Order (Schedule for Responses to Motion to Relocate Prehearing Conference).* Responses to Change Location of Initial Prehearing Conference Shall Be Filed on or Before 990316.With Certificate of Svc.Served on 990311
ML20207G259
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/11/1999
From: Bollwerk G
Atomic Safety and Licensing Board Panel
To:
AFFILIATION NOT ASSIGNED
References
CON-#199-20077 99-762-02-LA, 99-762-2-LA, LA, NUDOCS 9903120034
Download: ML20207G259 (4)


Text

30 1 .

UNITED STATES OF AMERICA DOCKETEf.

NUCLEAR REGULATORY COMMISSION ObkEC ATOMIC SAFETY AND LICENSING BOARD g g ))

Before Administrative Judges:

OR ~~

G. Paul Bollwerk, III, Chairman Rui Frederick J. Shon ADJiE g Dr. Peter S. Lam SERVED W 11 1999 In the Matter of Docket No. 50-400-LA CAROLINA POWER & LIGHT COMPANY ASLBP No. 99-762-02-LA (Shearon Harris Nuclear March 11, 1999 Power Plant)

ORDER (Schedule for Responses to Motion to Relocate Prehearing Conference) l Upon consideration of the March 9, 1999 motion of intervenor Board of Commissioners of Orange County, North l

Carolina, (BCOC) requesting a change in the location of the initial prehearing conference for this proceeding, it is i

ORDERED, that responses to that motion shall be filed on or before Tuesday, March 16, 1999.

The filings permitted under this order should be served on the Board, the Office of the Secretary, and counsel for the other participants by facsimile transmission, e-mail, or other means that will ensure receipt by midnight Eastern Time (ET) on ihe day of filing. See Licensing Board 9903120034 990311 gDR ADOCK 05000400 PDR }~ p' b

')>

Memorandum and Order (Initial Prehearing Order) (Feb. 24, 1999) at 9 (unpublished).

FOR THE ATOMIC SAFETY AND LICENSING BOARD *

. JL l s t. c ' ( '

G. Paul Bollwerk, III ADMINISTRATIVE JUDGE Rockville, Maryland March 11, 1999 1

I l

i

  • Copies of this order were sent this date to counsel for applicant Carolina Power & Light Company and petitioner BCOC by Internet e-mail transmission and to' counsel for the NRC staff by e-mail transmission through the agency's wide area network system.

L

m )

l UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of CAROLINA POWER & LIGHT COMPANY Docket No.(s) 50-400-LA (Shearon Harris Nuclear Power Plant)

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing LB ORDER (SCHEDULE FOR ...)

have been served upon the' following persons by U.S. mail, first class, except

- as otherwise noted and in accordance with the requirements of 10 CFR Sec. 2.7I2.

Administrative Judge Office of Commission Appellate G. Paul Bo11werk, III, Chairman Adjudication Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop - T-3 F23 Washington, DC 20555 U.S. Nuclear Regulatory Commission Washington, DC 20555 Administrative Judge Administrative Judge Frederick J. Shon Peter S. Las Atomic' Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Nail Stop -~T-3 F23 Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC .20555 Washington, DC 20555 Marian L. Zobler, Esq.

Curran, Esq.

Richard G. Bachmann, Esq. Diane Office of the General Counsel Harmon, Curran, Spielberg & Eisenberg Mail Stop 15 B18 2001 S Street, N.W., Suite 430 U.S. Nuclear Regulatory Commission Washington, DC 20009 Washington, DC 20555 i i

William D. Johnson John H. O'Neill, Jr., Esq. I Vice President and Senior Counsel William R. Ho11away, Esq. I Carolina Power & Light Company Shaw, Pittman, Potts & Trowbridge 1 P. O. Box 1551 2300 N Street, NW j Raleigh, NC 27602 Washington, DC 20037 4

W,. , - _ . . , , . . ._. , , , , . - - . .

N Docket No.(s)50-400-LA LB ORDER (SCHEDULE FOR ...)

Dated at Rockville, Md. this '

11 day of March 1999 Of~fite of the Secretary of the Consissf6n j i'