Monthly Operating Rept for Aug 1986
ML20212C524
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/31/1986
From: Bregni L, Lenart R
DETROIT EDISON CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NP860498, NUDOCS 8612310074
Download: ML20212C524 (4)


Text

.

,- CPERATING DATA REPORT DOCKET NO. 50-341 DATE September 11, 1986 UNIT Fermi 2 COMPLETED BY L. P. Bregni TELEPHONE (313) 586-5313 OPERATING STATUS

1. REPORTING PERIOD August GROSS HRS IN REPORTING PERIOD N/A
2. CURRENTLY AUTH POWER LEVEL (MWt) 165 MAX DEPEND CAP (MWeNet)
  • DESIGN ELECTRICAL RATING (MWe Net) 1150
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net) 57.5
4. REASONS FOR RESTRICTION (IF ANY) Confirmatory Action Letter dated July 16, 1985 restricts power from exceeding 5% until authorized by NRC.

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER HRS REACTOR WAS CRITICAL 533.1 533.1 2445.6
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE O O O
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GEN (MWH) 26,700 26,700 132,561.6
10. GROSS ELECT ENERGY GEN (MWH) 0 0 0
11. NET ELECTRICAL ENERGY GEN (MWH) 0 0 0
12. REACTOR SERVICE FACTOR N/A N/A N/A
13. REACTOR AVAILABILITY FACTOR N/A N/A N/A
14. UNIT SERVICE FACTOR N/A N/A N/A
15. UNIT AVAILABLILITY FACTOR N/A N/A N/A
16. UNIT CAP FACTOR (Using MDC) N/A N/A N/A
17. UNIT CAP FACT (Using Design MWe) N/A N/A N/A
18. UNIT FORCED OUTAGE RATE N/A N/A N/A
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)

- E 20. IF SHUTDOWN AT END OF REPORT PERIOD, EST DATE OF STARTUP N/A 88' 00 do 21. UNITS IN TEST STATUS FORECAST ACHIEVED E5 00 INITIAL CRITICALITY 06/20/85 06/21/85 g INITIAL ELECTRICITY 10/01/86 3E COMMERCIAL OPERATION 05/01/87 maz

  • To be determined

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-341 UNIT FERMI 2 DATE September 11, 1986 COMPLETED BY L. P. Bregni TELEPHONE (313) 586-5313 MONTH August DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 i 16 0 i

l i

IRET SMDCME AIO PGER perv1Gs DOCKET NO. 50-341 UNET NAME Fermi 2 DATE Septenber 11, 1986 COMPLETED BY L. P. Bregni TELEPHONE (313) 586-5313 REPORT lONIE August i I I I I I I I I I I I I I ME'mW T SHUITING l l z

l I I F:FOPCED I I l DOWN THE REMTOR l l l NO. I DATE I S:SGEDULED I DURATION I REASON l OR REDUCING ICDRRBCPIVE ACPIONS/CCEMENTS I I I I I (HOURS) 1 (1) l POWER (2) l l l l l l I I I I I ,

I i 1 1 860801 l S I 90.4 I B l 4 1 Shut down since l I I I I I I I October 11, 1985 I I I I I I I I I .

I I I I I I I 2 I 860807 i F I 93.6 i H I 1 l Managenent decision to l I I I I I I I shut down after a fire i l l I I I I I that occurred in a Motor i I l l l l l , I Control Center LER 86-026 l l l l l l l 1 report dated Septenber 5, I I I I I I I i 1986 I I I  ! I I I I I I I I I I I I 3 1 860829 I F l 26.9 i G l 3 i Reactor trip on high RRV i I i l l i l I pressure transient LER l l l l 1 1 I l 86-031. Report due l I I I I I I I Septenber 28, 1986 I I I I I I I I I (1) REASONS A. EQUIPMENT FAILURE (EXPLAIN) E. OPERA'IOR TRAINING AND LICENSE EXAMINATION B. MAINf OR TEST F. ADMINISTRATIVE C. REFUELING G. OPERATIORL ERROR (ERROR)

D. REGUIA'IORY RESTRICTION H. OTHER (OIEER)

(2) METIHOD

, 1. MANUAL 3. AUITMATIC SCRAM

2. MANUAL SCRAM 4. OMER (EXPIAIN)

aNaa l

Detrol.1-r.,. . September 11 g

lSOn po)gS3;"$Da'*d* NP860498 nuci..,

sse-sm operations U. S. Nuclear Regulatory Commission Attention: Director, Office of Resource Management Washington, D.C. 20555 Gentlemen:

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for August, 1986 l

Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for August, 1986. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact us.

Sincerely, R. S. Lenart Plant Manager Enclosure cc: M.D. Lynch USNRC Document Control Desk W.G. Rogers Washington, D.C. 20555 G.C. Wright l

Regional Administrator Mr. Dennis Hahn USNRC Region III Division of Radiological Health 799 Roosevelt Rd. Michigan Department of Health Glen Ellyn, IL 60137 3500 North Logan P.O. Box 30033 Lansing, MI 48909 Mr. Jon Eckert Monroe City-County Office of Civil Preparedness 965 South Raisinville Road Monroe, MI 48161 y;ggf I