Category:CORRESPONDENCE-LETTERS
MONTHYEARLIC-99-0098, Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached1999-10-15015 October 1999 Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached ML20217G9261999-10-15015 October 1999 Forwards Insp Rept 50-285/99-10 on 990913-17.One NCV Noted ML20217G2331999-10-14014 October 1999 Forwards Insp Rept 50-285/99-09 on 990913-17.No Violations Noted LIC-99-0091, Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util1999-10-0808 October 1999 Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util LIC-99-0097, Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls1999-10-0707 October 1999 Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls ML20217B5111999-10-0606 October 1999 Forwards Amend 193 to License DPR-40 & Safety Evaluation. Amend Revises TS Sections 2.10.4,3.1 & Table 3-3 to Increase Min Required RCS Flow Rate & Change Surveillance require- Ments for RCS Flow Rate ML20216H7231999-09-29029 September 1999 Informs That Util 980325 Response to GL 97-06, Degradation of SG Internals, Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Fort Calhoun Station,Unit 1 ML20212L9571999-09-27027 September 1999 Informs That Follow Up Insp for Drill/Exercise Performance Indicator Will Be Conducted During Wk of 991001 LIC-99-0089, Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl1999-09-24024 September 1999 Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl LIC-99-0092, Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl1999-09-21021 September 1999 Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl LIC-99-0087, Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-17017 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams LIC-99-0088, Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls1999-09-16016 September 1999 Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls LIC-99-0080, Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection1999-09-16016 September 1999 Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection LIC-99-0085, Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters1999-09-0808 September 1999 Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters IR 05000285/19990081999-09-0707 September 1999 Forwards Insp Rept 50-285/99-08 on 990907-0811.No Violations Noted.Insp Consisted of Exam of Activities Conducted Under License as Relate to Safety & to Compliance with Commission Rules & Regulations & with Conditions of License ML20211P2581999-09-0303 September 1999 Forwards Insp Rept 50-285/99-06 on 990809-12.No Violations Noted.Insp Consisted of Exam of Activities Under License as Related to EP & to Compliance with Commission Rules & Regulations & with Conditions of License LIC-99-0083, Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase1999-09-0202 September 1999 Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase ML20211J9231999-09-0202 September 1999 Forwards SE Accepting Licensee 990301 Requests for Relief Re Third 10-year ISI Interval for Plant,Unit 1.Relief Proposed Alternatives to Requirements in ASME B&PV Section XI,1989 Edition,Paragraphs IWA-5242(a) & IWA-5250(a)(2) ML20211L3241999-09-0202 September 1999 Informs That Due to Administrative Error,Page 2-50 of TSs Contained Error on 2.10.2(2) of Amend 192 to License DPR-40 Issued on 990727.Corrected Page Encl LIC-99-0077, Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld1999-08-27027 August 1999 Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld ML20211F4491999-08-25025 August 1999 Forwards Ltr from Ja Miller,Dtd 990819,which Notified State of Iowa of Deficiency Identified During 990810,Fort Calhoun Station Biennial Exercise.One Deficiency Identified for Not Adequately Demonstrating Organizational Capability LIC-99-0076, Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d)1999-08-20020 August 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d) LIC-99-0078, Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld1999-08-20020 August 1999 Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld ML20210R1491999-08-13013 August 1999 Forwards Insp Rept 50-285/99-07 on 990719-23.No Violations Noted.Nrc Identified One Issue Which Was Evaluated Under Risk Significance Determination Process & Was Determined to Be of Low Risk Significance LIC-99-0075, Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210N1991999-08-0909 August 1999 Informs That as Result of NRC Review of Licensee Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210P8991999-08-0909 August 1999 Forwards FEMA Final Rept for 990630 Offsite Medical Drill. No Deficiencies or Areas Requiring Corrective Action Identified During Drill LIC-99-0072, Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable1999-08-0606 August 1999 Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams LIC-99-0068, Documents OPPD Response to Requested Actions in GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-08-0202 August 1999 Documents OPPD Response to Requested Actions in GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal LIC-99-0040, Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR Other than Those Resulting from 10CFR50.59.Encl Info Covers Period of 981101-9903311999-07-28028 July 1999 Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR Other than Those Resulting from 10CFR50.59.Encl Info Covers Period of 981101-990331 LIC-99-0070, Requests Reinstatement of SRO License Previously Held by K Grant-Leanna (License SOP-43569).Operator Is Current on All requalification-training Topics & Has Completed License Reactivation Program1999-07-28028 July 1999 Requests Reinstatement of SRO License Previously Held by K Grant-Leanna (License SOP-43569).Operator Is Current on All requalification-training Topics & Has Completed License Reactivation Program ML20210G1851999-07-27027 July 1999 Forwards Amend 192 to License DPR-40 & Safety Evaluation. Amend Consists of Changes to TS in Response to 990129 Application LIC-99-0057, Forwards 1999/2000 Statement of Cash Flow from Operations, as Guarantee of Payment of Deferred Premiums for Period of 990630 to 0006301999-07-26026 July 1999 Forwards 1999/2000 Statement of Cash Flow from Operations, as Guarantee of Payment of Deferred Premiums for Period of 990630 to 000630 ML20216D6951999-07-26026 July 1999 Informs That During 990614 Review of Fort Calhoun,Nrc Noted That Drill/Exercise Performance Indicator Has Entered White Band,Which Indicated Level of Licensee Performance That Warranted Increased Regulatory Response LIC-99-0071, Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-26026 July 1999 Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates LIC-99-0069, Forwards non-proprietary & Proprietary Epips,Including FC- Epf Index Page & Page 2 ,rev 0 to FC- EPF-42,EPIP Index (Page 1 of 2) & EPIP-OSC-2, Cover & Pages 19 & 20.Proprietary Encls Withheld1999-07-23023 July 1999 Forwards non-proprietary & Proprietary Epips,Including FC- Epf Index Page & Page 2 ,rev 0 to FC- EPF-42,EPIP Index (Page 1 of 2) & EPIP-OSC-2, Cover & Pages 19 & 20.Proprietary Encls Withheld ML20210D9471999-07-22022 July 1999 Forwards Amend 191 to DPR-40 & Safety Evaluation.Amend Authorizes Rev to Licensing Basis as Described in Updated Safety Analysis Rept to Incorporate Mod for Overriding Containment Isolation ML20210C2041999-07-20020 July 1999 Discusses 990715 Mgt Meeting with Midamerican Energy Co Re risk-informed Baseline Insp Program Recently Implemented at Cooper & Fort Calhoun Stations ML20210C0201999-07-20020 July 1999 Informs That Due to Administrative Oversight,Revised TS Bases Provided in to Fort Calhoun Station Were Not Dated.Dated Pages to TS Encl ML20210B0761999-07-19019 July 1999 Forwards Insp Rept 50-285/99-05 on 990601-0710.No Violations Noted ML20209G5351999-07-15015 July 1999 Informs That Staff Incorporated Rev of TS Bases Provided by Licensee Ltr Dtd 980904,into Fort Calhoun Station Tss. Staff Finds Revs to Associated TS Bases to Be Acceptable. Revised Bases Pages Encl ML20209F5741999-07-12012 July 1999 Ack Receipt of Transmitting Exercise Scenario for Upcoming Biennial Offsite Exercise Scheduled 990810.Scenario Reviewed & Acceptable ML20209G5591999-07-0808 July 1999 Forwards Detailed Listing of Staff Concerns with C-E TR NPSD-683,rev 3 & RCS pressure-temperature Limits Rept LIC-99-0066, Forwards Fort Calhoun Performance Indicators Rept for May 19991999-07-0707 July 1999 Forwards Fort Calhoun Performance Indicators Rept for May 1999 LIC-99-0060, Forwards Proprietary & non-proprietary Revs to Fort Calhoun Station Emergency Plan Forms (Epf),Including FC-EPF,FC-EPF-1 & FC-EPF-17.Proprietary Info Withheld1999-07-0101 July 1999 Forwards Proprietary & non-proprietary Revs to Fort Calhoun Station Emergency Plan Forms (Epf),Including FC-EPF,FC-EPF-1 & FC-EPF-17.Proprietary Info Withheld ML20209D8771999-07-0101 July 1999 Summarizes 990630 Public Meeting Conducted in Fort Calhoun, Ne Re Results of Completed Culture Survey,Plant Status, Facility Activities Re New NRC Oversight Process & License Renewal.Licensee Handout & Attendance List Encl LIC-99-0063, Requests Termination of License Held by MR Anderson (License SOP 43812) for Fort Calhoun Station.Anderson Ended Employment Effective 9906241999-07-0101 July 1999 Requests Termination of License Held by MR Anderson (License SOP 43812) for Fort Calhoun Station.Anderson Ended Employment Effective 990624 1999-09-08
[Table view] Category:ENGINEERING/CONSTRUCTION/CONSULTING FIRM TO NRC
MONTHYEARML20246M7331989-03-15015 March 1989 Responds to NRC Info Notice 88-082, Torus Shells W/ Corrosion & Degraded Coatings in BWR Containments. Summary of Relevant Projects for Various Utils Successfully Employing Underwater Alternative to Draining Vessel Encl ML20214Q8311987-04-29029 April 1987 Forwards EGG-NTA-7425, Conformance to Generic Ltr 83-28, Item 2.2.1--Equipment Classification for All Other Safety Related Components:Fort Calhoun-1, Final Rept.Rept Concludes That Facility Conforms to Generic Ltr 83-28 ML20214R9221987-03-23023 March 1987 Forwards EGG-NTA-7634, Technical Evaluation Rept,Tmi Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,Fort Calhoun, Informal Rept ML20209E0221986-12-0101 December 1986 Forwards EGG-NTA-7157, Conformance to Reg Guide 1.97,Fort Calhoun Station, Informal Rept ML20214N0301986-06-30030 June 1986 FOIA Request for Secys 85-306A & B (Including All Other revs),85-279,85-298 & 86-97,NUREG-0313,Rev 2 & Outage Insp Rept 50-285/85-22 ML20135G6881985-08-0606 August 1985 FOIA Request for Reactor Operator/Senior Reactor Operator Exam Questions & Answer Key for Listed Facility Exam Repts Administered in 1984 ML20042A2281982-03-0404 March 1982 Forwards Technical Evaluation Rept for Containment Purging & Venting During Normal Operation of Fort Calhoun Station. Purge/Vent Sys Design Acceptable Subj to Implementation of Listed Recommendations ML19269E0061979-05-11011 May 1979 Forwards Rept on Potentially Hazardous Condition Discovered During Performance Check of Analysis Performed on Safeguards Piping Sys 1989-03-15
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARLIC-99-0098, Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached1999-10-15015 October 1999 Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached LIC-99-0091, Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util1999-10-0808 October 1999 Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util LIC-99-0097, Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls1999-10-0707 October 1999 Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls LIC-99-0089, Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl1999-09-24024 September 1999 Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl LIC-99-0092, Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl1999-09-21021 September 1999 Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl LIC-99-0087, Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-17017 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams LIC-99-0088, Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls1999-09-16016 September 1999 Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls LIC-99-0080, Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection1999-09-16016 September 1999 Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection LIC-99-0085, Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters1999-09-0808 September 1999 Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters LIC-99-0083, Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase1999-09-0202 September 1999 Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase LIC-99-0077, Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld1999-08-27027 August 1999 Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld LIC-99-0078, Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld1999-08-20020 August 1999 Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld LIC-99-0076, Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d)1999-08-20020 August 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d) LIC-99-0075, Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required LIC-99-0072, Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable1999-08-0606 August 1999 Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable LIC-99-0068, Documents OPPD Response to Requested Actions in GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-08-0202 August 1999 Documents OPPD Response to Requested Actions in GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal LIC-99-0040, Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR Other than Those Resulting from 10CFR50.59.Encl Info Covers Period of 981101-9903311999-07-28028 July 1999 Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR Other than Those Resulting from 10CFR50.59.Encl Info Covers Period of 981101-990331 LIC-99-0070, Requests Reinstatement of SRO License Previously Held by K Grant-Leanna (License SOP-43569).Operator Is Current on All requalification-training Topics & Has Completed License Reactivation Program1999-07-28028 July 1999 Requests Reinstatement of SRO License Previously Held by K Grant-Leanna (License SOP-43569).Operator Is Current on All requalification-training Topics & Has Completed License Reactivation Program LIC-99-0071, Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-26026 July 1999 Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates LIC-99-0057, Forwards 1999/2000 Statement of Cash Flow from Operations, as Guarantee of Payment of Deferred Premiums for Period of 990630 to 0006301999-07-26026 July 1999 Forwards 1999/2000 Statement of Cash Flow from Operations, as Guarantee of Payment of Deferred Premiums for Period of 990630 to 000630 LIC-99-0069, Forwards non-proprietary & Proprietary Epips,Including FC- Epf Index Page & Page 2 ,rev 0 to FC- EPF-42,EPIP Index (Page 1 of 2) & EPIP-OSC-2, Cover & Pages 19 & 20.Proprietary Encls Withheld1999-07-23023 July 1999 Forwards non-proprietary & Proprietary Epips,Including FC- Epf Index Page & Page 2 ,rev 0 to FC- EPF-42,EPIP Index (Page 1 of 2) & EPIP-OSC-2, Cover & Pages 19 & 20.Proprietary Encls Withheld LIC-99-0066, Forwards Fort Calhoun Performance Indicators Rept for May 19991999-07-0707 July 1999 Forwards Fort Calhoun Performance Indicators Rept for May 1999 LIC-99-0060, Forwards Proprietary & non-proprietary Revs to Fort Calhoun Station Emergency Plan Forms (Epf),Including FC-EPF,FC-EPF-1 & FC-EPF-17.Proprietary Info Withheld1999-07-0101 July 1999 Forwards Proprietary & non-proprietary Revs to Fort Calhoun Station Emergency Plan Forms (Epf),Including FC-EPF,FC-EPF-1 & FC-EPF-17.Proprietary Info Withheld LIC-99-0063, Requests Termination of License Held by MR Anderson (License SOP 43812) for Fort Calhoun Station.Anderson Ended Employment Effective 9906241999-07-0101 July 1999 Requests Termination of License Held by MR Anderson (License SOP 43812) for Fort Calhoun Station.Anderson Ended Employment Effective 990624 LIC-99-0061, Submits Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl1999-06-30030 June 1999 Submits Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl LIC-99-0056, Forwards Rev 2 to EA-FC-90-082, Potential Over- Pressurization of Containment Penetration Piping Following Main Steam Line Break in Containment, to Facilitate Review of Response to GL 96-061999-06-22022 June 1999 Forwards Rev 2 to EA-FC-90-082, Potential Over- Pressurization of Containment Penetration Piping Following Main Steam Line Break in Containment, to Facilitate Review of Response to GL 96-06 LIC-99-0059, Provides Formal Notification to NRC of Plans Re Renewal of Operating License DPR-40 for Unit 1.Util Will Continue to Inform NRC of Decisions Relative to License Renewal in Order to Facilitate NRC Resource Planning1999-06-22022 June 1999 Provides Formal Notification to NRC of Plans Re Renewal of Operating License DPR-40 for Unit 1.Util Will Continue to Inform NRC of Decisions Relative to License Renewal in Order to Facilitate NRC Resource Planning LIC-99-0054, Forwards Manual Containing Description of Fort Calhoun Station 1999 Emergency Preparedness Exercise, to Be Conducted on 9908101999-06-0808 June 1999 Forwards Manual Containing Description of Fort Calhoun Station 1999 Emergency Preparedness Exercise, to Be Conducted on 990810 LIC-99-0052, Forwards Fort Calhoun Station Performance Indicators, for Apr 19991999-06-0202 June 1999 Forwards Fort Calhoun Station Performance Indicators, for Apr 1999 LIC-99-0045, Forwards Application for Amend to License DPR-40,proposing to Relocate pressure-temp Curves,Predicated NDTT Shift Curve & LTOP Limits & Values from FCS TS to OPPD Controlled Document.Rev 3 to TR CE NPSD-683 & Supporting TSs Encl1999-05-26026 May 1999 Forwards Application for Amend to License DPR-40,proposing to Relocate pressure-temp Curves,Predicated NDTT Shift Curve & LTOP Limits & Values from FCS TS to OPPD Controlled Document.Rev 3 to TR CE NPSD-683 & Supporting TSs Encl LIC-99-0046, Forwards Scope & Objectives for Plant 1999 EP Exercise to Be Conducted 990810.Info Provided Ninety Days Prior to Exercise IAW Established Stds.Complete Scenario Package Will Be Submitted to NRC & FEMA Sixty Days Prior to Exercise1999-05-12012 May 1999 Forwards Scope & Objectives for Plant 1999 EP Exercise to Be Conducted 990810.Info Provided Ninety Days Prior to Exercise IAW Established Stds.Complete Scenario Package Will Be Submitted to NRC & FEMA Sixty Days Prior to Exercise LIC-99-0028, Provides NRC with Status of Corrective Actions Re Plant Fire Protection Program,As Result of NRC Insp Rept 50-285/97-06. Mod to MOV Is in Design Phase & Currently Scheduled for Installation During 1999 Refueling Outage1999-04-30030 April 1999 Provides NRC with Status of Corrective Actions Re Plant Fire Protection Program,As Result of NRC Insp Rept 50-285/97-06. Mod to MOV Is in Design Phase & Currently Scheduled for Installation During 1999 Refueling Outage LIC-99-0036, Submits Annual Rept of 1998 Loca/Eccs Models Per 10CFR50.46. Small & Large Break LOCA PCT Values Continue to Remain Less than 10CFR50.46(b)(1) Acceptance Criterion of 2200 F1999-04-28028 April 1999 Submits Annual Rept of 1998 Loca/Eccs Models Per 10CFR50.46. Small & Large Break LOCA PCT Values Continue to Remain Less than 10CFR50.46(b)(1) Acceptance Criterion of 2200 F LIC-99-0043, Forwards Fort Calhoun Performance Indicators Rept for Mar 19991999-04-28028 April 1999 Forwards Fort Calhoun Performance Indicators Rept for Mar 1999 LIC-99-0041, Informs That Util Has Implemented Necessary Actions Associated with Open TACs M92926,M99885,M98619 & M98933 Issues.Items Considered Ready to Close,Subject to Agreement by Nrc/Nrr Project Manager1999-04-27027 April 1999 Informs That Util Has Implemented Necessary Actions Associated with Open TACs M92926,M99885,M98619 & M98933 Issues.Items Considered Ready to Close,Subject to Agreement by Nrc/Nrr Project Manager LIC-99-0037, Responds to NRC 990126 RAI Re GL 97-01, Degradation of CRDM Nozzle & Other Vessel Closure Head Penetrations. Response Confirms with NRC & NEI Recommendations to Utilize Generic Industry Response to Issue1999-04-26026 April 1999 Responds to NRC 990126 RAI Re GL 97-01, Degradation of CRDM Nozzle & Other Vessel Closure Head Penetrations. Response Confirms with NRC & NEI Recommendations to Utilize Generic Industry Response to Issue LIC-99-0039, Forwards Diskette Containing 1998 Annual Rept of Individual Monitoring for Fcs,Per 10CFR20.2206.Diskette Follows File Structure of Reg Guide 8.7,App a1999-04-20020 April 1999 Forwards Diskette Containing 1998 Annual Rept of Individual Monitoring for Fcs,Per 10CFR20.2206.Diskette Follows File Structure of Reg Guide 8.7,App a LIC-99-0038, Forwards 1998 Radiological Environ Operating Rept & Annual Rept for TS Section 5.9.4.A for 980101-981231, for Fcs,Unit 1.Rept Is Presented in Format Outlined in Reg Guide 1.21,rev 1.Results of Quarterly Dose Calculations,Encl1999-04-20020 April 1999 Forwards 1998 Radiological Environ Operating Rept & Annual Rept for TS Section 5.9.4.A for 980101-981231, for Fcs,Unit 1.Rept Is Presented in Format Outlined in Reg Guide 1.21,rev 1.Results of Quarterly Dose Calculations,Encl LIC-99-0033, Forwards Addl Info to Support NRC Review of Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps1999-04-15015 April 1999 Forwards Addl Info to Support NRC Review of Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps LIC-99-0035, Forwards Proprietary Rev 2b to FCS Emergency Plan Form FC-EPF-17 & non-proprietary Revised FC-EPF Forms Index,Rev 5a to FC-EPF-1 & Rev 4 to FC-EPF-15.Proprietary Info Withheld from Public Disclosure1999-04-0808 April 1999 Forwards Proprietary Rev 2b to FCS Emergency Plan Form FC-EPF-17 & non-proprietary Revised FC-EPF Forms Index,Rev 5a to FC-EPF-1 & Rev 4 to FC-EPF-15.Proprietary Info Withheld from Public Disclosure LIC-99-0031, Forwards Application for Amend to License DPR-40,increasing Min Required RCS Flow Rate & Changing SRs for RCS Flow Rate1999-03-31031 March 1999 Forwards Application for Amend to License DPR-40,increasing Min Required RCS Flow Rate & Changing SRs for RCS Flow Rate LIC-99-0032, Forwards Fort Calhoun Station Performance Indicators, for Feb 19991999-03-31031 March 1999 Forwards Fort Calhoun Station Performance Indicators, for Feb 1999 LIC-99-0029, Forwards Response to 990226 RAI for GL 97-05, SG Tube Insp Techniques1999-03-30030 March 1999 Forwards Response to 990226 RAI for GL 97-05, SG Tube Insp Techniques LIC-99-0027, Forwards Rev 16B to FCS Site Security Plan,Rev 2 to FCS Safeguards Contingency Plan & Rev 6 to FCS Training & Qualification Plan.Encls Withheld1999-03-16016 March 1999 Forwards Rev 16B to FCS Site Security Plan,Rev 2 to FCS Safeguards Contingency Plan & Rev 6 to FCS Training & Qualification Plan.Encls Withheld LIC-99-0022, Agrees with NRC Request That Proposed Wording of USAR Section 9.2.5 Included in Be Revised to Indicate That Use of Letdown Sys Following Transient.Revs of Appropriate Pages to ,Encl1999-03-12012 March 1999 Agrees with NRC Request That Proposed Wording of USAR Section 9.2.5 Included in Be Revised to Indicate That Use of Letdown Sys Following Transient.Revs of Appropriate Pages to ,Encl LIC-99-0024, Informs That OPPD Withdraws Applications Submitted by 950626 &1999-03-12012 March 1999 Informs That OPPD Withdraws Applications Submitted by 950626 & LIC-99-0016, Requests Relief from Certain Requirements of Paragraphs IWA- 5242(a) & IWA-5250(a)(2) of ASME Section Xi,For Remainder of Third 10-year Insp Interval on Basis of Attached Proposed Alternatives1999-03-0101 March 1999 Requests Relief from Certain Requirements of Paragraphs IWA- 5242(a) & IWA-5250(a)(2) of ASME Section Xi,For Remainder of Third 10-year Insp Interval on Basis of Attached Proposed Alternatives LIC-99-0023, Forwards FCS Performance Indicators for Jan 19991999-03-0101 March 1999 Forwards FCS Performance Indicators for Jan 1999 LIC-99-0020, Forwards non-proprietary EPIP Index,Page 1 of 2,rev 31 to EPIP-OSC-1, Emergency Classification, FC-EPF Forms Index, Page 1 of 2, Rev 8 to FC-EPF-14 & Rev 15 to RERP-Appendix a, Rerp. Proprietary Version of Rev 15 to RERP, Included1999-02-24024 February 1999 Forwards non-proprietary EPIP Index,Page 1 of 2,rev 31 to EPIP-OSC-1, Emergency Classification, FC-EPF Forms Index, Page 1 of 2, Rev 8 to FC-EPF-14 & Rev 15 to RERP-Appendix a, Rerp. Proprietary Version of Rev 15 to RERP, Included LIC-99-0011, Forwards 1999 Biennial Decommissioning Funding Status Rept for Fort Calhoun Station,Unit 11999-02-0505 February 1999 Forwards 1999 Biennial Decommissioning Funding Status Rept for Fort Calhoun Station,Unit 1 1999-09-08
[Table view] |
Text
- - , PDr \
/NE Idaho NationalEngle,eerksg Laboratory December 1, 1986
)
i Mr. M. Carrington, Program Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 TRANSMITTAL OF FINAL REPORT, "CONFORMANCE TO REGULATORY GUIDE 1.97, FORT CALHOUN STATION," EGG-NTA-7157, NOVEMBER 1986 - EWR-137-86 Ref: NRC Form 189, " Program for Evaluating Licensee Conformance to R.G. 1.97, Rev. 2, and SPDS Implementation" (FIN A6483),
October 1983
Dear Mr. Carrington:
Transmitted herewith is the above subject report which was completed under FIN A6483. This report documents the EGSG Idaho evaluation of the Fort Calhoun Station's conformance to Regulatory Guide (RG) 1.97,
" Instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess Plants and Environs Conditions During and Following an Accident."
Based on our evaluation it is concluded that, with the exception of the accumulator tank level and pressure variables, the licensee either conforms to or is justified in deviating from the variables in RG 1.97.
The exceptions are reviewed in Section 3.3.8 of the report.
Very truly yours 3 n/3 s E. W. Roberts, Manager NRC Headquarters Support
' 9p
Enclosure:
As Stated )
cc: I Ahmed, NRR-PBPE J. J. Lazevnick, NRR-PAEI G. L. Jones, DOE-ID P. Shemanski, NRR-PBPE J. O. Zane, EG&G Idaho,Inc. (w/o Encl.)
0704290414 861201 POR ADOCK 0S000285 p PDR f f EGzGu . ,,,.. 11428 nackvitte pike suite 41o Rockv111e, so 20est l
EGG-NTA-7157 November 1986 INFORMAL REPORT idaho Nationa/ CONFORMANCE TO REGULATORY GUIDE 1.97, Engineering FORT CALHOUN STATION Laboratury Managed I by the U.S.
Depanment ofEnergy A. C. Udy ;
1 l
l YD # ***
Prepared for the w ea - o, mea unae, U. S. NUCLEAR REGULATORY COMMISSION l DOE Contract No. DE-AC07-76lD01570 i
2704&8-05,W&
s
\ \
DISCLAIMER J This book was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any l
legal liabiity or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product or process disciosed, or reprewnts that its use would not intnnge pnvately owne3 rights. References herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessanly constitute or imply its endorsement, recommendation, or favonng by the United States Government or any agency thereof. The views and opinions of authors excressed herein do not recessanly sta's or reflect these of the United States /
Government or any agency thereof i
e e
's l
,e l
1
.i i
f '/ , , EGG-NTA-7157
/.
i 'h ' l
, k s , jb' ;
,, TECHNICAL EVALUATION REPORT I- J.'
i, a )
CONF 0RFANCE TO REGULATORY GUIDE 1.97 FORT CALHOUN STATION Docket No. 50-285 ,
4
(
A. C. Wy 4
i' Published November 1986 i .
Idaho National Engineering Laboratory .
EG6G Idaho, Inc.
Idaho Falls, Idaho 83415 i
4 l
. Prepared for the !
U.S. ik. clear Regulatory Comission i Washingtori, D.C. 20555 /
Under 001 Contract No. DE-AC07-76ID01570 i FIN No. A6483 4
4 i
i i
f 9
t i
ABSTRACT This EG&G Idaho, Inc., report reviews the submittals for Regulatory Guide 1.97, Revision 2, for the Fort Calhoun Station and identifies areas of nonconformance to the regulatory guide. Exceptions to Regulatory Guide 1.97 are evaluated and those areas where sufficient basis for acceptability is not provided are identified.
4 1
Docket No. 50-285 TAC No. 51091 11 f
l
FOREWORD This report is supplied as part of the " Program for Evaluating Licensee / Applicant Conformance to RG 1.97," being conducted for the U.S.
Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation, Division of PWR Licensing-A, by EG&G Idaho, Inc., NRR and I&E Support Branch.
The U.S. Nuclear Regulatory Commission funded the work under authorization 8&R 20-19-10-11-3.
u Docket No. 50-285 TAC No. 51091 111
1 i
CONTENTS 4
ABSTRACT .............................................................. 11 FOREWORD .............................................................. 111 i !
! 1. INTRODUCTION ..................................................... 1 ,
- 2. REVIEW REQUIREMENTS .............................................. 2 i
- 3. EVALUATION ....................................................... 4 3.1 Adherence to Regulatory Guide 1.97 ......................... 4 3.2 Type A Variables ........................................... 4 3.3 Exceptions to Regulatory Guide 1.97 ........................ 5 l 4. CONCLUSIONS ...................................................... 13 S. REFERENCES ....................................................... 14 l
l i' 1
a I
1 e
A O
f e
tv 4
i
-, ,.r, _ . _ _ . - - - . , _ - _ _ _ . , . . . _ _ , , . . , , , . . . ~ . . , , __ ..r_
-CONFORMANCE TO REGULATORY GUIDE 1.97 FORT CALHOUN STATION
- 1. INTRODUCTION
. On December 17, 1982, Generic Letter No. 82-33 (Reference 1) was 4
issued by D. G. Eisenhut, Director of the Division of Licensing, Nuclear Reactor Regulation, to all licensees of operating reactors, applicants for operating licenses and holders of construction permits. This letter included additional clarification regarding Regulatory Guide 1.97, Revision 2 (Reference 2), relating to the requirements for emergency response capability. These requirements have been published as Supplement No. 1 to NUREG-0737, "TMI Action Plan Requirements" (Reference 3).
l The Omaha Public Power District, licensee for the Fort Calhoun Station, provided a response to Section 6.2 of the generic letter on l April 1, 1985 (Reference 4). Additional information was provided on October 21, 1986 (Reference 5).
This report provides an evaluation of that material.
I I
l l
1
- 2. REVIEW REQUIREMENTS Section 6.2 of NUREG-0737, Supplement No. 1, sets forth the documentation to be submitted in a report to the NRC describing how the licensee complies with Regulatory Guide 1.97 as applied to emergency
~
response facilities. The submittal should include documentation that provides the following information for each variable shown in the applicable table of Regulatory Guide 1.97.
- 1. Instrument range
- 2. Environmental qualification
- 3. Seismic qualification
- 4. Quality assurance
- 5. Redundance and sensor location
- 6. Power supply
- 7. Location of display
- 8. Schedule of installation or upgrade The submittal should identify deviations from the regulatory guide and provide supporting justification or alternatives.
Subsequent to the issuance of the generic letter, the NRC held regional meetings in February and March 1983, to answer licensee and
~
applicant questions and concerns regarding the NRC policy on this subject.
At these meetings, it was noted that the NRC review would only address ,
exceptions taken to Regulatory Guide 1.97. Where licensees or applicants I
explicitly state that instrument systems conform to the regulatory guide, it was noted that no further staff review would be necessary. Therefore, 1
2 l -
this report only addresses exceptions to Regulatory Guide 1.97. The following evaluation is an audit of the licensee's submittals based on the 4
review policy described in the NRC regional meetings.
e a
1 1
l i
l 3 l l
l
. I 1
l i
l l
- 3. EVALUATION The licensee provided a response to Item 6.2 of NRC Generic Letter 82-33 on April 1, 1985. Additional information was provided on October 21, 1986. The responses describe the licensee's position on post-accident monitoring instrumentation. This evaluation is based on that material. ,
3.1 Adherence to Regulatory Guide 1.97 The licensee has provided a review of their post-accident monitoring instrumentation that compares the instrumentation characteristics against the recommendations of Regulatory Guide 1.97, Revision 2. The licensee states that they have determined whether instrumentation complies with the regulatory guide or complies with the regulatory guide with exceptions or with modifications. In those instances where compliance of existing instrumentation was not established the licensee either justified the exception or deviation or committed to upgrade the instrumentation in question. For that instrumentation to be modified, the licensee has scheduled all modifications to be completed during or before the 1987 refueling outage, except for the variable containment sump water temperature, which will be installed during the 1988 refueling outage.
Therefore, we conclude that the licensee has provided an explicit I commitment on conformance to Regulatory Guide 1.97, except for those
! deviations that were justified by the licensee as noted in Section 3.3.
3.2 Type A Variables Regulatory Guide 1.97 does not specifically identify Type A variables, i.e., those variables that provide the information required to permit the control room operator to take specific manually controlled safety actions.
The licensee classifies the following instrumentation as Type A. .
- 1. Neutron flux
- 2. Reactor coolant system (RCS) hot leg water temperature 4
- 3. RCS cold leg water temperature
- 4. Degrees of subcooling
- 5. Core exit temperature
- 6. Coolant level in reactor
- 7. Pressurizer level
- 8. Pressurizer pressure
- 9. Steam generator level
- 10. Steam generator pressure
- 11. Containment hydrogen concentration
- 12. Containment radiation monitor (high range)
These variables meet the Category 1 recommendations consistent with the requirements for Type A variables, except as noted in Section 3.3.
3.3 Exceptions to Regulatory Guide 1.97 The licensee identified the following deviations and exceptions to Regulatory Guide 1.97. These are discussed in the following paragraphs.
3.3.1 Reactor Coolant System (RCS) Pressure Regulatory Guide 1.97 recommends instrumentation for a Combustion Engineering nuclear steam supply system with a range of 0 to 4000 psig for
~
this variable. The licensee utilizes the pressurizer pressure instrumentation for this variable. The RCS and the pressurizer pressure are essentially the same. This is acceptable except that the range is 0 to 2500 psig. The licensee states that the existing range of 5
i
0 to 2500 psig is adequate to monitor all expected pressures based on the accident analyses presented in the updated Safety Analysis Report (USAR) and is acceptable pending resolution of the anticipated transient without scram ( ATWS) issue.
~
In Reference 6, the licensee has committed to install additional Category 1 instrumentation with a range from 1900 to 2900 psia. This is in ,
accordance with the resolution of the ATWS issue, where a peak pressure of 2600 psia is expected based on analysis. Therefore, this is an acceptable deviation.
3.3.2 Core Exit Temperature The licensee has identified this as a Type A variable. As such, Category 1 recommendations must be met by the instrumentation. In this, the licensee has identified a deviatio1 that there is no continuous display of this information in the control room, but it is available on demand on the safety parameter display system (SPDS).
The NRC is reviewing the acceptability of this variable as part of their review of NUREG-0737, Item II.F.2.
l 3.3.3 Coolant Level in Reactor Regulatory Guide 1.97 recommends continuous indication of this variable with a range frors the bottom of the core to the top of the vessel. The licensee is installing a heated junction thermocouple level measurement system for this variable. The range is from the top of the core to the top of the vessel, and there is no continuous display of this information in the control room, but it is available on demand on the SPDS.
The licensee deviates from Regulatory Guide 1.97 with respect to the ,
instrumentation for the variable coolant level in reactor. This deviation goes beyond the scope of this review and is being addressed by the NRC as part of their review of NUREG-0737, Item II.F.2.
i l 6
3.3.4 Containment Isolation Valve Position From the information provided, we find that the licensee deviates from a strict interpretation of the Category 1 redundancy recommendation. Only the active valves have position indication (i.e., check valves have no
. position indication). Since redundant isolation valves are provided, we find that redundant indication per valve is not intended by the regulatory guide. Position indication of check valves is specifically excluded by Table 2 of Regulatory Guide 1.97. Therefore, we find that the instrumentation for this variable is acceptable.
3.3.5 Radiation Level in Circulatina primary Coolant Regulatory Guide 1.97 recommends Category 1 instrumentation for this variable. The licensee has a radiation monitor on the letdown line (which is isolated from the RCS in an accident) and on-line gross gamma detectors that are part of the post-accident sampling system. The post-accident sampling system is being reviewed by the NRC as part of their review of NUREG-0737, Item II.8.3.
Based on the alternate instrumentation provided by the licensee, we conclude that the instrumentation supplied for this variable is adequate and, therefore, acceptable.
3.3.6 Containment Effluent Radioactivity Effluent Radioactivity Regulatory Guide 1.97 recommends Category 2 instrumentation for these variables. The licensee states that this instrumentation is not in full compliance with the Category 2 recommendations, but that it was installed to and meets the requirements of NUREG-0737.
We find this to be a good faith attempt, as defined in NUREG-0737, Supplement No. 1, Section 3.7 (Reference 3), to meet NRC requirements and is, therefore, acceptable.
7
3.3.7 Radiation Exposure Rate Revision 2 of Regulatory Guide 1.97 recommends Category 2 instrumentation for this variable. The licensee has Category 3 instrumentation for this variable. As Revision 3 of :he regulatory guide has changed the recommendation for this variable to Category 3 instrumentation, we find the instrumentation supplied for this variable ,
acceptable.
3.3.8 Accumulator Tank Level and Pressure Regulatory Guide 1.97 recommends Category 2 instrumentation for this variable with ranges of 10 to 90 percent of volume and 0 to 750 psig. The licensee's instrumentation meet; the recommendations for Category 2 instrumentation except for environmental qualification. The licensee states that the accumulators discharge their contents into the cold legs of the reactor coolant system automatically for either loss of coolant accidents (LOCA) or uncontrolled heat extraction events (steamline breaks).
The licensee supports using the present instrumentation with the following discussions:
- 1. Operator action for the accumulators is not assumed or possible
- 2. It is not possible to overpressurize the accumulators after an event
- 3. The accumulators do not provide a long term core cooling function
- 4. Environmentally qualified instrumeatation will not increase the reliability or availability of the accumulators.
The licensee states that the ranges provided are O to 100 percent level, but did not state this to be in compliance (the licensee has not indicated whether the range is in percent of tank volume or in percent of instrument tap height) and 0 to 300 psig, which is not in compliance. The 8
licensee states that the pressure is a minimum of 240 psig, and relief valves are set at 275 psig. On this basis, the range of 0 to 300 psig is acceptable. The licensee should provide justification in support of and clarify the level range.
. The existing instrumentation is not acceptable. An environmentally qualified instrument is necessary to monitor the status of these tanks to show that the accumulators have performed their safety functions. The licensee should designate either level or pressure as the key variable to directly indicate accumulator discharge and provide instrumentation for that variable that meets the requirements of 10 CFR 50.49 and Regulatory Guide 1.97. If level is used as the key variable, then the range should be expanded to satisfy the recommendations of Regulatory Guide 1.97.
3.3.9 Reactor Coolant pump Status Pressurizer Heater Status Regulatory Guide 1.97 recommends instrumentation for these variables that measures the current drawn by this equipment. The instrumentation provided by the licensee for these variables measures power (kilowatts).
The kilowatts of power used is a direct relation to the current.
Based on our review and judgment, we find the deviation of measuring power rather than current acceptable, as power has a known relation to current.
3.3.10 Containment Sumo Water Temperature Regulatory Guide 1.97 recommends Category 2 instrumentation for this variable with a range of 50 to 250*F. The licensee does not presently have
. instrumentation for this variable, stating that the net positive suction head is adequate for the safety injection and containment spray pumps when operating in the recirculation mode, regardless of the sump water temperature. The licensee also states that core cooling measurements infer containment cooling.
9
l
)
In Reference 5, the licensee commits to installing instrumentation for this variaDie that is in accordance with Regulatory Guide 1.97. We find this committment acceptable.
3.3.11 Letdown Flow-Out Regulatory Guide 1.97 recommends Category 2 instrumentation for this .
variable. The licensee's instrumentation is Category 3. The licensee states that the letdown system is isolated during accident conditions.
As this variable is not used in conjunction with a safety system, we find that the instrumentation provided is acceptable.
3.3.12 Volume Control Tank Level Regulatory Guide 1.97 recommends Category 2 instrumentation for this variable. The licensee's instrumentation is Category 3. The licensee states that the volume control tank is automatically bypassed during accident conditions; that the volume control tank is not a source of borated water for safety injection and that this instrument loop is not required to achieve a safe shutdown, s this variable is not used in conjunction with a safety system, we fino at the instrumentation provided is acceptable.
3.3.13 Component Coolina Water (CCW) Temperature to Engineered Safety Feature (ESF) System Component Cooling Water Flow to ESF System Regulatory Guide 1.97 recommends Category 2 instrumentation for this variable. The licensee's instrumentation is Category 2, except in the area of environmental qualification. The licensee states, in Reference 5, that the instrumentation for temperature is in a mild environment. Therefore, this instrumentation is acceptable.
10 l
-'m
In addition to the flow instrumentation, the licensee has Category 2 instrumentation to monitor the CCW pump motor current and Category 2 low flow alarms on the CCW flow outlet for each of the containment air cooling units. We find this combination of instrumentation acceptable for this variable.
3.3.14 Containment or Purge Effluent--Noble Gases and Vent Flow Rate Auxiliary Building--Noble Gases and Vent Flow Rate Common Plant Vent--Noble Gases and Vent Flow Rate Vent from Steam Generator Safety Relief Valves--Noble Gases.
Duration of Release and Mass of Steam per Unit Time Regulatory Guide 1.97 recommends Category 2 instrumentation for these variables. The licensee states that this instrumentation is not in full compliance with the Category 2 recommendations, but that it was installed to and meets the requirements of NUREG-0737.
We find this to be a good faith attempt, as defined in NUREG-0737, Supplement No. 1, Section 3.7 (Reference 3), to meet NRC requirements and is, therefore, acceptable.
3.3.15 Wind Direction Regulatory Guide 1.97 recommends instrumentation for this variable with an accuracy of 5*. In Reference 5, the licensee commits to provide calibration of this instrumentation that will provide this accuracy. We find this commitment acceptable.
3.3.16 Accident Sampling (Primary Coolant, Containment Air and Sump)
The licensee's post-accident sampling system provides sampling and analysis as recommended by the regulatory guide, except it does not have the recommended capability for dissolved oxygen or oxygen content. The 11
i j
licensee states that this was not a requirement of NUREG-0737, but that the dissolved oxygen and oxygen content parameters can be determined using chemistry procedures.
1 The licensee deviates from Regulatory Guide 1.97 with respect to post-accident sampling capability. This deviation goes beyond the scope of this review and is being addressed by the NRC as part of their review of ,
NUREG-0737, Item II.B.3.
9 1
I l
l l
12
- 4. CONCLUSIONS Based on our review, we find that the licensee either conforms to or is justified in deviating from Regulatory Guide 1.97, with the following exceptions:
- 1. Accumulator tank level and pressure--environmentally qualified instruments should be provided to show that the accumulators have performed their safety function; if level is the key variable to accomplish this, the licensee should verify the compliance of the level range (Section 3.3.8).
4
)
e 13
- 5. REFERENCES
- 1. NRC letter, D. G. Eisenhut to All Licensees of Operating Reactors, Applicants for Operating Licenses and Holders of Construction Permits, " Supplement No. 1 to NUREG-0737--Requirements for Emergency Response Capability (Generic Letter No. 82-33)," December 17, 1982.
- 2. Instrumentation for Licht-Water-Cooled Nuclear Power Plants to -
Assess Plant and Environs Conditions During and Following an Accident, Regulatory Guide 1.97, Revision 2, NRC, Office of ~
Standards Development, December 1980.
- 3. Clarification of TMI Action Plan Requirements. Requirements for Emergency Response Capability, NUREG-0737, Supplement No. 1 NRC, Office of Nuclear Reactor Regulation, January 1983.
- 4. Omaha Public Power District letter, R. L. Andrews to H. R. Denton, NRC, " Fort Calhoun Station Compliance with Regulatory Guide 1.97, Revision 2," April 1, 1985, LIC-85-ll7.
- 5. Omaha Public Power District letter, R. L. Andrews to D. E. Sells, NRC, "Conformance to Regulatory Guide 1.97, Revision 2",
October 21, 1986, LIC-86-532.
- 6. Instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident, Regulatory Guide 1.97, Revision 3, NRC, Office of Nuclear Regulatory Research, May 1983.
i e
37657 14
U t. NUCLE A2 at jtuk&fCAlv CCMaassasON
- k4PO4T NuM$im (Ass.gner @y ftOC egg Ver 43, if any, MAC 70Aes 3:4 12 4d1 o2 i
- cv nou"a - BIBLIOGRAPHIC DATA SHEET EGG-NTA-7157 SEE INSTRUCTIONS Om tut navgast 3 LE AVE . LANK 2 T6TLE A40 5LOTif LE Confornance to Regulatory Guide 1.97, Fort Calhoun Station 4 OATE 8570m7 COMPLETED MONT- vtAR t Aurma's> November 1986
- o^'e a" oar '55'es A. C. Udy oo~r- ..A.
l November -
1986 ss., e.C . ,.o..Cr,r Asowa u ., ~u....
,ae ,o... oo. a .Z.ria==*...~o.. v~o.co ,
EG&G Idaho, Inc. . ..~ ca ca.~T ~u a Idaho Falls, ID 83415 A6433 4
10 SPON5CmtNG ORGANIZAfiCN Nawt ANO wasuMG ADOmt15 uaesver t s Case, its Tvet OP atPOmr Division of PWR Licensing - A Technical Evaluation Report Office of Nuclear Reactor Regulation ""'""~'"""
U. S. Nuclear Regulatory Commission Washington, DC 20555 82 SUP8LEWE%ramv %CTES l + 3 AGSTR ACT t.'00 *eres s, ess#
This EGfG Idaho, Inc. report reviews the subnittals for Fort Calhoun and identifies areas of nonconfornance to Regulatory Guide 1.97. Exceptions to these guidelines are evaluated and those areas where sufficient basis for acceptability is not provided are identified.
t to OQCbVt%T 4%ALV$i& + e (IVVIfoaQ5,CESCRtPTCa5 il A v a s LA t* L. T v
$7ATEYENT Unlimited Distribution I
'e stCbarTV CLAssisiCAfiON l t T"a gener l
. .es%r:.. .s.C. ~ <%eec riaws Unclassified ;
, r. ,
l Unclassified l in s. ...c...cas I is *aica m ..