Confirms Util Response to Item II.F.1 of Sser 5 & License Condition 2.C(17) Re Commitment to Demonstrate That Iodine/Particulate Sampling Subsystem of Standby Gas Treatment Sys Will Function Properly Prior to Startup
ML20127J144
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/16/1985
From: Jens W
DETROIT EDISON CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
References
NE-85-0708, NE-85-708, NUDOCS 8505210390
Download: ML20127J144 (3)


Text

y - , ,. _ . - - ... ,- _

l 3- Wayne H. Jenz ucie ations Detro}t roo m '%

Edison REE = n=_

May 16, 1985 ,

NE-85-0708 i

D'irector of Nuclear Reactor Regulation Attention: Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Youngblood:

Reference:

(1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-33 (2) Detroit Edison Letter to NRC Region III,

" Transmittal of Action Plan for Completion of Certain NRC Open Items", EF2-70036, dated October 31, 1984 (3) Detroit Edison Letter to NRR, " Additional Clarification of Position Regarding NUREG-0737

. . Post Accident Sampling and Monitoring Capabilities", EF2-72030, dated December 13, 1984

'(4) Detroit Edison Letter to NRR, " Clarification of Position on Silicone Duct Sealant and Other

, Issues", EF2-72039, dated January 8, 1985

-(5) NRC Region III Inspection Report-No.

50-341/85-017 (DRSS), forwarded on Letter dated April 1, 1985 Subjects. Post-Accident Sampling and Analysis of Plant Effluents (Radiciodines and Particulates) t This letter is to confirm Detroit Edison's response to Item II.F.1 of Supplement 5 to the Fermi 2 Safety Evaluation Report

.and Condition 2.C(17) of the Fermi 2 License,-as discussed by telephone between Messrs. R. L. Andersen and A. E. Wegele of

~

Detroit Edison and C. A. Willis and C. R. Nichols of NRC METB, April'10-22, 1985.

These items relate to' Detroit Edison's commitment to demon-strate, prior to startup after the first refueling outage, that

~

the iodine / particulate sampling subsystem of the Standby Gas .

Tea =&= ant'svatem (SGTS) will perform its intended function.

8505210390 850516 PDR '

E ADOCK 05000341 00\

PDR ,

~ ~

_ _ . _ , . _ _ . . _._ n.

(

s Mr. B. J. Youngblood May 16, 1985 NE-85-0708 Page 2 TheLfollowing items were discussed:

1. The~ Fermi 2 SSER #5 includes the statement:

It'is the applicant's position that the noble gas monitor can be used to project the magnitude of radioiodine and particulate releases in the event that

.an accident occurs during the first fuel cycle.

It was agreed between Detroit Edison and the NRC that no such position has been.taken by Detroit Edison and that the statement in the SSER #5 is in error.

2. The Fermi 2 SSER #5 includes the statement:

However, in Report No.50-341/85-27 cited in the preceding section of this supplement, we stated that the applicant had not yet developed correction factors for' sample line losses due to iodine plateout and particulate. depositions so as to assure the collection of representative samples..

It was. agreed between Detroit Edison'and the NRC that Detroit Edison has developed such correction factors, as described in Reference (3), and that these correction factors have been incorporated into approved plant procedures, as' confirmed by NRC Region III in its closure of Open Item No. 341/84-43-04 Reference (5).

3. The Fermi 2 Facility Operating License, Reference (1), includes the statement:

1 Prior to startup following the first refueling outage, Detroit Edison shall demonstrate that the operating iodine / particulate sampling system will perform its intended function.

- Detroit Edison confirmed its position-that, through the use of calculated sample line loss factors in. approved procedures, as described.in-Reference (3), Detroit Edison's commitments to NUREG-0737,. Item II.F.1(2), and the applicable items of NRC Regulatory Guide 1.97, Revision 2,-have been met, and therefore that the License. condition has been satisfied.

4. Previous ~1etters-to NRC Region _III and NRR References (2)

.and (3), included a commitment to submit a scope for a

- sample line loss test, including an evaluation of the

. applicability of performing such a test.

f'~ l Mr. B.-J.:Youngblood May 16, 1985 ,

NE-85-0708  !

Page 3 It was agreed between Detroit Edison and the NRC that the need

.for submittal of this test scope and evaluation will be deferred until.such time as the NRC has completed a review and response

.to the'above, including making any necessary changes to the

- Fermi 2 SSER.

Should you have any questions, please contact Mr. O. K. Earle at (313) 586-4211.

Sincerely, l

ll( 'k hf4d cc:. Mr. P. M. Byron

()

Mr. W. Gammill.

Mr. M. David Lynch Mr. C. A. Nichols USNRC Document Control Desk Washington,-D.C. 20555-