Applicant Request for Oral Argument to Invoke Subpart K Hybrid Hearing Procedures & Proposed Schedule.* Applicant Recommends Listed Schedule for Discovery & Subsequent Oral Argument.With Certificate of Svc
ML20210B227
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/21/1999
From: Oneill J
CAROLINA POWER & LIGHT CO., SHAW, PITTMAN, POTTS & TROWBRIDGE
To:
Atomic Safety and Licensing Board Panel
References
CON-#399-20667 99-762-02-LA, LA, NUDOCS 9907230088
Download: ML20210B227 (4)


Text

r i i J i 2 0667 00CKETED USOPC

?) JUL M fuhh,1999 OFF UNITED STATES OF AMERICg NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of )

)

CAROLINA POWER & LIGifT ) Docket No. 50-400-LA COMPANY )

(Shearon liarris Nuclear Power Plant) ) ASLBP No. 99-762-02-LA l

APPLICANT'S REQUEST FOR ORAL ARGUMENT TO INVOKE SUHPART K IIYBRID HEARING PROCEDURES AND PROPOSED SCHEDULE Pursuant to the provisions of 10 C.F.R. 2.1109(a) and the Board's

" Memorandum and Order (Ruling on Standing and Contentions)," LBP-99-25, slip op. at 26-27 (July 12,1999), Applicant Carolina Power & Light Company hereby requests an oral argument and requests that further proceedings in this matter be conducted in accordance with the procedures set forth in Subpart K of 10 C.F.R. Part 2 (10 C.F.R. {Q 2.1101, et seq.).

In order to facilitate issuance of the Board's ruling and scheduling order pursuant j to 10 C.F.R. 2.1109(b), the Applicant proposes the following schedule for discovery and subsequent oral argument with respect to the admitted contentions. The Applicant j l

has discussed this proposed schedule with both the NRC staff counsel and the counsel for l l

the Board of Commissioners of Orange County ("BCOC"). NRC staff counsel concurs  !

1 9907230088 990721 PDR ADOCK 05000409 ty b ,

O PDR g l

m M

s with the proposed schedule. Counsel for BCOC was unable to either agree or disagree with the proposed schedule due to the unavailability this week of one of BCOC's experts.

Based on the scheduling requirements in Subpart K, the Applicant recommends the following schedule for discovery and the subsequent oral argument.

  • Discovery Begins July 29,1999 (one day after projected Order)'
  • Discovery Ends October 27,1999 (90 days after discovery begins) 3

. Written Summaries Filed November 29,1999 (33 days after discovery ends) e Oral Argument December 14,1999 (15 days after summaries filed)4 Respectfully submitted, N

OfCounsel: John H. 0%ill, Jr.V  !

Steven Carr William R. Hollaway l Legal Department SHAWPITTMAN CAROLINA POWER & LIGHT 2300 N Street, N.W.

COMPANY Washington, D.C. 20037-1128 411 Fayetteville Street Mall (202) 663-8000 Post Office Box 1551 - CPB 13A2 Counsel For CAROLINA POWER &

Raleigh, North Carolina 27602-1551 LIGHT COMPANY (919) 546-4161 l

Dated: July 21,1999

]

1 3

in order to present a schedule with actual dates, the Appihant has assumed that the Board I will issue an Order ruling on the request for oral argumeut on or before July 28,1999. i 2

Subpart K anticipates that all discovery will be completed within 90 days. 10 C.F.R. 2.1111 see also LBP-99-25, slip op. at 26.  !

3 A detailed written summary of all the facts, data, and arguments on which the pany proposes to rely at the oral argument.10 C.F.R: @ 2.1113(a). Summaries are to be simultaneously filed by all parties. IA  ;

Oral argument is to be held 15 days aller written sumn,Jes are filed.10 C.F.R. 2.1113(a).

1 o

V.

l DOCKETED User g

'99 JUL 22 P3 52 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION OFi Before the Atomic Safety and Licensing Board In the Matter of )

)

CAROLINA POWER & LIGHT ) Docket No. 50-400-LA COMPANY )

(Shearon 11arris Nuclear Power Plant) ) ASLBP No. 99-762-02-LA CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing " Applicant's Request for Oral Argument to Invoke Subpart K Hybrid IIearing Procedures and Proposed Schedule,"

dated July 21,1999, was served on the persons listed below by U.S. mail, first class, postage prepaid, and by electronic mail transmission, this 21st day of July,1999.

G. Paul Bollwerk, III, Esq., Chairman Frederick J. Shon Administrative Judge Administrative Judge Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Washington, D.C. 20555-0001 e-mail: gpb%nrc. gov e-mail: fjs@nrc. gov Dr. Peter S. Lam Ollice of the Secretary Administrative Judge U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel Washington, D.C. 20555-0001 U.S. Nuclear Regulatory Commission Attention: Rulemakings and Adjudications Washington, D.C. 20555-0001 Staff e-mail: psl@nrc. gov e-mail: hearingdocket@nrc. gov (Original and two cupies) m

F ;.

[C (-

a

')

I J

Susan L. Uttal, Esq.

  • Adjudicatory File l Richard G. Bachmann, Esq. Atomic Safety and Licensing Board Panel Office of the General Counsel U.S. Nuclear Regulatory Commission Mail Stop O-15 BI8 Washington, D.C. 20555-0001 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 i e-mail: harris @nrc. gov Diane Curren, Esq. James M. Cutchin, V, Esq. l Hannon, Curran, Spielberg & Atomic Safety and Licensing Board Panel Eisenberg, L.L.P. U.S. Nuclear Regulatory Commission )

'1726 M Street, N.W., Suite 600 Washington, D.C. 20555-0001 l Washington, D.C. 20036 e-mail: jmc3@nre. gov e-mail: deurran@harmoncurran.com

  • by mail only  !

William R'. HollasV i

l l

J