Insp Repts 50-498/93-01 & 50-499/93-01 on 930111-15. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Program,Administrative Controls for Licensed Operator Requalification Exams & in-plant WalkthroughsML20128M106 |
Person / Time |
---|
Site: |
South Texas ![STP Nuclear Operating Company icon.png](/w/images/9/9c/STP_Nuclear_Operating_Company_icon.png) |
---|
Issue date: |
02/09/1993 |
---|
From: |
Pellet J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
---|
To: |
|
---|
Shared Package |
---|
ML20128M049 |
List: |
---|
References |
---|
50-498-93-01, 50-498-93-1, 50-499-93-01, 50-499-93-1, NUDOCS 9302220090 |
Download: ML20128M106 (10) |
|
|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000498/19990161999-10-0707 October 1999 Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000498/19990151999-09-29029 September 1999 Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24.No Violations Noted.Major Areas Inspected:Licensed Operators Requalification Program IR 05000199/19990121999-09-14014 September 1999 Insp Repts 50-498/99-12 & 50-199/99-12 on 990816-19.Three Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Access Authorization,Assessment Aids,Security Event Logs & Security Program Audits IR 05000499/19990141999-09-0303 September 1999 Insp Repts 50-499/99-14 & 50-499/99-14 on 990627-0807.NCVs Noted.Major Areas Inspected:Aspects of Licensee Operation, Maint,Engineering & Plant Support IR 05000498/19990081999-08-16016 August 1999 Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607- 10.No Violation Noted.Major Areas Inspected:Corrective Action Program Implementation at Plant IR 05000498/19990131999-07-21021 July 1999 Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626. Noncited Violations Noted Re Failure to Follow Procedures by Shift Supervisor Authorizing Deviation from Procedure Used to vacuum-fill RHR Sys & to Follow Plant Startup Procedure IR 05000498/19990111999-06-10010 June 1999 Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19990091999-05-25025 May 1999 Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program ML20206H6361999-05-0505 May 1999 Insp Repts 50-498/99-06 & 50-499/99-06 on 990221-0403. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990101999-04-22022 April 1999 Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted.Major Areas Inspected:Review of Licensee Inservice Exam Program Plan & Schedule & Implementation of Program Plan for Facilities IR 05000498/19990071999-04-22022 April 1999 Insp Repts 50-498/99-07 & 50-499/99-07 on 990405-09. Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on Unit 1 Refueling Outage Activities IR 05000498/19990051999-03-29029 March 1999 Insp Repts 50-498/99-05 & 50-499/99-05 on 990301-05.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980191999-03-26026 March 1999 Insp Repts 50-498/98-19 & 50-499/98-19 on 990125-0317. Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000498/19990041999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint ML20205A1601999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint IR 05000498/19980171999-03-23023 March 1999 Cancellation of Insp Repts 50-498/98-17 & 50-499/98-17.No Insp Rept Will Be Issued for Util with Listed Number IR 05000498/19990021999-03-16016 March 1999 Insp Repts 50-498/99-02 & 50-499/99-02 on 990110-0220. No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000498/19990031999-03-0404 March 1999 Insp Repts 50-498/99-03 & 50-499/99-03 on 990222-25.No Violations Noted.Major Areas Inspected:Plant Support ML20203D5711999-02-10010 February 1999 Insp Repts 50-498/98-15 & 50-499/98-15 on 990614-1123. Violations Noted.Major Areas Inspected:Review of Circumstances Surrounding 980614 Fire in Potential Transformer & Subsequent Deenergization of Switchgear E1B IR 05000498/19980111999-02-0404 February 1999 Insp Repts 50-498/98-11 & 50-499/98-11 on 981129-990109.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990011999-01-27027 January 1999 Insp Repts 50-498/99-01 & 50-499/99-01 on 990104-07.No Violations Noted.Major Areas Inspected:Insp Reviewed Implementation of Solid Radwaste Mgt & Radioactive Matl Transportation Programs & Plant Support IR 05000498/19980161998-12-24024 December 1998 Insp Repts 50-498/98-16 & 50-499/98-16 on 981207-10.No Violations Noted.Major Areas Inspected:Plant Support, Including Alarm Stations,Security Equipment,Vital Area Barriers & Detection Aids & Security Event Logs IR 05000498/19980101998-12-22022 December 1998 Insp Repts 50-498/98-10 & 50-499/98-10 on 981018-1125.No Violations Noted.Major Areas Inspected:License Operations, Maint,Engineering & Plant Support IR 05000498/19980201998-12-0202 December 1998 Insp Repts 50-498/98-20 & 50-499/98-20 on 981102-05. Violation Noted.Major Areas Inspected:Radiological Controlled Area Access Controls,Radiation Work Permits, Radiological Surveys & pre-job Health Physics Briefings IR 05000498/19980091998-11-12012 November 1998 Insp Repts 50-498/98-09 & 50-499/98-09 on 980906-1017. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980181998-10-21021 October 1998 Insp Repts 50-498/98-18 & 50-499/98-18 Has Been Canceled.No Insp Rept Will Be Issued IR 05000498/19980081998-09-28028 September 1998 Insp Repts 50-498/98-08 & 50-499/98-08 on 980726-0905.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19980141998-08-31031 August 1998 Insp Repts 50-498/98-14 & 50-499/98-14 on 980706-23.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980131998-08-14014 August 1998 Insp Repts 50-498/98-13 & 50-499/98-13 on 980804-07.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000498/19980071998-08-11011 August 1998 Insp Repts 50-498/98-07 & 50-499/98-07 on 980614-0725.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19983011998-07-14014 July 1998 Insp Repts 50-498/98-301 & 50-499/98-301 on 980601-04.No Violations Noted.Major Areas Inspected:Examiners Evaluated Competency of 6 Senior Operator Applicants for Issuance of Operating Licenses at Plant,Units 1 & 2 & Operations IR 05000498/19980061998-07-0808 July 1998 Insp Repts 50-498/98-06 & 50-499/98-06 on 980503-0613. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980051998-05-18018 May 1998 Insp Repts 50-498/98-05 & 50-499/98-05 on 980322-0502. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980041998-04-20020 April 1998 Insp Repts 50-498/98-04 & 50-499/98-04 on 980214-0321. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support IR 05000498/19980031998-03-24024 March 1998 Insp Repts 50-498/98-03 & 50-499/98-03 on 980104-0214. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Emergency Facilities IR 05000498/19980121998-03-24024 March 1998 Insp Repts 50-498/98-12 & 50-499/98-12 on 980223-27.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program,Including Review of Access Authorization Program,Testing & Maint & Security Program Plans ML20202D7781998-02-12012 February 1998 Insp Repts 50-498/98-02 & 50-499/98-02 on 980112-15. Violations Noted.Major Areas Inspected:Operations & Plant Support Re Radiation Protection IR 05000498/19970081998-01-23023 January 1998 Insp Repts 50-498/97-08 & 50-499/97-08 on 971116-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000498/19973011997-12-18018 December 1997 Insp Repts 50-498/97-301 & 50-499/97-301 on 971020-1205. Violations Noted.Major Areas Inspected:Competency of 6 RO & 8 SROs for Issuance of Operating Licenses at South Texas Project Facility IR 05000498/19970071997-12-10010 December 1997 Insp Repts 50-498/97-07 & 50-499/97-07 on 971005-1115.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970061997-12-0808 December 1997 Insp Repts 50-498/97-06 & 50-499/97-06 on 970810-1004. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970251997-11-28028 November 1997 Partially Withheld Insp Repts 50-498/97-25 & 50-499/97-25 on 971103-07 (Ref 10CFR73.21).Major Areas Inspected:Physical Security Program,Maint,Audits,Protected Area Barriers, Testing of Intrusion Detection Sys & Control Equipment IR 05000498/19970261997-11-28028 November 1997 Insp Repts 50-498/97-26 & 50-499/97-26 Has Been Cancelled. No Insp Rept Will Be Issued ML20199J5591997-11-21021 November 1997 Insp Repts 50-498/97-24 & 50-499/97-24 on 970915-1112.No Violations Noted.Major Areas Inspected:Electrical,Mechanical & Instrumentation & Control Calculations to Assess Scope of Design Control Weakness ML20199E1971997-11-14014 November 1997 Rev 1 to Insp Repts 50-498/97-05 & 50-499/97-05 on 970629-0809,correcting Errors in Numbering of Insp Followup Sys Open Items & Some Items Identified in Executive Summary IR 05000498/19970231997-11-12012 November 1997 Insp Repts 50-498/97-23 & 50-499/97-23 on 970811-15,25-29 & 0903-04.No Violations Noted.Major Areas Inspected: Operations,Maint & Engineering IR 05000498/19970211997-10-0101 October 1997 Partially Withheld Insp Repts 50-498/97-21 & 50-499/97-21 on 970902-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Physical Security Program,Including Access Authorization.Mgt Support & Security Program Audits IR 05000498/19970191997-09-26026 September 1997 Insp Repts 50-498/97-19 & 50-499/97-19 on 970825-28.No Violations Noted.Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000498/19970131997-09-26026 September 1997 Insp Repts 50-498/97-13 & 50-499/97-13 on 970902-04.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000498/19970201997-09-16016 September 1997 Insp Repts 50-498/97-20 & 50-499/97-20 on 970811-14.No Violations Noted.Major Areas Inspected:Operations Re Annual Operating Requalification Exams 1999-09-03
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000498/19990161999-10-0707 October 1999 Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000498/19990151999-09-29029 September 1999 Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24.No Violations Noted.Major Areas Inspected:Licensed Operators Requalification Program IR 05000199/19990121999-09-14014 September 1999 Insp Repts 50-498/99-12 & 50-199/99-12 on 990816-19.Three Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Access Authorization,Assessment Aids,Security Event Logs & Security Program Audits IR 05000499/19990141999-09-0303 September 1999 Insp Repts 50-499/99-14 & 50-499/99-14 on 990627-0807.NCVs Noted.Major Areas Inspected:Aspects of Licensee Operation, Maint,Engineering & Plant Support IR 05000498/19990081999-08-16016 August 1999 Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607- 10.No Violation Noted.Major Areas Inspected:Corrective Action Program Implementation at Plant IR 05000498/19990131999-07-21021 July 1999 Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626. Noncited Violations Noted Re Failure to Follow Procedures by Shift Supervisor Authorizing Deviation from Procedure Used to vacuum-fill RHR Sys & to Follow Plant Startup Procedure IR 05000498/19990111999-06-10010 June 1999 Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19990091999-05-25025 May 1999 Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program ML20206H6361999-05-0505 May 1999 Insp Repts 50-498/99-06 & 50-499/99-06 on 990221-0403. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990101999-04-22022 April 1999 Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted.Major Areas Inspected:Review of Licensee Inservice Exam Program Plan & Schedule & Implementation of Program Plan for Facilities IR 05000498/19990071999-04-22022 April 1999 Insp Repts 50-498/99-07 & 50-499/99-07 on 990405-09. Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on Unit 1 Refueling Outage Activities IR 05000498/19990051999-03-29029 March 1999 Insp Repts 50-498/99-05 & 50-499/99-05 on 990301-05.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980191999-03-26026 March 1999 Insp Repts 50-498/98-19 & 50-499/98-19 on 990125-0317. Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000498/19990041999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint ML20205A1601999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint IR 05000498/19980171999-03-23023 March 1999 Cancellation of Insp Repts 50-498/98-17 & 50-499/98-17.No Insp Rept Will Be Issued for Util with Listed Number IR 05000498/19990021999-03-16016 March 1999 Insp Repts 50-498/99-02 & 50-499/99-02 on 990110-0220. No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000498/19990031999-03-0404 March 1999 Insp Repts 50-498/99-03 & 50-499/99-03 on 990222-25.No Violations Noted.Major Areas Inspected:Plant Support ML20203D5711999-02-10010 February 1999 Insp Repts 50-498/98-15 & 50-499/98-15 on 990614-1123. Violations Noted.Major Areas Inspected:Review of Circumstances Surrounding 980614 Fire in Potential Transformer & Subsequent Deenergization of Switchgear E1B IR 05000498/19980111999-02-0404 February 1999 Insp Repts 50-498/98-11 & 50-499/98-11 on 981129-990109.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990011999-01-27027 January 1999 Insp Repts 50-498/99-01 & 50-499/99-01 on 990104-07.No Violations Noted.Major Areas Inspected:Insp Reviewed Implementation of Solid Radwaste Mgt & Radioactive Matl Transportation Programs & Plant Support IR 05000498/19980161998-12-24024 December 1998 Insp Repts 50-498/98-16 & 50-499/98-16 on 981207-10.No Violations Noted.Major Areas Inspected:Plant Support, Including Alarm Stations,Security Equipment,Vital Area Barriers & Detection Aids & Security Event Logs IR 05000498/19980101998-12-22022 December 1998 Insp Repts 50-498/98-10 & 50-499/98-10 on 981018-1125.No Violations Noted.Major Areas Inspected:License Operations, Maint,Engineering & Plant Support IR 05000498/19980201998-12-0202 December 1998 Insp Repts 50-498/98-20 & 50-499/98-20 on 981102-05. Violation Noted.Major Areas Inspected:Radiological Controlled Area Access Controls,Radiation Work Permits, Radiological Surveys & pre-job Health Physics Briefings IR 05000498/19980091998-11-12012 November 1998 Insp Repts 50-498/98-09 & 50-499/98-09 on 980906-1017. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980181998-10-21021 October 1998 Insp Repts 50-498/98-18 & 50-499/98-18 Has Been Canceled.No Insp Rept Will Be Issued IR 05000498/19980081998-09-28028 September 1998 Insp Repts 50-498/98-08 & 50-499/98-08 on 980726-0905.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19980141998-08-31031 August 1998 Insp Repts 50-498/98-14 & 50-499/98-14 on 980706-23.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980131998-08-14014 August 1998 Insp Repts 50-498/98-13 & 50-499/98-13 on 980804-07.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000498/19980071998-08-11011 August 1998 Insp Repts 50-498/98-07 & 50-499/98-07 on 980614-0725.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19983011998-07-14014 July 1998 Insp Repts 50-498/98-301 & 50-499/98-301 on 980601-04.No Violations Noted.Major Areas Inspected:Examiners Evaluated Competency of 6 Senior Operator Applicants for Issuance of Operating Licenses at Plant,Units 1 & 2 & Operations IR 05000498/19980061998-07-0808 July 1998 Insp Repts 50-498/98-06 & 50-499/98-06 on 980503-0613. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980051998-05-18018 May 1998 Insp Repts 50-498/98-05 & 50-499/98-05 on 980322-0502. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980041998-04-20020 April 1998 Insp Repts 50-498/98-04 & 50-499/98-04 on 980214-0321. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support IR 05000498/19980031998-03-24024 March 1998 Insp Repts 50-498/98-03 & 50-499/98-03 on 980104-0214. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Emergency Facilities IR 05000498/19980121998-03-24024 March 1998 Insp Repts 50-498/98-12 & 50-499/98-12 on 980223-27.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program,Including Review of Access Authorization Program,Testing & Maint & Security Program Plans ML20202D7781998-02-12012 February 1998 Insp Repts 50-498/98-02 & 50-499/98-02 on 980112-15. Violations Noted.Major Areas Inspected:Operations & Plant Support Re Radiation Protection IR 05000498/19970081998-01-23023 January 1998 Insp Repts 50-498/97-08 & 50-499/97-08 on 971116-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000498/19973011997-12-18018 December 1997 Insp Repts 50-498/97-301 & 50-499/97-301 on 971020-1205. Violations Noted.Major Areas Inspected:Competency of 6 RO & 8 SROs for Issuance of Operating Licenses at South Texas Project Facility IR 05000498/19970071997-12-10010 December 1997 Insp Repts 50-498/97-07 & 50-499/97-07 on 971005-1115.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970061997-12-0808 December 1997 Insp Repts 50-498/97-06 & 50-499/97-06 on 970810-1004. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970251997-11-28028 November 1997 Partially Withheld Insp Repts 50-498/97-25 & 50-499/97-25 on 971103-07 (Ref 10CFR73.21).Major Areas Inspected:Physical Security Program,Maint,Audits,Protected Area Barriers, Testing of Intrusion Detection Sys & Control Equipment IR 05000498/19970261997-11-28028 November 1997 Insp Repts 50-498/97-26 & 50-499/97-26 Has Been Cancelled. No Insp Rept Will Be Issued ML20199J5591997-11-21021 November 1997 Insp Repts 50-498/97-24 & 50-499/97-24 on 970915-1112.No Violations Noted.Major Areas Inspected:Electrical,Mechanical & Instrumentation & Control Calculations to Assess Scope of Design Control Weakness ML20199E1971997-11-14014 November 1997 Rev 1 to Insp Repts 50-498/97-05 & 50-499/97-05 on 970629-0809,correcting Errors in Numbering of Insp Followup Sys Open Items & Some Items Identified in Executive Summary IR 05000498/19970231997-11-12012 November 1997 Insp Repts 50-498/97-23 & 50-499/97-23 on 970811-15,25-29 & 0903-04.No Violations Noted.Major Areas Inspected: Operations,Maint & Engineering IR 05000498/19970211997-10-0101 October 1997 Partially Withheld Insp Repts 50-498/97-21 & 50-499/97-21 on 970902-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Physical Security Program,Including Access Authorization.Mgt Support & Security Program Audits IR 05000498/19970191997-09-26026 September 1997 Insp Repts 50-498/97-19 & 50-499/97-19 on 970825-28.No Violations Noted.Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000498/19970131997-09-26026 September 1997 Insp Repts 50-498/97-13 & 50-499/97-13 on 970902-04.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000498/19970201997-09-16016 September 1997 Insp Repts 50-498/97-20 & 50-499/97-20 on 970811-14.No Violations Noted.Major Areas Inspected:Operations Re Annual Operating Requalification Exams 1999-09-03
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000498/19990161999-10-0707 October 1999 Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000498/19990151999-09-29029 September 1999 Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24.No Violations Noted.Major Areas Inspected:Licensed Operators Requalification Program IR 05000199/19990121999-09-14014 September 1999 Insp Repts 50-498/99-12 & 50-199/99-12 on 990816-19.Three Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Access Authorization,Assessment Aids,Security Event Logs & Security Program Audits IR 05000499/19990141999-09-0303 September 1999 Insp Repts 50-499/99-14 & 50-499/99-14 on 990627-0807.NCVs Noted.Major Areas Inspected:Aspects of Licensee Operation, Maint,Engineering & Plant Support PNO-IV-99-037, on 990822,Region IV Dispatched Inspector to STP to Relieve Resident Inspectors & to Provide Assistance to STP Nuclear Operating Co,In Anticipation of Hurricane Bret.Representative Was Also Dispatched to FEMA Region VI1999-08-23023 August 1999 PNO-IV-99-037:on 990822,Region IV Dispatched Inspector to STP to Relieve Resident Inspectors & to Provide Assistance to STP Nuclear Operating Co,In Anticipation of Hurricane Bret.Representative Was Also Dispatched to FEMA Region VI IR 05000498/19990081999-08-16016 August 1999 Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607- 10.No Violation Noted.Major Areas Inspected:Corrective Action Program Implementation at Plant IR 05000498/19993011999-07-26026 July 1999 Exam Repts 50-498/99-301 & 50-499/99-301 on 990706-15.Exam results:17 Applicants Passed Exams & Exhibited No Broad Knowledge or Training Weaknesses IR 05000498/19990131999-07-21021 July 1999 Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626. Noncited Violations Noted Re Failure to Follow Procedures by Shift Supervisor Authorizing Deviation from Procedure Used to vacuum-fill RHR Sys & to Follow Plant Startup Procedure IR 05000498/19990111999-06-10010 June 1999 Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19990091999-05-25025 May 1999 Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program ML20206H6361999-05-0505 May 1999 Insp Repts 50-498/99-06 & 50-499/99-06 on 990221-0403. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990071999-04-22022 April 1999 Insp Repts 50-498/99-07 & 50-499/99-07 on 990405-09. Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on Unit 1 Refueling Outage Activities IR 05000498/19990101999-04-22022 April 1999 Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted.Major Areas Inspected:Review of Licensee Inservice Exam Program Plan & Schedule & Implementation of Program Plan for Facilities IR 05000498/19990051999-03-29029 March 1999 Insp Repts 50-498/99-05 & 50-499/99-05 on 990301-05.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980191999-03-26026 March 1999 Insp Repts 50-498/98-19 & 50-499/98-19 on 990125-0317. Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000498/19990041999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint ML20205A1601999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint IR 05000498/19980171999-03-23023 March 1999 Cancellation of Insp Repts 50-498/98-17 & 50-499/98-17.No Insp Rept Will Be Issued for Util with Listed Number IR 05000498/19990021999-03-16016 March 1999 Insp Repts 50-498/99-02 & 50-499/99-02 on 990110-0220. No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000498/19990031999-03-0404 March 1999 Insp Repts 50-498/99-03 & 50-499/99-03 on 990222-25.No Violations Noted.Major Areas Inspected:Plant Support ML20203D5711999-02-10010 February 1999 Insp Repts 50-498/98-15 & 50-499/98-15 on 990614-1123. Violations Noted.Major Areas Inspected:Review of Circumstances Surrounding 980614 Fire in Potential Transformer & Subsequent Deenergization of Switchgear E1B ML20203D5611999-02-10010 February 1999 Notice of Violation from Insp on 980614-1123.Violation Noted:From 980614-0615,period Greater than 8 Hours,Unit 1 Channel III 125-volt Battery Bank E1B11 Inoperable with Reactor in Mode 1 & Reactor Not Placed in Hot Standby IR 05000498/19980111999-02-0404 February 1999 Insp Repts 50-498/98-11 & 50-499/98-11 on 981129-990109.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990011999-01-27027 January 1999 Insp Repts 50-498/99-01 & 50-499/99-01 on 990104-07.No Violations Noted.Major Areas Inspected:Insp Reviewed Implementation of Solid Radwaste Mgt & Radioactive Matl Transportation Programs & Plant Support IR 05000498/19980161998-12-24024 December 1998 Insp Repts 50-498/98-16 & 50-499/98-16 on 981207-10.No Violations Noted.Major Areas Inspected:Plant Support, Including Alarm Stations,Security Equipment,Vital Area Barriers & Detection Aids & Security Event Logs IR 05000498/19980101998-12-22022 December 1998 Insp Repts 50-498/98-10 & 50-499/98-10 on 981018-1125.No Violations Noted.Major Areas Inspected:License Operations, Maint,Engineering & Plant Support ML20196G9171998-12-0202 December 1998 Notice of Violation from Insp on 981102-05.Violation Noted:Licensee Did Not Make Surveys to Ensure Compliance with 10CFR20.1902,requiring Posting of Each Radiation Area with Conspicuous Sign or Signs Bearing Radiation Symbol IR 05000498/19980201998-12-0202 December 1998 Insp Repts 50-498/98-20 & 50-499/98-20 on 981102-05. Violation Noted.Major Areas Inspected:Radiological Controlled Area Access Controls,Radiation Work Permits, Radiological Surveys & pre-job Health Physics Briefings IR 05000498/19980091998-11-12012 November 1998 Insp Repts 50-498/98-09 & 50-499/98-09 on 980906-1017. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20195F2921998-11-12012 November 1998 Notice of Violation from Insp on 980906-1017.Violation Noted:On 980922,Work Order BS-354091 Contained Maint Instructions That Were Inappropriate to Circumstances IR 05000498/19980181998-10-21021 October 1998 Insp Repts 50-498/98-18 & 50-499/98-18 Has Been Canceled.No Insp Rept Will Be Issued IR 05000498/19980081998-09-28028 September 1998 Insp Repts 50-498/98-08 & 50-499/98-08 on 980726-0905.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19980141998-08-31031 August 1998 Insp Repts 50-498/98-14 & 50-499/98-14 on 980706-23.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980131998-08-14014 August 1998 Insp Repts 50-498/98-13 & 50-499/98-13 on 980804-07.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000498/19980071998-08-11011 August 1998 Insp Repts 50-498/98-07 & 50-499/98-07 on 980614-0725.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19983011998-07-14014 July 1998 Insp Repts 50-498/98-301 & 50-499/98-301 on 980601-04.No Violations Noted.Major Areas Inspected:Examiners Evaluated Competency of 6 Senior Operator Applicants for Issuance of Operating Licenses at Plant,Units 1 & 2 & Operations ML20236M3011998-07-0808 July 1998 Notice of Violation from Insp on 980503-0613.Violation Noted:Fire Brigade Training Drill Did Not Assess Each Member'S Knowledge of Role in Fire Fighting Strategy for Area Assumed to Contain Fire IR 05000498/19980061998-07-0808 July 1998 Insp Repts 50-498/98-06 & 50-499/98-06 on 980503-0613. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20237E7231998-06-0202 June 1998 EN-98-042:informs Commission That NRC Will Issue Confirmatory Order Modifying Licensee (Effective Immediately) & Exercise Discretion IAW Section VII.B.6 of Enforcement Policy Not to Issue NOV IR 05000498/19980051998-05-18018 May 1998 Insp Repts 50-498/98-05 & 50-499/98-05 on 980322-0502. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20247M4751998-05-18018 May 1998 Notice of Violation from Insp on 980322-0502.Violation Noted:Combustible Matl,Specifically,Wood Scaffold Installed & Remained in safety-related 2A Isolation Valve Cubicle from Feb 1997 Until April 1998,unattended & W/O Evaluation IR 05000498/19980041998-04-20020 April 1998 Insp Repts 50-498/98-04 & 50-499/98-04 on 980214-0321. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support ML20217A8451998-04-20020 April 1998 Notice of Violation from Insp on 980214-0321.Violation Noted:Licensee Updated UFSAR to Reflect New LOCA Radiological Analysis,Which Increased Thyroid Dose to CR Operator,W/O Obtaining Prior NRC Review & Approval ML20217B5581998-03-24024 March 1998 Notice of Violation from Insp on 980104-0214.Violation Noted:Fire Hose Stations Listed in Addendum 3 of Procedure OPGP03-ZF-0018 Not Operable When Equipment in Area to Be Protected Required to Be Operable by TS IR 05000498/19980121998-03-24024 March 1998 Insp Repts 50-498/98-12 & 50-499/98-12 on 980223-27.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program,Including Review of Access Authorization Program,Testing & Maint & Security Program Plans IR 05000498/19980031998-03-24024 March 1998 Insp Repts 50-498/98-03 & 50-499/98-03 on 980104-0214. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Emergency Facilities ML20202D7781998-02-12012 February 1998 Insp Repts 50-498/98-02 & 50-499/98-02 on 980112-15. Violations Noted.Major Areas Inspected:Operations & Plant Support Re Radiation Protection ML20202D7701998-02-12012 February 1998 Notice of Violation from Insp on 980112-15.Violation Noted: Radiation Workers Who Were Likely to Receive Occupational Dose in Excess of 100 Mrems Per Yr Were Not Informed of Presence of Airborne Radioactivity IR 05000498/19970081998-01-23023 January 1998 Insp Repts 50-498/97-08 & 50-499/97-08 on 971116-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20197F3461997-12-22022 December 1997 Notice of Violation from Insp on 971112.Violations Noted: Programmatic Calculation Deficiencies,First Identified in Observation 92-01-13 Not Promptly Corrected 1999-09-03
[Table view] |
Text
_ _ __ _ _ _ _ - _ _ _
. ..
.
..
!~ APPENDIX B U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
Inspection Report: 50-498/93-01 50-499/93-01 Operating Licenses: NPF-76 NPF-80 Licensee: Houston Lighting & Power Company P.O. Box 1700 Houston, Texas 77001 Facility Name: South Texas Project (STP), Units 1 and 2 Inspection At: STP, Bay City, Texas Inspection Ceaducted: January 11-15, 1993 laspectors: T. O. McKernon, lead Inspector, Operations Section Division of_ Reactor Safety R. E. Lantz, Examiner, Operations Section Division of Reactor Safety J. L. Pellet, Chief, Operations Section Division of Reactor Safety Accompanying Personnel: B. Hughes, Operator Licensing Branch, Office of Nuclear Reactor Regulation j M. M. Blamonte, Human Factors Branch, Office of 1 Nuclear Reactor Regulation )
l}g Approved: W 1 1 $3_
. Tel et, Chief, Operations Section Dakel Division of Reactor Safety inspection Summan Areas Inspected: Special announced inspection of the licensed operator requalification program, which included a review of administrative controls for licensed operator training, and observation of operators during the conduct of facility licensee annual licensed operator requalification examinations. The team also observed the performance of the examination evaluators in the simulator and during in-plant walkthroughs. The inspectors 9302220090 930211
.PDR ADOCK 05000498 G PDR ..t
_ - _-___________ - _ __ _ -
,. -
- __. = - ___ ___. -- _ - ___.-_ . . . .
.
-
2-used the guidance provided in Temporary Instruction 2515/117, Revision 0, issued December 8, 199 Results:
,
- Operators' performance during the operating examinations was good-(Section 1.2).
- Evaluators' performance during the operating examinations was good (Section 1.3).
- The training department appeared effective in. implementing the_ licensed operator requalification training program (Sectior. 1.3).
- The lack of a formal approved training plan or formal sample plan, over-at least a 6 month period, is indicative of a lack of effective self-analysis and prompt corrective action * The lack of a formal revision system for the training plan is indicative of a weak tracking syste * There appeared to be a prior lack of operations commitment to training needs identification (Section 1.1).
- Simulator fidelity a)peared acceptable with one minor inconsistency observed regarding tie safety injection accumulators modeling (Section 1.4),
- The training department did not have an approved biennial licensed operator training plan (Violation 498/9301-01; 499/9301-01)
(Section 1.1).
- During the inspection a licensee health physicist entered the radiological control area without the. required dosimetry (Noncited Violation) (Section 1.2).
Summar_v of Inspection Findinos:
- Violation 498/9301-01; 499/9301-01 was opened (Section 1.'l).
- - A'noncited violation was identified (Section:1.2).
Attachments:
- Attachment 1 - Persons Contacted'and Exit Meeting
- Attachment 2 - Documents Reviewed
,
- . Attachment 3 - Simulation Facility Report
- m -.e a na- a --
.. ,,--a
_
,. .
-3-DETAILS 1 LICENSED OPERATOR REQUALIFICATION PROGRAM EVALUATION (TI 2515/117)
During the inspection, the licensee's requalification program was assessed to determine whe!.her the program incorporated appropriate requirements for both evaluating operater's mastery of training objectives and revising the program in accordance with 10 CFR 55. The licensed operator requalification program assessment included a review of training material for the past year, evaluation of the program's controls to assure a systems approach to training, and operating crew performance during annual requalification examination This included review of the facility documents listed in Attad ment Further, the inspectors assessed the effectiveness of the examination evaluators in conducting the examination .1 Licensed Operator Reaualification Operatina Examinations The inspectors reviewed tne licensce's simulator scenarios and job performance measures (JPMs) used in the examination. The inspectors discussed with the-training specialists the sampling technique used in choosing the examination items. The training specialists stated that they used the verbal guidance of their supervisors, and the training department Procedure NTP-230. A review of Procedure NTP-230 indicated that guidance for developing simulator examination scenarios existed which included format, validation requirements, use of critical tasks, and failure criteria evaluation sheet However, no formal-guidance for sampling from the bank of some 59 scenarios existed. When
,
queried, one evaluator, who constructed the examination, was unaware that one-of the scenarios selected was also a scenario used in training during the past year. Other similar weaknesses were noted with the sampling methodology. For example, two of the scenarios utilized in examining one-of the_ crews contained the same major plant events and two similar significant malfunctions. The inspectors considered the lack of a formalized sample plan as a program weakness and a vulnerability.
. The inspectors reviewed the JPMs used in the simulator, control room, and plant walkthrough portion of the examination. The JPMs had been developed'
acceptably in accordance with Procedure NTP-230. -However, similar to the *
examination scenarios there was no formalized sample plan which guided the
,
training specialists in their sampling frnm the JPM bank. In discussions, training specialists stated that they were instructed verbally as to what types of scenarios and JPMs to select.
$- The inspectors inquired as to the existence of a sample plan and a biennial
- licensed operator training plan. The licensee representatives stated that a e
formalized biennial training plan did not exist, but rather an informal uncontrolled training matrix marked in pencil was used. This matrix allowed the training manager to revise the plan easily. 1he matrix did not appear to provide a controlled method for tracking training tasks in that no assurance
_
,
.. .
.
-4-existed that a training task would not inadvertently be delete The inspectors concluded that the informal matrix appeared to_ be a weak tracking system. Similarly, the inspectors noted an apparent lack of prior input by the operations department into the requalification program training requirements. This condition appeared to be improving as a result of
'
establishing the curriculum review council. The inspectors reviewed Procedure NTP-230 which indicated that no guidance for a sample plan existed. However, Procedure NTP-230, paragraphs 6.3.5.3 and 6.3.5.4 requires that a biennial licensed operator training plan be approved by the technical advisory -
council (TAC). The inspectors determined that no formalized and controlled training plan existed or was approved by that council. The program's effectiveness resided with training department personnel in lieu of a controlled and delineated process. The inspectors also noted that due to conflicting procedures, it was not obvious which members of the facility comprised the TAC. The failure to have an approved biennial-licensed operator training plan is a violation of Appendix B of 10 CFR 50, Criterion V, for failure to foll w an approved procedure (498/9301-01; 499/9301-01).
In addition to the above, the inspectors reviewed the lesson plans for licensed operator requalification (LOR) Course LOR 925. The course included classroom training (lessons learned, plant modifications, industry information, discussions of plant evolutions and events, and other information), required reading, simulater sessions, and other training needs. -
The inspectors noted that the majority of lessons plans consisted of the base information alone such as a licensee event report, a procedure, plant modifications, and others. Much of the training utilized the information from g
licensed operator training course lesson plans in lieu.of-separate = LOR lesson j plans. The inspectors noted that a recent independent third-party audit of the licensed operator requalification program had observed the same conditio The inspectors considered the lack of a formalized _ specific requalification curriculum a vulnerability to the program's effectiveness.
L l 1.2 Conduct of Ooeratina Tests The inspectors also observed two operating crews in:the _ dynamic simulator ~ and performing JPMs. A staff crew was observed in the dynamic simulator. The inspectors noted that the examinations were co.1 ducted as planned and errors discovered were documented and tracked for correction by a deficiency repor No major crew or operator performance errors occurred during the examination Those minor problems observed were adequately addressed by. the evaluator The post simulator examination critiques by the evaluators were effective in'
identifying the strengths and weaknesses of the crew and in adequately appraising the performance. The inspectors also-observed-that license management guidance paralleled crew performance during the simulator examinations. For example, the operating crews were expected to transition to the appropriate contingency action procedure, if the shift supervisor was confident in the diagnosis of the event, rather than waiting until the step in the parent procedure was reached. This performance was apparent when transitioning to the procedure for isolation of a faulted steam generator when the operators recognized a significant steam generator tube rupture condition.
,
.
_ _
. - _ _ _ _ _ _ - _ - - _ . _ _ _ _ _ _ _
..
,.
-5-The licensee had also incorporated industry events into the testing by using such scenarios as lifted or leaking pressurizer pressure operated relief valves. During the simulator scenario examinations, the inspectors observed good operator performance. The operators' understanding and interpretation of annunciators and alarm signals were good, as well as their subsequent diagnosis of events and conditions. The operators' control board operation was good and the operators demonstrated the appropriate level of plant knowledge. Overall, communications in the crews otserved was closed-loop, professional, and succinct. The crews demonstrated the proper compliance with plant procedures and Technical Specifications. In all instances, the responsible individual (e.g., unit supervisor) demonstrated good supervisory connand and control. Similarly, during the JPM portion of the examination, the operators demonstrated good knowledge and abilities in performing the JPMs. The inspectors considered the performance of the operators as goo During the performance of JPM walkthroughs, one of the operators being evaluated was required to enter the radiological control area (RCA). Upon arrival at the RCA access control point the operator being evaluated observed an alarming dosimeter (ALNOR) left in the automatic reader. The health physics (HP) personnel were informed. HP personnel quickly identified the individual as an HP technician who had recently entered the RCA with a survey meter. The HP personnel retrieved the technician from the RCA and determined that the individual had been in a low dose area for 10 minutes. HP personnel also issued a Radiological Occurrence Report ROR l-93-0016, to document the incident. The HP technician was counseled on the importance of radiological work permit compliance. The inspectors noted that the incit'ent was a violation of the licensee's Technical Specification Section 6.11 and Station Procedure OPGP03-ZR-0002 which requires obtaining the necessary dosimetry prior to RCA entry. However, the inspectors noted that the following enforcement discretion criteria applied: (a) the condition was identified by the licensee; (b) the violation appeared to be an isolated incident, was not considered safety significant, and was not a repeat of a previous violation; (c) the licensee took prompt corrective action by retrieving the individual from the RCA, determined the dosage for the area entered, documented the incident, counseled the indiviaual on work permit compliance, and informed the-NRC; and (d) it was not a willful violation. This violation will not be subject to enforcement action because the licensce's efforts in identifying and correcting the violation meet the criteria specified in Section VII.B.2 of Appendix C to 10 CFR .3 Licensee's Reaualification Examination EvaluQqn During the examinations and training, the inspectors assessed the effectiveness of the licensee's evaluators. The inspectors observed the evaluators control and coordinaticn of examinees, pre-examination briefings, simulator scenarios and post simulator scenario critiques, classroom traini_ng, and JPM walkthroughs (in the control room, simulator, and in-plant). Th simulator scenarios- and JPMs appeared clearly written and contained relevant critical tasks and objective performance standards. Performance standards were used objecttvely and consistently by the evaluators, and critiques of the
_
'
. .
,
.-
-6 operators and crews were accomplished in a disciplined and structured manne Training supervisors and training specialists appeared knowledgeable about the application of performance standards. Classroom training on the-emergency response plan, while not as formal and practiced in presentation as possible, was still effective in presenting the material to the operator Other training materials reviewed which were incorporated into the operators requalification training included lessons learned from both industry events and events / operator errors at the facility which had occurred since the last requalification period. Examples included past problems with unplanned engineered safety features actuation of a component cooling water pump and misinterpretation of training needs required to support a modification to the toxic gas monitoring system. Overall, the performance of the examination evaluators was good and training appeared effectiv .4 Simulator Fidelity The inspectors discussed with key licensee managers and training staff the capabilities of the simulator to support licensed operator training. Training staff members stated that a critical key in selecting and developing scenarios for the simulator was whether the simulator would function adequatel Licensee management agreed that simulator modeling and capability-had been a long standing problem and funding had been allocated to upgrade the simulator by 1995. An example of simulator incorrect modeling occurred when an operator, performing a JPM could not complete the task (drain down of a safety injection accumulator) due to the accumulator's level dropping quickly as described in Attachment 3. In subsequent questioning, it was determined that the training instructors selecting and preparing the JPH examination had not dynamically validated the JPMs, but rather had only statically validated the JPH text against the controls and procedures. The inspectors considered the lack of dynamic validation of the JPMs as another example of the training program's weakness in not having formalized and controlled guidance to ensure consistency and effectiveness. With the exception of the one inconsistency-observed, simulator fidelity appeared acceptabl .5 Examination Security Review of Procedure NTP-230 indicated that appropriate administrative guidance was included with respect to maintenance of examination security, prevention of examination compromise, and examinatten replacement actions should compromise occur Interviews with the training staff and key managers demonstrated that they were knowledgeable of the examination security procedures and were confident in ensuring examination integrit .6 Conclusions The inspectors concluded that the performance of licensed operators and evaluators, as represented by those observed during the annual examinations, s R
,
r 1:
-
.;.
.-
-1 f,L was good. During the ~ examinations, one minor simulator fidelity problem was observed, but the simulator modeling supported effective examinations. -The inspectors also observed one violation of health )hysics procedures due-to entry into the radiologically controlled area wit 1out dosimetry required by procedure, which was not cited. The training department appeared to be effective in implementing the licensed operator requalification progra flowever, the inspectors determined that the training and operations groups failed to develop and maintain a formal training plan, as required by facility procedures, which constituted a violation of the facility license. The informal training plan also exemplified a weak tracking system. The licensee was in the process of improving the program but corrective actions, such as revising training procedures, did not appear prompt. In addition, the lack of comprehensive and effective examination construction guidance or sample plan, and the ineffective validation of material used on the examination were-indicative of ineffective problem self-identification. The inspectors considered these weaknesses as a vulnerability in the licensee's requalification program because the program's effectiveness depends solely on the efforts of knowledgeable personnel rather than underlying formalized and controlled guidance.
't
%
.
J
-
-'
-___ _ -____ _ _ __.._
._
. .
,
.
AUAC1ERL1 1 PERSONS CONTACTED 1.1 LRmrLEenomel S. Ard, Training Specialist
- C. Ayala, Supervising Engineer
- J. Blevins, Supervisor, Procedure Control
- Comcaux, Consulting Engineer
- H. Chakravorty, Executive Director, Nuclear Safety P,eview Board G. Chitwood, Training Specialist
- K. Christian, Har.ager, Plant Operations
- R. Daily-Piggott, Licensing Engineering Specialist R. Graham, Training Staff
- D. Itall, Group Vice Prtsident, Nuclear
'H Johnson, Nuclear Licensing Technician
- W. Jump, General Hanager, Nuclear Licensing
- W. Kinsey, Vice President Nuclear Generation
- H. Ludwig, Manager, Nuclear Training
- T. Heinictri, Manager, Planning & Assessment W. Huntz, Training Instructor
- R. Rehkugler, Director, Quality Assurance
- J. Robbins, Organizational Development Cor.sultant
- L. Weldon, Manager, Operations Training 1.2 BRC h rso n el
- J. Tapia, Senior Resideht inspector in addition to the personnel listed above, the inspectors contacted other personnel during this inspection period, t
- Denotes personnel that attended the exit meetin EXIT MEETING An exit meeting was conducted on January 15, 199 During this meeting, the inspectors reviewed the scope and findings of the inspection. The licensee dio not identify as proprietary any information provided to, or reviewed by, the inspector .
_._.m.s_ _.___ ___um__ ._____ a_-___._u____ u-_a._._____---m-_ _ _ _ _ _ . - - --
- _ _ _ - _ _ _
,
,.
AU M ERLZ DOCUHENTS REVIEVED Course Attendance Record for Licensed Operator Requalification Course LOR 925 Courses LOR 921-925 Curriculum Review Committee Hinutes from December 1, 1992 Interdepartmental Procedure IP-8.24, " Simulator Configuration Management,"
Revision 2 Interdepartmental Procedure IP-8.lQ, " Training Program Review and Advisory Process," Revision 4 Interdepartmental Procedure IP-8.9Q, " Licensed Operator Requalification,"
Revision 4 Interdepartmental Procedure IP-3.07Q, "ASME Section XI Repair / Replacement Program," hevision S Lesson Plans for Training Course LOR 925, Code No.s LOR 700.01, LOT 503.01, and LOR 700.02 Licensed Operator feedback forms from Course LOR 924 Licensed Operator Requalification Training Audit, dated September 23, 1992 Nuclear Training Department Procedure NTP-230, " Conduct of Licensed Requalification and Simulator Training Programs," Revision 2 Nuclear Training Department Procedure NTP-303.1, " Analysis of System Data,"
Revision 2 Operations Department Procedure OPOPO4-ZO-n005, " Chemical Spills / Toxic Gas Release," Revision 1 Schedule Summary for Licensed Operator /Shif t Technical Advisor Training, (CHA Activity Completions input form)
Station Procedure CPGP03-ZE-0020. " Post-Maintenance Testing Program,"
Revision 3 Station Procedure OPOP01-ZA-018, " Emergency Operating Procedures User's Guide," Revision 3 Station Procedure OPGP03-ZR-0002, " Radiologically Controlled Area Access and Work Control," Revision 9 Station Procedure OPGP03-ZE-0031, " Design Change implementation," Revision 9 Station Procedure OPGP03-ZX-0002, " Corrective Action Program," Revision 0
<
___
_ _ _ _ _ _ _
.
O
&UAGENL)
$1MULAT10N FACILITY REPORT facility Licensee: Flouston Lighting & Power Company facility Dockets: 50-498 50-499 Operating Tests Administered on: January 14, 1993 During the conduct of simulator job performance measures portion of the operating tests, the following item was observed:
ITEM DESCRIPTION
"A" $1 Accumulator During performance of a JPH the operator was required level indication to drain down the "A" St Accomislator in order to reestablish proper level and boron concentration, llowever, upon establishing the proper system lineup the accumulator level abruptly fel The sudden change in accumulator level was not consistent with the real plan .__ _ -_-____-_-_ _ _-___- _ _____ - _ _ _