ML20209A771

From kanterella
Revision as of 18:34, 11 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Order Extending Time Until 860912 for Commission to Act to Review ALAB-837.Served on 860905
ML20209A771
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/05/1986
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To:
NRC COMMISSION (OCM)
References
CON-#386-593 ALAB-837, OL, NUDOCS 8609080098
Download: ML20209A771 (1)


Text

hi2 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION 30LFETE:

'liNf'C COMMISSIONERS: g SEP -5 P3 :48 Lando W. Zech, Jr., Chairman Thomas M. Roberts GFFILt 03 n .  ! An v James K. Asselstine 00CKEiiNu s 5f PVICf.

3N#NCH Frederick M. Bernthal Kenneth M. Carr ERVEDSEP -5 N

)

In the Matter of )

)

CAROLINA POWER AND LIGHT COMPANY, ) Docket No. 50-400 OL ET AL.) )

)

(Shearon Harris Nuclear Power )

Plant, Unit 1) )

)

ORDER Pursuant to 10.CFR 2.772, the time for the Commission to determine whether to review ALAB-837 is hereby extended to September.12, 1986.

It is so ORDERED.

q For the Commission rND g

'l oa b b x f

h I SAMUEL J CHILK he Commission

\ %A94 f ecretary of Dated at Washington, D.C. this b

v day of September, 1986.

8609030098 860905 PDR ADOCK 05000400 G PDR

,