Category:CORRESPONDENCE-LETTERS
MONTHYEARNOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested1999-10-21021 October 1999 Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan1999-10-20020 October 1999 Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)1999-10-19019 October 1999 Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) ML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds 05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER1999-10-12012 October 1999 Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule1999-10-12012 October 1999 Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future1999-10-0707 October 1999 Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment1999-09-30030 September 1999 Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr1999-09-30030 September 1999 Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr1999-09-28028 September 1999 Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 19971999-09-21021 September 1999 Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl1999-09-21021 September 1999 Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P1999-09-21021 September 1999 Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-09-20020 September 1999 Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs 05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER1999-09-13013 September 1999 Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)1999-09-0909 September 1999 Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy NOC-AE-000562, Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i)1999-08-31031 August 1999 Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i) ML20212A4351999-08-27027 August 1999 Discusses Investigation Rept OI-4-1999-009 Re Activites at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination Complaint. Allegation Not Substantiated.No Further Action Planned NOC-AE-000617, Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d)1999-08-26026 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d) ML20211J2511999-08-26026 August 1999 Discusses Proposed TS Change on Replacement SG Water Level Trip Setpoint for Plant,Units 1 & 2 NOC-AE-000585, Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-4811999-08-25025 August 1999 Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-481 ML20211F4421999-08-24024 August 1999 Forwards SE Authorizing Licensee 990513 Request for Relief RR-ENG-2-13,seeking Relief from ASME B&PV Code Section Xi,Exam Vessel shell-to-flange Welds for Second ISI Intervals ML20211F5031999-08-23023 August 1999 Forwards SE Authorizing Licensee 990315 Request for Relief RR-ENG-30,seeking Relief from ASME B&PV Code,Section Xi,Nde Requirements Applicable to Stp,Unit 2 SG Welds ML20212A4391999-08-17017 August 1999 Discusses Investigation Rept OI-4-1999-023 Re Activities at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination for Initiating Condition Report to Document Unauthorized Work Practices ML20210U1271999-08-16016 August 1999 Forwards Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607-10.No Violations Noted.Corrective Action Program Was Reviewed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams NOC-AE-000603, Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6)1999-07-29029 July 1999 Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6) NOC-AE-000470, Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl1999-07-28028 July 1999 Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl NOC-AE-000599, Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr1999-07-28028 July 1999 Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr NOC-AE-000589, Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/20001999-07-26026 July 1999 Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000 ML20210F3851999-07-26026 July 1999 Forwards Exam Repts 50-498/99-301 & 50-499/99-301 on 990706- 15.Exam Included Evaluation of 9 Applicants for SO Licenses & 8 Applicants for RO Licenses 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20212A4351999-08-27027 August 1999 Discusses Investigation Rept OI-4-1999-009 Re Activites at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination Complaint. Allegation Not Substantiated.No Further Action Planned ML20211J2511999-08-26026 August 1999 Discusses Proposed TS Change on Replacement SG Water Level Trip Setpoint for Plant,Units 1 & 2 ML20211F4421999-08-24024 August 1999 Forwards SE Authorizing Licensee 990513 Request for Relief RR-ENG-2-13,seeking Relief from ASME B&PV Code Section Xi,Exam Vessel shell-to-flange Welds for Second ISI Intervals ML20211F5031999-08-23023 August 1999 Forwards SE Authorizing Licensee 990315 Request for Relief RR-ENG-30,seeking Relief from ASME B&PV Code,Section Xi,Nde Requirements Applicable to Stp,Unit 2 SG Welds ML20212A4391999-08-17017 August 1999 Discusses Investigation Rept OI-4-1999-023 Re Activities at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination for Initiating Condition Report to Document Unauthorized Work Practices ML20210U1271999-08-16016 August 1999 Forwards Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607-10.No Violations Noted.Corrective Action Program Was Reviewed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210F3851999-07-26026 July 1999 Forwards Exam Repts 50-498/99-301 & 50-499/99-301 on 990706- 15.Exam Included Evaluation of 9 Applicants for SO Licenses & 8 Applicants for RO Licenses ML20210D9011999-07-23023 July 1999 Forwards Safety Evaluation Re Inservice Testing Plan Request for Relief RR-5 Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210C2111999-07-21021 July 1999 Forwards Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626.Two Severity Level IV Violations Occurred & Being Treated as Noncited Violations ML20209H9231999-07-16016 July 1999 Discusses South Texas Project,Units 1 & 2 Updated Response to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity. Staff Revised Info for Plant in Rvid & Being Released as Rvid Version 2 ML20207H6261999-07-0808 July 1999 Responds to Re 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546, Alternative Requirements for Qualification of VT-2 Exam Personnel,Section Xi,Division 1.Forwards SE ML20195J6731999-06-17017 June 1999 Responds to Re Request for Relief from ASME Code, Section Xi,Requirement to Perform VT-1 Visual Exam on Accessible Surfaces of RPV Flange Inserts (Bushings). Safety Evaluation Encl ML20195F7561999-06-10010 June 1999 Forwards Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515 at South Texas Project Electric Generating Station,Units 1 & 2.No Violations Were Identified ML20207H0031999-06-0909 June 1999 Discusses 990419 Meeting in Region IV Ofc Re South Texas Project EP Program Status,Including Initiatives in EP Program,Future Revs to EP & Dept Performance Indicators. Meeting Attendance List & Licensee Presentation Encl ML20195G3241999-06-0909 June 1999 Ack Receipt of Re Changes to Plant Emergency Plan Change Notice 18-2.No Violations of 10CFR50.54(q) Were Identified ML20207D7371999-05-28028 May 1999 Discusses Re Process for Reclassification of non- Risk Significant Components.Forwards Concerns & Cautions for Consideration Based on Limited Review of Reclassification Process Overview That Was Provided IR 05000498/19980151999-05-28028 May 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/98-15 & 50-499/98-15.Corrective Actions Reviewed & Found to Be Responsive to Issues Raised ML20207E1961999-05-25025 May 1999 Forwards Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Primary Focus of Insp to Review Operational Status of Emergency Preparedness Program ML20207A8771999-05-25025 May 1999 Forwards RAI Re Licensee 960213 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Plant,Units 1 & 2.Response Requested within 120 Days from Date of Ltr IR 05000498/19990061999-05-12012 May 1999 Submits Corrected First Page of Cover Ltr Re Insp Repts 50-498/99-06 & 50-499/99-06 Conducted on 990221-0403.Subj Line Was Corrected ML20206S3201999-05-12012 May 1999 Forwards Corrected First Page of Cover Ltr,Which Forwarded Insp Repts 50-498/99-06 & 50-499/99-06,issued on 990505. Subj Line Indicated on NOV Was Incorrect ML20206N5481999-05-11011 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Ra Gramm Will Be Section Chief for South Texas Project.Organization Chart Encl ML20206J4321999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key Encl for Info.Without Encl ML20206J4211999-05-0606 May 1999 Ack Receipt of in Response to & Insp Repts 50-498/99-04 & 50-499/99-04,confirming Commitments as Stated in 990225 Exit Meeting ML20206H6201999-05-0505 May 1999 Forwards Insp Repts 50-498/99-06 & 50-499/99-06 on 990221- 0403.Three Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20206H3811999-05-0505 May 1999 Responds to STP Nuclear Operating Co Which Provided Update to TS Bases Pages B 3/4 2-6.Revised TS Bases B 3/4 2-6 That NRC Staff Will Use to Update Copy of STP Bases Encl ML20206H2001999-05-0404 May 1999 Forwards Exemption from Requirements of 10CFR50.60, Acceptance Criteria for Fracture Prevention Measures for Lightwater Nuclear Power Reactors for Normal Operation ML20206B6091999-04-22022 April 1999 Forwards Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted ML20206B3281999-04-22022 April 1999 Forwards Insp Repts 50-498/99-07 & 50-499/99-07 on 990405- 09.Insp Focused on Radiological Controls in Place During Unit Refueling Outage.Violations Identified Involving Failure to Follow Radiation Work Permit Instructions ML20205Q8151999-04-16016 April 1999 Forwards Request for Addl Info Re Proposed Amends on Operator Action for small-break-LOCA,dtd 980728.Response Requested within 45 Days of Ltr Date ML20205P5821999-04-15015 April 1999 Advises That Version of Application & Affidavit Dtd 990127, Executed by Ha Sepp,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended 1999-09-09
[Table view] |
See also: IR 05000498/1993001
Text
- - - _ _ - _
'
hS" "4 g 4 UNITEo ST ATEs
ab b NUCLEAR REGULATORY COMMISSION
. ' I O REGloN IV
8 611 HYAN PLAZA DRIVE, SUITE 1000
9, ,
FED 11 1993
Dockets: 50-498
50-499
Licenses: HPF-76
NPF-80
Houston Lighting & Power Company
ATTN: Donald P. Hall, Group
Vice President, Nuclear
P.O. Box 1700
Houston, Texas 77251
Gentlemen:
SUBJECT: NRC INSPECTION REPORT 50-498/93-01; 50-499/93-01 (NOTICE _0F
VIOLATION)
This refers to the inspection conducted by Mr. T. O. McKernon, and the
personnel identified in the enclosed report, of this office on January 11-15,
1993. The inspection included a review of activities authorized for your
South Texas Project, Units 1 and 2, facility. A'. the conclusion of the
inspection, the findings were discussed with you and those members of your
staff' identified in the enclosed report.
Areas examined during the inspection included an assessment of your licensed
operator requalification program. Within this area, the inspection consisted
of selective examination of procedures and representative records, interviews
with personnel, and observation of activities in progress.
Based on the results of this inspection, certain licensed activities appeared
to be in violation of NRC requirements, as specified iei the enclosed Notice of
Violation (Notice). The violation is of concern because the failure to have a
formal approved training plan is inconsistent with a systems approach to
trainin9
It was also identified that an individual entered the radiological control
area without the prerequisite dosimetry and this was in violation of your
Technical Specifications, Section 6.11 for failure to follow-procedures. This
violation is not being cited because the criteria in paragraph VII.B.2 of
Appendix C to 10 CFR 2 of the NRC's " Rules of Practice," were satisfied. This
violation was an isolated occurrence and the licensee staff took prompt and
effective actions to correct the problem.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response. In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
9302220076 930211
PDR
(l I l
(' '
ADOCK 05000498 b/
G _PDR ,
_ _ _ - _ _ _ _ _ _ _ -
~ _
';
. ..- :..' ,
j
.-
0
2- ;
Houston Lighting & Power Company-
_
-
<
>
._
inspections, the NRC will determine whether further NRC enforcement action'is.
-
necessary to ensure compliance with NRC regulatory requirements._ ;
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy _ of
-
this letter and its enclosures will--be placed in:the:NRC Public- Document Room; ;
The responses directed by this. letter and the enclosed-Notice are not subject _ -
-
,
to the clearance procedures of the Office of Management and Budget, as-
required by the Paperwork Reduction Act of-1980, Pub. .L. No.96.511.
"
Should you have any ' questions concerning this inspection, we will be pleased .j
'
to discuss them with you.
-
Samuel J. Col ins,. Director "
= Division of Reactor Safety
- Enclosures:-
1. Appendix A - Not' ice of Violation
2. Appendix B - NRC Inspection Report >
50-498/93-01 w/ Attachments- '
50-499/93401 w/ Attachments-
cc w/ enclosures:
- Houston Lighting _& Power. Company =
ATTH:' William J. Jump, Manager
Nuclear Licenstag
P.O. Box 289
Wadsworth,: Teas 77483 .
n
City of.-Austin
Electric Utility Department e;
ATTN:J. C. Lanier/M.-B.-Lee-
= P.O. Box 1088
Austin, Texas: 78767
'
-' City Public Service Board
'
'
ATTN: R. J. Costello/M. T.;Hardt; ,
P.O.' Box 1771
- San Antonio, Texas -78296-
'
4
k
,, 1
,
e ,, .- e =-y ,ow-- p , , ,%, y -- yv-. - e y- =.
___. ._
.
.. .. .. .
_.
e
1
( .. <
4
Houston Lighting & Power Company -3-
Newman & Holtzinger, P. C.
ATTN: Jack R. Newman, Esq.
1615 L Street, NW
Washington, D.C. 20036
Central Power and Light Company
ATTN: D. E. Ward /T. M. Puckett
P.O. Box 2121
Corpus Christi, Texas 78403
INP0
Records Center
1100 Circle 75 Parkway
Atlanta, Georgia 30339-3064
Mr. Joseph M. Hendrie
50 Bellport Lane
Bellport, New York 11713
Bureau of Radiation Control
State of Texas
1101 West 49th Street l
Austin, Texas 78756
Judge, Matagorda County
Matagorda County Courthouse
1700 Seventh Street
Bay City, Texas 77414
Licensing Representative
Houston Lighting & Power Company
Suite 610
Three Metro Center
Bethesda, Maryland 20814
Houston Lighting & Power Company
ATlN: Rufus S. Scott, Associate
General Counsel
P.O. Box 61867
Houston, Texas 77208
l
l
.
_..___m.-__.____m__.__.._..________ __ _
_ - - _ _ _ _ - _ _ _ _
'
.. .
Houston Lighting & Power Company -4-
bec to DMB (IE01) - DRS
bec distrib. by RIV:
J. L. Milhoan Resident inspector
DRP Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System
DRSS-flPS RIV file
Project Engineer (DRP/D) R. Bachmann, 0GC, MS: 15-B-18
DRS R1 C:0LS
Rll C:0LS Rill C:ULS
RV C:0LS
-
Section Chief (DRP/TSS)
T. McKernon J. Pellet
R. Lantz RV D:DRS
Rlll D:DRS R. Gallo MS: 10-D-22
Rll D:DRS B. Hughes MS: 10-D-22
RI D:DRS M. Biamonte MS: 10-D-24
B. Boger, HfB MS: 10-M-5 J. Wermiel, MS: 10-0-24
B. Murray
RIV:0S:RE* RE:0S* C:0S* 0:DRP* DRSS:C:FIPS
TMcKernon/cjg Rtantz JLPellet ABBeach BMurrayD
/ _/93 / /93 /_ /93
_
/ /93 TMO/93
-
0:DRS d
SJCollins d
1/B /93
__-__ - _--- _ - __
- - - - -
.
.
.
.. .
. ..
, e
Houston Lighting & Power Company -4-
[bec;to=DMB'(IE01)..-DRSS
bec distrib, by RIV:
J. L. Milhoan Resident Inspector
DRP Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System
DRSS-FIPS RIV File
Project Engineer (DRP/D) R. Bachmann, OGC, MS: 15-B-1B
DRS RI C:0LS
Rll C:0LS Rlli C:0LS
Section Chief (DRP/TSS) RV C:0LS
T. McKernon J. Pellet
R. Lantz RV D:DRS
Rill D:DRS R. Gallo MS: 10-0-22
Ril D:DRS B. Hughes MS: 10-D-22
R1 0:DRS M. Blamonte MS: 10-D-24
B. Boger, HFB MS: 10-H-5 J. Wermt(1, MS: 10-D-24
B. Murray
.
RIV:05:RE* RE:0S* C:0S* D:DRP* DRSS:C:FIPS
TMcKernon/cjg RLantz JLPellet ABBeach BMurrayk
/ /93 / /93 / /93 / /93 YM()/93 -
0:DRS(d,
SJColl1ns[
1/[(/93