20020 September 1999 Expresses Appreciation for Accepting NRC Request for Tour of Haddam Neck Facility During on 991014.Invites R Mellor to Participate in NRC 1999 Decommissioninng Power Reactor Work- Shop:Nrc Insp Program at Decommissioning Power Reactors CY-99-111, Submits Clarification of Changes Made to Connecticut Yankee QA Program,Per Util 990810 Submittal.Change Will Be Submitted to NRC in Dec 1999 as Part of Annual Update1999-09-0202 September 1999 Submits Clarification of Changes Made to Connecticut Yankee QA Program,Per Util 990810 Submittal.Change Will Be Submitted to NRC in Dec 1999 as Part of Annual Update ML20211E8051999-08-20020 August 1999 Forwards Insp Rept 50-213/99-02 on 990420-0719.No Violations Noted.Completion of Corrective Actions for Spent Fuel Bldg Ventilation Issues Adequate ML20210J6021999-08-0202 August 1999 Informs That Info Re Orise Technical Survey Assistance to NRC at CT Yankee Is to Include Copies of Listed Documents CY-99-048, Forwards Cyap Rept CY-HP-0031,Rev 0, Bounding Dose Assessment for Offsite Radioactive Matls1999-07-29029 July 1999 Forwards Cyap Rept CY-HP-0031,Rev 0, Bounding Dose Assessment for Offsite Radioactive Matls CY-99-066, Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors1999-07-20020 July 1999 Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors ML20210C1491999-07-0101 July 1999 Responds to ,Which Responded to NRC Ltr & NOV & Informs That Engagement in Any Similar Wrongdoing in Future May Result in More Significant Enforcement Action. No Further Action Will Be Taken at This Time ML20209C3911999-06-30030 June 1999 Forwards TS Page 6-3 for Haddam Neck Plant ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML20195F9011999-06-0909 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 50-213/98-06 on 990226. Util Did Not Agree with Disposition of Issue Cited as Severity Level IV Violation.Violation Will Be Noncited ML20195H3591999-06-0202 June 1999 Responds to NRC Re Violations Noted in Insp of License DPR-61.Corrective Actions:Disciplinary Actions Were Taken by Util Against Jm Foley & Individual & Departmental Emphasis Is Placed on New HP Stds & Expectations ML20207E9031999-06-0202 June 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Mt Masnik Will Be Section Chief for Haddam Neck.Organization Chart Encl ML20207B9301999-05-25025 May 1999 Responds to 990114 Correspondence Re Changes to Plant Defueled Physical Security Plan Rev 1 Submitted Under 10CFR50.54(p).Implementation of Changes Subj to Insp to Confirm Changes Have Not Decreased Security Plan ML20207G1761999-05-21021 May 1999 Forwards Insp Rept 50-213/99-01 on 980119-990419 & Closure of CAL 1-97-010.No Violations Noted.Conduct of Activities Associated with Control of Radiological Work at Haddam Neck Generally Characterized as Careful & Thorough ML20206R7221999-05-12012 May 1999 Refers to Investigation 1-97-031 on 970616-0718 & Forwards Nov.Investigation Found That Recipient Deliberately Did Not Follow Radiation Protection Procedures,Falsified Documents & Provided Incomplete & Inaccurate Info to NRC ML20206R7021999-05-12012 May 1999 Refers to Investigation 1-97-008 Conducted by Region I & Forwards Notice of Violation.Investigation Found That Recipient Deliberately Attempted to Conceal Release of Contaminated Video Equipment ML20206R8051999-05-12012 May 1999 Responds to 3 Investigations,Repts 1-97-031,008 & 1-98-008 Between 970314 & 980722 as Well as Insp Conducted Between 980720 & 1102.Forwards Synopsis of 3rd OI Investigation ML20206J2801999-04-30030 April 1999 Forwards 1998 Annual Financial Repts for CT Light & Power Co,Western Ma Electric Co,Public Svc Co of Nh,North Atlantic Energy Corp,Northeast Nuclear Energy Co & North Atlantic Energy Svc Corp,License Holders CY-99-057, Forwards 1998 Annual Radioactive Effluent Rept for HNP, & Rev 10 to Remodcm. with Summary of Quantities of Solid Radwaste & Liquid & Gaseous Effluents,As Well as Summary of Assessment of Max Individual Dose1999-04-30030 April 1999 Forwards 1998 Annual Radioactive Effluent Rept for HNP, & Rev 10 to Remodcm. with Summary of Quantities of Solid Radwaste & Liquid & Gaseous Effluents,As Well as Summary of Assessment of Max Individual Dose ML20206C8631999-04-28028 April 1999 Forwards Amend 194 to License DPR-61 & Safety Evaluation. Amend Authorizes Relocation of Requirements Related to Seismic Monitoring Instrumentation from TSs to Technical Requirements Manual ML20206A6871999-04-22022 April 1999 Informs of Completion of Review of Re Nepco in Capacity as Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee Atomic Power Co ML20210V5221999-04-0808 April 1999 Discusses Continued Performance of Technical Assistance Activities for NRC & Environ Survey & Site Assessment Program (Essap) Survey Assistance at Cy IR 05000213/19960121999-04-0505 April 1999 Discusses NRC Insp Repts 50-213/96-12 & 50-213/98-04 on 961102-27 Re Airborne Radioactivity Contamination Event That Occurred in Fuel Transfer Canal & Reactor Cavity in Nov 1996.Notice of Violation Encl ML20205J7931999-04-0505 April 1999 Discusses NRC Insp Repts 50-213/96-12 & 50-213/98-04 on 961102-27 Re Airborne Radioactivity Contamination Event That Occurred in Fuel Transfer Canal & Reactor Cavity in Nov 1996.Notice of Violation Encl CY-99-042, Provides Info on Status of Decommissioning Funding for Haddam Neck Plant1999-03-31031 March 1999 Provides Info on Status of Decommissioning Funding for Haddam Neck Plant ML20206A6951999-03-29029 March 1999 Request Confirmation That No NRC Action or Approval,Required Relative to Proposed Change in Upstream Economic Ownership of New England Power Co,Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee CY-99-024, Responds to Violations Noted in Insp Rept 50-213/98-06. Corrective Actions:Meetings Were Held with Contractor Mgt, Disciplinary Action Against Worker Was Taken & Notices Alerting Workers to HRA Controls Were Posted1999-03-29029 March 1999 Responds to Violations Noted in Insp Rept 50-213/98-06. Corrective Actions:Meetings Were Held with Contractor Mgt, Disciplinary Action Against Worker Was Taken & Notices Alerting Workers to HRA Controls Were Posted B17697, Notifies NRC of Amount of Property Insurance Coverage, Effective 990401,for HNP & Mnps,Units 1,2 & 3,per Provisions of 10CFR50.54(w)1999-03-12012 March 1999 Notifies NRC of Amount of Property Insurance Coverage, Effective 990401,for HNP & Mnps,Units 1,2 & 3,per Provisions of 10CFR50.54(w) CY-99-032, Clarifies Info Re TRM Change Submitted with Re Proposed Rev to TSs on Seismic Monitoring1999-03-0909 March 1999 Clarifies Info Re TRM Change Submitted with Re Proposed Rev to TSs on Seismic Monitoring ML20207B6641999-02-26026 February 1999 Forwards Insp Rept 50-213/98-06 on 981103-990118 & Notice of Violation Re Locked High Radiation Area Doors That Were Found Unlocked by Staff.Security Program Was Also Inspected ML20204C6901999-02-22022 February 1999 Informs That Public Citizen Waives Copyright for 5th Edition of Nuclear Lemon So NRC May Reproduce for Purpose of Contributing to NRC Recommended Improvements to Oversight Process for Nuclear Power Reactors ML20203H9621999-02-17017 February 1999 Responds to to Dk Rathbun Which Forwarded Number of Questions from Constituent Re Spent Fuel Decommissioned Nuclear plants.NUREG-1628, Staff Responses to Frequently Asked Questions Re Decommissioning of NPPs Encl.W/O Encl CY-99-005, Responds to NRC 981221 RAI Re Amend 193 to License to Reflect Permanent Shutdown Condition of Plant.Licensee Withdrawing 981030 (CY-98-199) Request & Will Submit Corrections in Future Proposed Rev to TS1999-01-29029 January 1999 Responds to NRC 981221 RAI Re Amend 193 to License to Reflect Permanent Shutdown Condition of Plant.Licensee Withdrawing 981030 (CY-98-199) Request & Will Submit Corrections in Future Proposed Rev to TS CY-99-023, Provides Summary of Understandings Reached During 990108 Meeting Between Util & CT Dept of Environ Protection Re Dike Area Rainwater Reporting Protocol1999-01-28028 January 1999 Provides Summary of Understandings Reached During 990108 Meeting Between Util & CT Dept of Environ Protection Re Dike Area Rainwater Reporting Protocol ML20203H9711999-01-21021 January 1999 Requests Response to Concerns Raised by Constitutent M Marucci Re Spent Fuel at Decommissioned Nuclear Plants CY-99-002, Forwards Response to NRC 981203 RAI Re Proposed License Amend to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TS to Trm. Supporting TSs Encl1999-01-18018 January 1999 Forwards Response to NRC 981203 RAI Re Proposed License Amend to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TS to Trm. Supporting TSs Encl CY-99-010, Provides Special Rept Concerning Potential of Radiation Exposure Due to Hypothetical Explosive Attack to Facility. Without Encl1999-01-14014 January 1999 Provides Special Rept Concerning Potential of Radiation Exposure Due to Hypothetical Explosive Attack to Facility. Without Encl CY-99-009, Forwards Rev 1 to Haddam Neck Plant Defueled Physical Security Plan,Per 10CFR50.54(p).Rev Does Not Decrease Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 & 2.7901999-01-14014 January 1999 Forwards Rev 1 to Haddam Neck Plant Defueled Physical Security Plan,Per 10CFR50.54(p).Rev Does Not Decrease Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 & 2.790 ML20206R6051999-01-11011 January 1999 Ack Receipt of Submiting Sf Mgt Plan.Staff Has Reviewed Plan & Notes Plan to Store Sf in SFP Until DOE Takes Physical Possession of Fuel DD-98-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-98-12 Has Expired.Decision Became Final Agency Action on 981211. with Certificate of Svc.Served on 9812221998-12-22022 December 1998 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-98-12 Has Expired.Decision Became Final Agency Action on 981211. with Certificate of Svc.Served on 981222 CY-98-142, Forwards Proposed Rev 2 of Cyap QAP for Info & Approval of Exception Number 8 of App E of Cy Qap.Copy of Rev 2 Showing Changes from Rev 1 Also Included1998-12-22022 December 1998 Forwards Proposed Rev 2 of Cyap QAP for Info & Approval of Exception Number 8 of App E of Cy Qap.Copy of Rev 2 Showing Changes from Rev 1 Also Included ML20198R1321998-12-21021 December 1998 Forwards Insp Rept 50-213/98-05 on 980720-1102.No Violations Noted.Insp Completes Review of Licensee Actions Described in ,In Response to NOV & Proposed Imposition of Civil Penalties ML20198K8651998-12-21021 December 1998 Ack Receipt of ,Requesting Corrected Pages to Be Issued for License Amend 193,issued on 980630.Informs That Inconsistencies Found When Comparing Corrected Pages Submitted on 981030 & License Amend Application CY-98-201, Provides Clarification of NRC Staff SE for Amend 193 Which Approved HNP Defueled TSs1998-12-0303 December 1998 Provides Clarification of NRC Staff SE for Amend 193 Which Approved HNP Defueled TSs IR 05000213/19980041998-11-27027 November 1998 Forwards Special Insp Rept 50-213/98-04 of Licensee Performance During Reactor Coolant Sys Chemical Decontamination ML20195J3571998-11-19019 November 1998 Forwards Exemption from Certain Requirements of 10CFR50.54(w) & 10CFR140.Exemption Submitted in Response to 971007 Application & Suppls & 1218,requesting Reduction in Amount of Insurance Required for Facility 1999-09-20
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARCY-99-137, Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam1999-10-12012 October 1999 Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam CY-99-111, Submits Clarification of Changes Made to Connecticut Yankee QA Program,Per Util 990810 Submittal.Change Will Be Submitted to NRC in Dec 1999 as Part of Annual Update1999-09-0202 September 1999 Submits Clarification of Changes Made to Connecticut Yankee QA Program,Per Util 990810 Submittal.Change Will Be Submitted to NRC in Dec 1999 as Part of Annual Update CY-99-048, Forwards Cyap Rept CY-HP-0031,Rev 0, Bounding Dose Assessment for Offsite Radioactive Matls1999-07-29029 July 1999 Forwards Cyap Rept CY-HP-0031,Rev 0, Bounding Dose Assessment for Offsite Radioactive Matls CY-99-066, Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors1999-07-20020 July 1999 Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors ML20209C3911999-06-30030 June 1999 Forwards TS Page 6-3 for Haddam Neck Plant ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML20195H3591999-06-0202 June 1999 Responds to NRC Re Violations Noted in Insp of License DPR-61.Corrective Actions:Disciplinary Actions Were Taken by Util Against Jm Foley & Individual & Departmental Emphasis Is Placed on New HP Stds & Expectations CY-99-057, Forwards 1998 Annual Radioactive Effluent Rept for HNP, & Rev 10 to Remodcm. with Summary of Quantities of Solid Radwaste & Liquid & Gaseous Effluents,As Well as Summary of Assessment of Max Individual Dose1999-04-30030 April 1999 Forwards 1998 Annual Radioactive Effluent Rept for HNP, & Rev 10 to Remodcm. with Summary of Quantities of Solid Radwaste & Liquid & Gaseous Effluents,As Well as Summary of Assessment of Max Individual Dose ML20206J2801999-04-30030 April 1999 Forwards 1998 Annual Financial Repts for CT Light & Power Co,Western Ma Electric Co,Public Svc Co of Nh,North Atlantic Energy Corp,Northeast Nuclear Energy Co & North Atlantic Energy Svc Corp,License Holders ML20210V5221999-04-0808 April 1999 Discusses Continued Performance of Technical Assistance Activities for NRC & Environ Survey & Site Assessment Program (Essap) Survey Assistance at Cy CY-99-042, Provides Info on Status of Decommissioning Funding for Haddam Neck Plant1999-03-31031 March 1999 Provides Info on Status of Decommissioning Funding for Haddam Neck Plant ML20206A6951999-03-29029 March 1999 Request Confirmation That No NRC Action or Approval,Required Relative to Proposed Change in Upstream Economic Ownership of New England Power Co,Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee CY-99-024, Responds to Violations Noted in Insp Rept 50-213/98-06. Corrective Actions:Meetings Were Held with Contractor Mgt, Disciplinary Action Against Worker Was Taken & Notices Alerting Workers to HRA Controls Were Posted1999-03-29029 March 1999 Responds to Violations Noted in Insp Rept 50-213/98-06. Corrective Actions:Meetings Were Held with Contractor Mgt, Disciplinary Action Against Worker Was Taken & Notices Alerting Workers to HRA Controls Were Posted B17697, Notifies NRC of Amount of Property Insurance Coverage, Effective 990401,for HNP & Mnps,Units 1,2 & 3,per Provisions of 10CFR50.54(w)1999-03-12012 March 1999 Notifies NRC of Amount of Property Insurance Coverage, Effective 990401,for HNP & Mnps,Units 1,2 & 3,per Provisions of 10CFR50.54(w) CY-99-032, Clarifies Info Re TRM Change Submitted with Re Proposed Rev to TSs on Seismic Monitoring1999-03-0909 March 1999 Clarifies Info Re TRM Change Submitted with Re Proposed Rev to TSs on Seismic Monitoring ML20204C6901999-02-22022 February 1999 Informs That Public Citizen Waives Copyright for 5th Edition of Nuclear Lemon So NRC May Reproduce for Purpose of Contributing to NRC Recommended Improvements to Oversight Process for Nuclear Power Reactors CY-99-005, Responds to NRC 981221 RAI Re Amend 193 to License to Reflect Permanent Shutdown Condition of Plant.Licensee Withdrawing 981030 (CY-98-199) Request & Will Submit Corrections in Future Proposed Rev to TS1999-01-29029 January 1999 Responds to NRC 981221 RAI Re Amend 193 to License to Reflect Permanent Shutdown Condition of Plant.Licensee Withdrawing 981030 (CY-98-199) Request & Will Submit Corrections in Future Proposed Rev to TS ML20203H9711999-01-21021 January 1999 Requests Response to Concerns Raised by Constitutent M Marucci Re Spent Fuel at Decommissioned Nuclear Plants CY-99-002, Forwards Response to NRC 981203 RAI Re Proposed License Amend to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TS to Trm. Supporting TSs Encl1999-01-18018 January 1999 Forwards Response to NRC 981203 RAI Re Proposed License Amend to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TS to Trm. Supporting TSs Encl CY-99-009, Forwards Rev 1 to Haddam Neck Plant Defueled Physical Security Plan,Per 10CFR50.54(p).Rev Does Not Decrease Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 & 2.7901999-01-14014 January 1999 Forwards Rev 1 to Haddam Neck Plant Defueled Physical Security Plan,Per 10CFR50.54(p).Rev Does Not Decrease Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 & 2.790 CY-99-010, Provides Special Rept Concerning Potential of Radiation Exposure Due to Hypothetical Explosive Attack to Facility. Without Encl1999-01-14014 January 1999 Provides Special Rept Concerning Potential of Radiation Exposure Due to Hypothetical Explosive Attack to Facility. Without Encl CY-98-142, Forwards Proposed Rev 2 of Cyap QAP for Info & Approval of Exception Number 8 of App E of Cy Qap.Copy of Rev 2 Showing Changes from Rev 1 Also Included1998-12-22022 December 1998 Forwards Proposed Rev 2 of Cyap QAP for Info & Approval of Exception Number 8 of App E of Cy Qap.Copy of Rev 2 Showing Changes from Rev 1 Also Included CY-98-201, Provides Clarification of NRC Staff SE for Amend 193 Which Approved HNP Defueled TSs1998-12-0303 December 1998 Provides Clarification of NRC Staff SE for Amend 193 Which Approved HNP Defueled TSs CY-98-191, Provides Notification That Util Implemented Defueled Emergency Plan for HNP on 981001.Util Completed Annual Exercise Required by Subj Plan & 10CFR50.471998-11-0505 November 1998 Provides Notification That Util Implemented Defueled Emergency Plan for HNP on 981001.Util Completed Annual Exercise Required by Subj Plan & 10CFR50.47 CY-98-140, Provides Commitment to Maintain Water Chemistry Requirements in HNP Technical Requirements Manual1998-11-0202 November 1998 Provides Commitment to Maintain Water Chemistry Requirements in HNP Technical Requirements Manual CY-98-183, Forwards Revised License Amend 193 TS Pages to Correct Amend Number on Pages Not Changed by Amend 193.No Commitments Contained within Ltr1998-10-30030 October 1998 Forwards Revised License Amend 193 TS Pages to Correct Amend Number on Pages Not Changed by Amend 193.No Commitments Contained within Ltr CY-98-199, Forwards Listing of Corrections Made & Revised Pages for Proposed License Amend 193.Ltr Also Transmits Repaginated Pages for TS Index & Section 1,per Request of NRC Project Manager1998-10-30030 October 1998 Forwards Listing of Corrections Made & Revised Pages for Proposed License Amend 193.Ltr Also Transmits Repaginated Pages for TS Index & Section 1,per Request of NRC Project Manager CY-98-062, Updates Info of Historical Nature in Response to Both NRC Historical Review Rept & NRC Insp Rept 50-213/97-11 Open Items1998-10-28028 October 1998 Updates Info of Historical Nature in Response to Both NRC Historical Review Rept & NRC Insp Rept 50-213/97-11 Open Items CY-98-154, Forwards Sf Mgt Plan for Haddam Neck Plant.Plan Submits Info on Mgt & Funding for Program to Safely Store Sf Following Permanent Cessation of Power Operations Until Title Is Transferred to DOE1998-10-28028 October 1998 Forwards Sf Mgt Plan for Haddam Neck Plant.Plan Submits Info on Mgt & Funding for Program to Safely Store Sf Following Permanent Cessation of Power Operations Until Title Is Transferred to DOE CY-98-129, Provides Supplemental Info to 980629 Response to 2.206 Petition Questions on Spent Fuel Cooling Methods.Util Pending Commitment Made within Ltr Stated1998-10-14014 October 1998 Provides Supplemental Info to 980629 Response to 2.206 Petition Questions on Spent Fuel Cooling Methods.Util Pending Commitment Made within Ltr Stated CY-98-186, Provides Notification of Organizational Changes Which Affect Cyap.Organization Chart,Biographical Profile of K Heider & Revised Distribution List for NRC Correspondence,Encl1998-10-0202 October 1998 Provides Notification of Organizational Changes Which Affect Cyap.Organization Chart,Biographical Profile of K Heider & Revised Distribution List for NRC Correspondence,Encl CY-98-153, Forwards Final Response to NRC 961009 RAI Re Configuration Mgt Project at Plant.No New Commitments Made within Ltr or Attachment1998-09-30030 September 1998 Forwards Final Response to NRC 961009 RAI Re Configuration Mgt Project at Plant.No New Commitments Made within Ltr or Attachment CY-98-157, Responds to NRC Request That Cyap Submit Proposed License Amend to Include Fuel Storage Pool Water Chemistry Program within Haddam Neck Plant Ts.Cyap Considers That Amend Is Not Necessary for Listed Reasons.Procedure Encl1998-09-28028 September 1998 Responds to NRC Request That Cyap Submit Proposed License Amend to Include Fuel Storage Pool Water Chemistry Program within Haddam Neck Plant Ts.Cyap Considers That Amend Is Not Necessary for Listed Reasons.Procedure Encl B17440, Corrects Errors in Ltrs & 980225 Re semi-annual Fitness for Duty Performance Data for Jan-June 1998 & July-Dec 19971998-09-24024 September 1998 Corrects Errors in Ltrs & 980225 Re semi-annual Fitness for Duty Performance Data for Jan-June 1998 & July-Dec 1997 CY-98-151, Responds to NRC Re Violations Noted in Insp Rept 50-213/98-03.Corrective Actions:Root Cause Team Has Determined That Shift Managers Initial Reportability Decision Was Not Correct1998-09-21021 September 1998 Responds to NRC Re Violations Noted in Insp Rept 50-213/98-03.Corrective Actions:Root Cause Team Has Determined That Shift Managers Initial Reportability Decision Was Not Correct ML20153G3891998-09-14014 September 1998 Informs That Union of Concerned Scientists Fully Supports Citizens Awareness Network Petition Filed Pursuant to 10CFR2.206,seeking to Revoke or Suspend License for Haddam Neck Nuclear Plant ML20154J9861998-09-11011 September 1998 Forwards for Service Upon Lj Callan,Jc Hoyle & Commission, Request for NRC to Revoke Connecticut Yankee Atomic Power Co License to Operate Haddam Neck Reactor Pursuant to 10CFR2.206 ML20154J9991998-09-11011 September 1998 Requests NRC Take Immediate Action to Revoke Util License to Operate Haddam Neck Nuclear Power Station Pursuant to 10CFR2.206 B17420, Forwards Semiannual fitness-for-duty Performance Data for Jan-June 1998,per 10CFR26.71(d)1998-08-31031 August 1998 Forwards Semiannual fitness-for-duty Performance Data for Jan-June 1998,per 10CFR26.71(d) CY-98-107, Forwards Decommissioning Cost Study for Connecticut Yankee Nuclear Power Plant. Adjustments to Cost Estimate Will Be Made as Necessary as Detailed Work Planning Progresses & Elements of Cost Estimate Periodically Reviewed & Updated1998-08-25025 August 1998 Forwards Decommissioning Cost Study for Connecticut Yankee Nuclear Power Plant. Adjustments to Cost Estimate Will Be Made as Necessary as Detailed Work Planning Progresses & Elements of Cost Estimate Periodically Reviewed & Updated B17384, Submits fitness-for-duty Program Rept for Investigations Re Unsatisfactory Performance Test Results,Per 10CFR26,App a, Subpart B,Section 2.8(e)(4).No New Commitments Are Contained in Ltr1998-08-20020 August 1998 Submits fitness-for-duty Program Rept for Investigations Re Unsatisfactory Performance Test Results,Per 10CFR26,App a, Subpart B,Section 2.8(e)(4).No New Commitments Are Contained in Ltr CY-98-141, Requests Postponement of Defueled Emergency Plan Exercise Until 980923.Ltr Contains No New Commitments1998-08-13013 August 1998 Requests Postponement of Defueled Emergency Plan Exercise Until 980923.Ltr Contains No New Commitments CY-98-145, Provides Remediation Plans for Offsite Location 9621.Work Associated W/Location 9621 Scheduled to Begin on 9808171998-08-13013 August 1998 Provides Remediation Plans for Offsite Location 9621.Work Associated W/Location 9621 Scheduled to Begin on 980817 CY-98-132, Provides NRC W/Addl Info on Plant Defueled Emergency Plan. Util Stores Resin Liners Inside Area Protected by Vehicle Barriers1998-07-31031 July 1998 Provides NRC W/Addl Info on Plant Defueled Emergency Plan. Util Stores Resin Liners Inside Area Protected by Vehicle Barriers CY-98-127, Provides Clarifying Info Re Spent Fuel Pool make-up Capability at Hnp.Conclusions Reached by NRC Staff in SER Contained in Issuance of License Amend 193 Not Impacted & & Remain Valid1998-07-30030 July 1998 Provides Clarifying Info Re Spent Fuel Pool make-up Capability at Hnp.Conclusions Reached by NRC Staff in SER Contained in Issuance of License Amend 193 Not Impacted & & Remain Valid CY-98-118, Informs NRC Staff That Rev 38 to Plant Emergency Plan Has Been Implemented1998-07-21021 July 1998 Informs NRC Staff That Rev 38 to Plant Emergency Plan Has Been Implemented CY-98-121, Responds to NRC Request for Addl Info on Recent Operational Events at Plant.Corrective Actions That Have Been Taken, Discussed1998-07-16016 July 1998 Responds to NRC Request for Addl Info on Recent Operational Events at Plant.Corrective Actions That Have Been Taken, Discussed ML20151Z0221998-07-10010 July 1998 Informs That R Bassilakis & Gejdenson Share Same Concerns Re Recent Incidents at Connecticut Yankee Reactor in Haddam Neck,Ct & Hope That NRC Address Concerns Promptly ML20236P0971998-07-0909 July 1998 Inquires About Truth of Cyap Having No Shift Compliment of Licensed Operators at Haddam Neck Reactor ML20239A0651998-07-0707 July 1998 Discusses 980620 Inadvertent Radwaste Discharge from Plant Reactor.Team of NRC Inspectors,Completely Independent of Region I,Requested to Investigate Region I Ability to Regulate Effectively 1999-09-02
[Table view] Category:UTILITY TO NRC
MONTHYEARB13622, Forwards Crdr Human Engineering Discrepancy Info for Plant1990-08-30030 August 1990 Forwards Crdr Human Engineering Discrepancy Info for Plant B13617, Requests NRC Revise Confirmatory Order for Plant to Specify New Completion Date of Cycle 16 Refueling Outage for Item II.E.1.2.Util Intends to Implement Design Change During Next Refueling Outage to Resolve Listed Issues1990-08-22022 August 1990 Requests NRC Revise Confirmatory Order for Plant to Specify New Completion Date of Cycle 16 Refueling Outage for Item II.E.1.2.Util Intends to Implement Design Change During Next Refueling Outage to Resolve Listed Issues B13615, Requests That 900705 Request for Amend to License DPR-61 Be Approved on Emergency Basis & That Temporary Waiver of Compliance from Tech Spec 4.4.6.2.1.g Be Given Until NRC Acts on Emergency Amend1990-08-20020 August 1990 Requests That 900705 Request for Amend to License DPR-61 Be Approved on Emergency Basis & That Temporary Waiver of Compliance from Tech Spec 4.4.6.2.1.g Be Given Until NRC Acts on Emergency Amend B13611, Forwards, Semiannual Radioactive Effluents Release Rept for Jan-June 19901990-08-16016 August 1990 Forwards, Semiannual Radioactive Effluents Release Rept for Jan-June 1990 B13595, Notifies NRC That Utils Volunteer to Participate in Emergency Response Data Sys Project for All Four Nuclear Units,Per Generic Ltr 89-15 & NUREG-13941990-08-14014 August 1990 Notifies NRC That Utils Volunteer to Participate in Emergency Response Data Sys Project for All Four Nuclear Units,Per Generic Ltr 89-15 & NUREG-1394 B13602, Submits Addendum to Plant Control Room Design Review Summary Rept,Per .Lists 10CFR50 App R-related Mods Outside Control Room That Could Not Be Reviewed Until After Final Implementation of Changes1990-08-14014 August 1990 Submits Addendum to Plant Control Room Design Review Summary Rept,Per .Lists 10CFR50 App R-related Mods Outside Control Room That Could Not Be Reviewed Until After Final Implementation of Changes B13580, Discusses Revised Tech Spec Conversion Program,Reflecting Conversion of Tech Spec to Westinghouse Sts.Future Upgrade of Tech Specs Should Be Conducted on Voluntary Basis Consistent W/Nrc Policy Statement1990-08-10010 August 1990 Discusses Revised Tech Spec Conversion Program,Reflecting Conversion of Tech Spec to Westinghouse Sts.Future Upgrade of Tech Specs Should Be Conducted on Voluntary Basis Consistent W/Nrc Policy Statement B13603, Withdraws 900731 Request for Temporary Waiver of Compliance W/Tech Spec 3.7.1.2 Re Inoperability of Auxiliary Feedwater Pumps1990-08-0202 August 1990 Withdraws 900731 Request for Temporary Waiver of Compliance W/Tech Spec 3.7.1.2 Re Inoperability of Auxiliary Feedwater Pumps B13601, Requests Temporary Waiver of Compliance from Tech Spec 3.7.1.2,allowing Plant to Remain in Mode 3 for Addl 14 Days Beyond Current Action Statement Limits W/One or of Two Auxiliary Feedwater Pumps Inoperable1990-07-31031 July 1990 Requests Temporary Waiver of Compliance from Tech Spec 3.7.1.2,allowing Plant to Remain in Mode 3 for Addl 14 Days Beyond Current Action Statement Limits W/One or of Two Auxiliary Feedwater Pumps Inoperable B13585, Provides Supplemental Response to Generic Ltr 89-19 Re Request for Action Concerning Resolution of Unresolved Safety Issue A-47.Plant Procedures Modified to Provide Operability Verification of Steam Generator Protection Sys1990-07-26026 July 1990 Provides Supplemental Response to Generic Ltr 89-19 Re Request for Action Concerning Resolution of Unresolved Safety Issue A-47.Plant Procedures Modified to Provide Operability Verification of Steam Generator Protection Sys B13571, Clarifies 900625 Tech Spec Change Request Re Limit of 160 Failed Fuel Rods for Cycle 16 Operation1990-07-19019 July 1990 Clarifies 900625 Tech Spec Change Request Re Limit of 160 Failed Fuel Rods for Cycle 16 Operation B13569, Forwards, Haddam Neck Plant Decommissioning Financial Assurance Certification Rept1990-07-18018 July 1990 Forwards, Haddam Neck Plant Decommissioning Financial Assurance Certification Rept ML20055E6791990-07-0606 July 1990 Responds to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. All Socket Welded Joints from Header Isolation motor-operated Valves to RCS for All 4 Loops Examined.No Recordable Indications Found ML20055D3461990-07-0303 July 1990 Responds to NRC Bulletin 90-001 Re Loss of Fill Oil Transmitters Mfg by Rosemount.Operability Determinations Performed & Documented for All Rosemount 1153 & 1154 Transmitters at Facility B13564, Provides NRC W/Info Re Plant Pressurizer as follow-up to 900607 Meeting.Info Particularly Concerns Disposition of Three Indications on Pressurizer Inner Surface & Discussion of Resolution of Previous Indication1990-06-29029 June 1990 Provides NRC W/Info Re Plant Pressurizer as follow-up to 900607 Meeting.Info Particularly Concerns Disposition of Three Indications on Pressurizer Inner Surface & Discussion of Resolution of Previous Indication ML20055D7191990-06-29029 June 1990 Amends 900604 Rev 13 to QA Program B13550, Responds to Generic Ltr 90-04, Request for Info on Status of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Implementation & Completion Tables for staff-imposed Requirements Encl1990-06-27027 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Implementation & Completion Tables for staff-imposed Requirements Encl B13364, Forwards Rev 19 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR2.790(a))1989-10-0505 October 1989 Forwards Rev 19 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR2.790(a)) B13376, Forwards Util Response to Generic Ltr 89-04 Re Guidance on Developing Acceptable Inservice Test Programs1989-10-0202 October 1989 Forwards Util Response to Generic Ltr 89-04 Re Guidance on Developing Acceptable Inservice Test Programs A08598, Provides Clarification of Util Position Re Emergency Notification Sys (ENS) & Health Physics Network (Hpn).Util Intends to Provide Two Separate Qualified Individuals for ENS & HPN Communications During Exercise Drills1989-10-0202 October 1989 Provides Clarification of Util Position Re Emergency Notification Sys (ENS) & Health Physics Network (Hpn).Util Intends to Provide Two Separate Qualified Individuals for ENS & HPN Communications During Exercise Drills B13375, Responds to Request for Addl Info Re Electrical Distribution Sys Design Associated W/New Switchgear Bldg.New Switchgear Bldg Provides Opportunity to Minimize Dependence on Motor Control Ctr 5 & Further Reduce Level of Risk1989-09-29029 September 1989 Responds to Request for Addl Info Re Electrical Distribution Sys Design Associated W/New Switchgear Bldg.New Switchgear Bldg Provides Opportunity to Minimize Dependence on Motor Control Ctr 5 & Further Reduce Level of Risk ML20248E4521989-09-29029 September 1989 Forwards Proposed Tech Spec Pages Omitted from 890728 Application for Amend to License DPR-61 Re Cycle 16 Reload B13374, Forwards Bimonthly Progress Rept 18 Re New Switchgear Bldg Const1989-09-27027 September 1989 Forwards Bimonthly Progress Rept 18 Re New Switchgear Bldg Const B13352, Requests Exemption from Certain Requirements of 10CFR50,App J to Assure That Containment Leakage During Design Basis Event Will Not Exceed Applicable Leakage Limits. Justification Encl1989-09-0808 September 1989 Requests Exemption from Certain Requirements of 10CFR50,App J to Assure That Containment Leakage During Design Basis Event Will Not Exceed Applicable Leakage Limits. Justification Encl A08170, Forwards Updated Schedules for Operator Licensing & Requalification Exams for Plants,Per Generic Ltrs 89-12 & 89-031989-08-30030 August 1989 Forwards Updated Schedules for Operator Licensing & Requalification Exams for Plants,Per Generic Ltrs 89-12 & 89-03 B13346, Forwards Tornado Missile Risk Analysis of Bleed & Feed & Auxiliary Feedwater Safe Shutdown Sys at Connecticut Yankee Atomic Power Station, Per SEP Topics III-2 & III-4.A1989-08-30030 August 1989 Forwards Tornado Missile Risk Analysis of Bleed & Feed & Auxiliary Feedwater Safe Shutdown Sys at Connecticut Yankee Atomic Power Station, Per SEP Topics III-2 & III-4.A B13351, Provides Clarifications of Util & NRC 890525 Insp Rept 50-213/89-200.Util Proposes to Extend Schedule for Completion of Sampling and Evaluation Program to 900930 & Valves That Fail Systematic Testing Will Be Replaced1989-08-28028 August 1989 Provides Clarifications of Util & NRC 890525 Insp Rept 50-213/89-200.Util Proposes to Extend Schedule for Completion of Sampling and Evaluation Program to 900930 & Valves That Fail Systematic Testing Will Be Replaced A08237, Confirms Receipt of Listed Invoices for Costs Incurred During Routine Insps1989-08-28028 August 1989 Confirms Receipt of Listed Invoices for Costs Incurred During Routine Insps B13340, Submits Results of Svc Water & Primary Auxiliary Bldg Equipment Operability Analyses Not Provided in 890428 Submittal of Results of ECCS Single Failure Analysis1989-08-24024 August 1989 Submits Results of Svc Water & Primary Auxiliary Bldg Equipment Operability Analyses Not Provided in 890428 Submittal of Results of ECCS Single Failure Analysis A08211, Ack Receipt of Listed Invoices for Cost Incurred During Routine Insps at Plants.Payment Will Be Made on 8909061989-08-22022 August 1989 Ack Receipt of Listed Invoices for Cost Incurred During Routine Insps at Plants.Payment Will Be Made on 890906 B13341, Forwards WCAP-12196, Svc Water Sys Design Basis Temp Increase to 95 F for Connecticut Yankee & Haddam Neck Plant, Per Request in Amend 112 to License DPR-61.Northeast Utils Svc Co Suppl to Rept Also Encl1989-08-21021 August 1989 Forwards WCAP-12196, Svc Water Sys Design Basis Temp Increase to 95 F for Connecticut Yankee & Haddam Neck Plant, Per Request in Amend 112 to License DPR-61.Northeast Utils Svc Co Suppl to Rept Also Encl B13339, Forwards Addl Info Re Util 881026 & 890306 Revised Tech Specs Requests,Per NRC Request.Existing 8 H Shift Frequency Does Not Provide Enough Latitude within 8 H Shift Whereas 12 H Shift Would1989-08-21021 August 1989 Forwards Addl Info Re Util 881026 & 890306 Revised Tech Specs Requests,Per NRC Request.Existing 8 H Shift Frequency Does Not Provide Enough Latitude within 8 H Shift Whereas 12 H Shift Would B13342, Provides Util Position Re Procurement of non-code Class Fasteners in ASME Code Class Applications from Mfg or Matl Suppliers,Per Util to NRC & Insp Rept 50-423/88-18.App B Program Assures Use of Equivalent Items1989-08-15015 August 1989 Provides Util Position Re Procurement of non-code Class Fasteners in ASME Code Class Applications from Mfg or Matl Suppliers,Per Util to NRC & Insp Rept 50-423/88-18.App B Program Assures Use of Equivalent Items A08186, Ack Receipt of Listed Invoices for Cost Incurred During Insps.Funds Will Be wire-transferred on 8908241989-08-0808 August 1989 Ack Receipt of Listed Invoices for Cost Incurred During Insps.Funds Will Be wire-transferred on 890824 B13336, Forwards Annual Occupational Exposure Rept 19881989-08-0808 August 1989 Forwards Annual Occupational Exposure Rept 1988 ML20247Q7691989-08-0303 August 1989 Forwards Rev 12 to QA Program Topical Rept B13323, Comments on Draft Reg Guide, Assuring Availability of Funds for Decommissioning Nuclear Reactors. Changes to Stated Phrases Re Certification Amounts Discussed1989-08-0303 August 1989 Comments on Draft Reg Guide, Assuring Availability of Funds for Decommissioning Nuclear Reactors. Changes to Stated Phrases Re Certification Amounts Discussed A08153, Advises That Payment for Invoices H1386,H1387,H1410 & H1411 Will Be wire-transferred on 890810,per NRC Instructions1989-08-0101 August 1989 Advises That Payment for Invoices H1386,H1387,H1410 & H1411 Will Be wire-transferred on 890810,per NRC Instructions B13321, Informs of Inability to Submit plant-specific Analyses for Util as Planned,Due to Delays Encountered in Completing Sensitivity & Break Spectrum Analysis.Meeting Between NRC & Util Representatives Arranged for 8908101989-08-0101 August 1989 Informs of Inability to Submit plant-specific Analyses for Util as Planned,Due to Delays Encountered in Completing Sensitivity & Break Spectrum Analysis.Meeting Between NRC & Util Representatives Arranged for 890810 A07974, Advises That No Agreements Restricting Employees to Inform NRC of Potential Safety Issues Exist,Per V Stello1989-07-31031 July 1989 Advises That No Agreements Restricting Employees to Inform NRC of Potential Safety Issues Exist,Per V Stello ML20248B7931989-07-31031 July 1989 Forwards Response to NRC Request for Addl Info Re Util 890421 Application for Amend to License DPR-61,revising Tech Spec 3.6, Eccs. Revised Tech Spec Also Encl B13307, Responds to Generic Ltr 89-06, Task Action Plan Item I.D.2 - SPDS - 10CFR50.54(f). SPDS for Plants Meet Applicable Requirements of Suppl 1 to NUREG-0737 & Consistent W/ Majority of Positions Provided in NUREG-13421989-07-21021 July 1989 Responds to Generic Ltr 89-06, Task Action Plan Item I.D.2 - SPDS - 10CFR50.54(f). SPDS for Plants Meet Applicable Requirements of Suppl 1 to NUREG-0737 & Consistent W/ Majority of Positions Provided in NUREG-1342 A08037, Responds to Generic Ltr 89-08, Erosion/Corrosion-Induced Pipe Wall Thinning. Plants Have Programs & Procedures in Place to Monitor Erosion/Corrosion for Both single-phase & two-phase Flow Sys1989-07-13013 July 1989 Responds to Generic Ltr 89-08, Erosion/Corrosion-Induced Pipe Wall Thinning. Plants Have Programs & Procedures in Place to Monitor Erosion/Corrosion for Both single-phase & two-phase Flow Sys A08007, Requests Extension of Deadline for Response to Generic Ltr 89-06, Task Action Plan Item I.D.2-SPDS-10CFR50.54(f), to No Later than 890721.Addl Time Needed to Allow for Completion of Thorough Internal Review of Response1989-07-12012 July 1989 Requests Extension of Deadline for Response to Generic Ltr 89-06, Task Action Plan Item I.D.2-SPDS-10CFR50.54(f), to No Later than 890721.Addl Time Needed to Allow for Completion of Thorough Internal Review of Response B13282, Forwards Response to 890501 Request for Addl Info Re Util Const of New Switchgear Bldg at Plant1989-07-10010 July 1989 Forwards Response to 890501 Request for Addl Info Re Util Const of New Switchgear Bldg at Plant A08093, Advises That Fourth Quarterly Installment of 1989 Annual Fees Will Be Wire Transferred on 890731 in Payment of Invoices H1146,H1222,H1190 & H1151,per 10CFR1711989-07-0707 July 1989 Advises That Fourth Quarterly Installment of 1989 Annual Fees Will Be Wire Transferred on 890731 in Payment of Invoices H1146,H1222,H1190 & H1151,per 10CFR171 A08111, Advises That Payment for 10CFR170 Fee Sent to Jm Rodriquez Re NRC Review of Rev 11 to QA Topical Rept1989-07-0707 July 1989 Advises That Payment for 10CFR170 Fee Sent to Jm Rodriquez Re NRC Review of Rev 11 to QA Topical Rept A07951, Responds to Suppl 3 to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Issue Represents No Problem at Any Millstone Unit.Haddam Neck Valves Will Be Inspected for Leakage During Upcoming Refueling Outage1989-06-30030 June 1989 Responds to Suppl 3 to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Issue Represents No Problem at Any Millstone Unit.Haddam Neck Valves Will Be Inspected for Leakage During Upcoming Refueling Outage B13268, Submits Addl Info Re 890425 Proposed Rev to Tech Specs Administrative Controls Section Concerning High Radiation Areas,Per NRC 890505 Conference Call1989-06-26026 June 1989 Submits Addl Info Re 890425 Proposed Rev to Tech Specs Administrative Controls Section Concerning High Radiation Areas,Per NRC 890505 Conference Call B13215, Advises That One Technically Qualified & Trained Individual Per Site Will Man Health Physics Network & Emergency Notification Sys Telephone Lines at Plants,Per NRC Ltrs1989-06-23023 June 1989 Advises That One Technically Qualified & Trained Individual Per Site Will Man Health Physics Network & Emergency Notification Sys Telephone Lines at Plants,Per NRC Ltrs 1990-08-30
[Table view] |
Text
1 .
CONNECTICUT YANKEE ATO MIC POWER COMPANY B E R L I N. CONNECTICUT P.O. box 270 e HART FORD. CONNECTICUT 06141 4 270 TELEPHONE 203-665-$000 July 17,1987 Docket No. 50-213 B12592 Re: SALP U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:
Haddam Neck Plant Systematic Assessment of Licensee Performance The Staff recently forwarded the SALP Board Report (l) for the 13-month period ending March 31,1987 for the Haddam Neck Plant. Subsequent to receipt of the SALP Board Report, a meeting was held on June 18, 1987 between members of the Staff and members of Connecticut Yankee Atomic Power Company (C Y APCO).
The purpose of this letter is to respond to and comment on the findings of the SALP Board with particular emphasis on the Board recommendations for the individual evaluation categories. Attachment A to this letter contains the CYAPCO response to each of the Board's recommendations for the Haddam Neck Plant.
In reviewing the SALP report, CYAPCO finds it disappointing that the NRC considers that overall facility performance has declined since the last SALP evrluation period. We believe that significant initiatives have taken place to further improve plant performance. CYAPCO finds much in the text of the report to support this conclusion. However, if CYAPCO is not headed in the right direction in the judgement of the NRC Staff, this must be identified so that
- a mutual understanding and appropriate corrective actions can be taken promptly.
(1) W. T. Russell letter to E. 3. Mroczka, "SALP Report No. 50-213/86-99,"
dated June 10,1987.
Q7240063 ADDCK 05000g33 070737 Y O y PDR '! \
k
U.S. Nuclear Regulatory Commission B12592/Page 2 July 17,1987 Accordingly, CYAPCO wishes to maintain an open dialog with the NRC concerning its current performance trend. CYAPCO's goal is to return to Category 1 performance in all functional areas. CYAPCO believes that this goal is attainable.
Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY 4H 4c)
E. F.ka (/
Senio 'ce President cc: W. T. Russell, Region 1 Administrator F. M. Akstulewicz, NRC Project Manager, Haddam Neck Plant
- 3. T. Shediosky, Senior Resideat Inspector, Haddam Neck Plant i
l 1
M
Docket No. 50-213 B12392 i
)
l Attachment A ,
Connecticut Yankee . Atomic Power Company l Haddam Neck Plant Response to SALP Report
~I i
I i
l l
)
i l
July,1987 )
-_ _ _ _ _ _ - - - - - - w
Functional Area: PLANT OPERATIONS Board Recommendation: Correct the causes of operator contribution to unnecessary trips.
1
Response
l Two causes were identified f ar operator contribution to unnecessary trips. One l was operator error during startup, and the other was inadequate coordination 1 between the operators and technicians performing the work.
The circumstances surrounding the operator error during startup indicated that I
this was an isolated occurrence. A turbine test engineer, concerned over getting the turbine through its critical speed, rushed the operator during turbine startup. I l Steam demand increased too quickly, causing a plant trip. While the test engineer's concern over excessive turbine vibration is appropriate, the overzealous manner in which he expressed this concern was not. The Operations ;
Supervisor reviewed this event with all Operations Department personnel, '
stressing the responsibility of the operators to operate plant equipment properly regardless of the circumstances.
The two trips that were due to inadequate coordination between the operators and working technicians indicated that there was a need to formalize the interface between these groups. Accordingly, a new station procedure was developed to provide a formal review of work conducted on the back shif ts. Key to this review is a checklist which is completed by the technician and the Shif t Supervisor prior to initiation of work. This checklist is intended to help the Shif t Supervisor and technician identify potential problems with the proposed work before it is actually performed, thus minimizing the chances for an unnecessary trip.
l In order to continue to improve the operator training program, a Licensed Operator Continuing Training Program Implementing Procedure (TPIP) was issued in September,1986. This procedure, in concert with the Nuclear Training Manual, provided detailed programmatic and administrative requirements related to training content, examinations, removal from shift for unsatisfactory performance, scheduling, departmental duties, instructors qualifications, training effectiveness, and records. Copies of this procedure were informally provided to both the Haddam Neck Plant Resident Inspector and Region I PWR-Westinghouse )
Lead Operatorwas the procedure Licensing Examiner transmitted to the in the for NRC October,1986 time {Ir me. In addition, formal review. j Additionally, A ;
NUSCO QA Surveillance was performed in December,1986 indicating that the administrative controls were in place at that time. Such measures should help to decrease the number of operator errors that occur.
1 1
l i
1 0
I l
(1) E. 3. Mroczka letter to C. I. Grimes, " Revised Licensed Operator Requalification Training Program Procedures and Program Descriptions,"
dated December 8,1986. )
1 1
1
-_-_ __-_____ - - - -~-
Functional Area: RADIOLOGICAL CONTROLS Board Recommendation: Assure effective site and corporate coordination and pre-planning of radiological controls activities.
Response
Northeast Utilities, as has been previously stated, is actively pursuing improvement of the corporate / site interface. This effort includes the Radiological Controls Area, and has already resulted in a joint committee being formed to review and upgrade the station Health Physics procedures.
Improved cooperation has also been evident in the'ALARA planning for the 1987 Refueling Outage. A joint NUSCO/CYAPCO committee has reviewed virtually all of the scheduled major construction projects for ways to reduce radiation exposure. This planning has yielded significant reductions in the exposure estimates and hence lowered the radiation exposure goal for the outage.
Initiatives to improve the site / corporate interface will cor.tinue, including an increase in the effectiveness of the corporate audit / appraisal process.
l 1
Functional Area: MAINTENANCE AND MODIFICATIONS Board Recommendation: Consider measures to improve equipment and maintenance personnel performance in order to prevent unnecessary trips.
Response: i j
A new station procedure to improve coordination for work on back shifts that could result in a plant trip has previously been described in the response under Plant Operations. In addition to this, any new measures that can reduce plant trips will be given priority consideration. The obvious benefits of reducing the number of unnecessary trips makes this policy a prudent one.
The final paragraph of this Functional Area cited personnel errors, instances of ineffective maintenance, procedural and documentation inadequacies, and the maintenance backlog as factors which prevented the attainment of overall i maintenance excellence. With the exception of the backlog, CYAPCO feels that i these problem:; are all related to deficiencies in procedural quality and adherence. This has been a common theme of recent plant evaluations both internal and external. CYAPCO is addressing this problem on several fronts, including procedure upgrades, improved training, increased supervisory involvement, and increased station management emphasis on procedural compliance. Efforts are currently underway in each of these areas. In addition, CYAPCO has become involved in human performance evaluation systems and root cause analysis techniques to better evaluate plant occurrences. CYAPCO expects these efforts to yield tangible results during the present SALP period.
With regard to the maintenance backlog, it is CYAPCO's policy to diligently pursue reduction of the backlog on an ongoing basis. As stated in the SALP Report, the backlog has been reduced 17% during the recently completed SALP evaluation period. This is an indication that the policy is effective. 1
Functional Area: SURVEILLANCE Board Recommendation: Assure that acceptable containment leakage is maintained throughout operating cycles.
Response
As noted in the SALP text, containment leakage in excess of allowables is currently being addressed. Additional containment isolation valves are being added to those penetrations which historically have experienced excessive leakage. New hardware which will allow the use of improved test methods is also being installed on some penetrations. In addition, new isolation valves are being installed in the service water system which will prevent river water contamination of the componetit cooling water system during surveillance testing. Contamination of the component cooling water system has been identified as a cause of many leaky isolation valves. Finally, a full pressure Integrated Leak Rate Test will be performed at 40 psig during the 1987 refueling outage. CYAPCO is committed to assuring containment integrity, and believes that its actions demonstrate this commitment.
I L-_.__------_--_-----______ - . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - - _ _ _ _ - - .---- _. - - _ _ -------_a
Functional Area: EMERGENCY PREPAREDNESS Board Recommendation: None.
Response
CYAPCO does not agree with the SALP evaluation in this functional area. While the details given in the text are accurate, we conclude that they do not support the Category 2 rating.
The exercise deficiencies noted, while accurate, are in our estimation of very low significance. They are the types of human errors that one would expect from individuals involved in a task which they perform infrequently. As noted in the SALP report, there were several strengths exhibited _by these same individuals.
The NRC concern over a lack of procedural definition of the DSEO/NRC DSO interface is being addressed as noted in the SALP report. This concern is, however, an artificiality in our opinion since the DSEO and NRC DSO would be located in very close physical proximity during an actual event (in adjacent rooms in the EOF). Certainly,- the NRC DSO would be kept abreast of the situation along with the rest of the Emergency Operation Center staff.
The NRC concern over augmentation was shared by current plant management; hence the unannounced drill on March 24,1987. The unacceptable results of this licensee initiated test were, as noted in the text, dealt with immediately and decisively by plant management.
Given the significant, licensee initiated improvements in the Emergency Preparedness area, coupled with two well executed exercises in 1986 and 1987, CYAPCO's reaction to the present evaluation is one of disappointment.
CYAPCO will continue to investigate future improvements to further' upgrade the program.
I i
i l
Functional Area: SECURITY AND SAFEGUARDS Board Recommendation: None.
Response
None.
i 1
I
)
i
l Functional Area: REFUELING AND OUTAGE MANAGEMENT l
I Board Recommendation: None. )
i
Response
CYAPCO agrees that the initiatives taken to date, while significant, must be proven through use during the 1987 Refueling Outage. Performance during this outage will demonstrate tnat the changes have been effective.
l 4
l l
Functional Area: ASSURANCE OF QUALITY Board Recommendation: None.
Response
CYAPCO management intends to continue and expand the positive Initiatives cited in the SALP text. ' Procedures and personnel adherence to these procedures are being closely scrutinized. CYAPCO beliesos- that its overall trend is positive and plans to build on this foundation.
4 i
l
4 Functional Area: TRAINING AND QUALIFICATION EFFECTIVENESS l
Board Recommendation: None.
Response
Our response concerning the Plant Operations. functional area addresses the implementation of operator requalification program administrative controls.
i l
)
i I
J i
'l I
l l
l l
l
i l
l Functional Area: LICENSING ACTIVITIES Board Recommendation: Develop overall approach for planning submittals to ;
assure they are fully supported and submitted in a i timely fashion.
l Response:
We believe that communications are being improved between the NRC and i l
CYAPCO on outstanding information requests and othet _ licensing actions, ;
thereby allowing timely decisions to be made to resolve outstanding issues. One l recent example of this effort is the establishment of periodic meetings with the NRC Project Manager to prioritize and schedule current licensing issues in a manner that is supportive of both the NRC Staff's schedule and our available resources. This overall approach for planning submittals on current licensing issues provides greater assurance that information requests are fully supportive and submitted in a timely fashion. Long-standing NRC concerns with respect to t Technical Specification upgrades for NUREG-0737 issues and degraded grid voltage have recently been placed in the high-priority category.
We have continually strived to provide comprehensive, thorough, and technically sound submittals. In cases where the NRC Staff has required additional information, we have been quick to respond to' the request with follow-up ;
conference calls, meetings, or additional written submittals. !
l l As discussed briefly during the June 18, 1987, SALP meeting, we note that l l voluntary initiatives such as the Probabilistic Safety Study and ISAP analyses l
may identify areas of plant vulnerability which were not previously analyzed.
I Therefore, this may result in the need for prompt expenditures of both CYAPCO and NRC resources, including a temporary waiver or an emergency license amendment. While we certainly wish to keep such evolutions to a minimum, safety considerations occasionally dictate otherwise. We request the NRC to take this into account in evaluating our performance in this functional area.
In summary, we believe that the licensing activities associated with the Haddam Neck Plant demonstrate that an overall approach for planning submittals is in place. CYAPCO management is firmly committed to providing the proper resources and direction necessary to provide assurance that all licensing issues are fully supported and submitted in a timely fashion, and the resultant commitments are fully implemented.
l l
l l-
c4 - R b>
I l
1 l
Functional Area: ENGINEERING SUPPORT l
Board Recommendation: Improve communication and coordination between the j site and corporate staffs.
Response
l During the SALP period, major improvements in communication and coordination '
between the site and corporate staff have occurred in the area of outage i modifications. The ties that have been established during this effort are being ,
extended to other areas, most notably Fire Protection. This evolutionary process !
is highly endorsed by management and will continue. i The text of the SALP also stated that training for site engineering personnel is !
deficient but that a training program was under development. This program is now developed and is awaiting INPO accreditation in the interim, the training is being administered using the new!y developed program. !
l Pre-operational testing has been an area of concern for some time at the Haddam Neck Plant. In response to this, a new procedure is being finalized that will provide specific, detailed guidance in this important area.
I i
i I
i 1
l u______._______ _ _ _ _ _ _ _ _ _ _ - __. _ _ _ _ _ _ _ _ _ - _ - _ - _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . - , . - _-___ - - _ _.__-_a
a i
i i
Functional Area: FIRE PROTECTION Board Recommendation: Take appropriate action to improve management involvement in the fire protection area and enhance the interface between the site and corporate staffs.
Response
CYAPCO is committed to improving the Fire Protection Program. This ,
commitment is evidenced by such significant items as: I 1
i o Construction of a new switchgear room as part of the Appendix R compliance effort; 4
1 o Contracting a consulting firm to perform a licensing commitment review; j i
o Conducting ongoing fire protection system code compliance reviews; Perhaps most significant for the long term improvement in the fire protection )
area is the addition of a full time fire protection engineer to the plant {
engineering staff. This individual was previously located in the corporate Fire i Protection Group, and has already improved markedly the site / corporate {
interface in fire protection. Most importantly, this individual will provide the i continuity that was lacking in the previous approach' to this issue. CYAPCO believes that the actions it is taking will result ultimately in a strong fire protection program.