Category:CORRESPONDENCE-LETTERS
MONTHYEARNOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested1999-10-21021 October 1999 Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan1999-10-20020 October 1999 Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)1999-10-19019 October 1999 Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) ML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds 05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER1999-10-12012 October 1999 Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule1999-10-12012 October 1999 Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future1999-10-0707 October 1999 Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment1999-09-30030 September 1999 Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr1999-09-30030 September 1999 Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr1999-09-28028 September 1999 Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 19971999-09-21021 September 1999 Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl1999-09-21021 September 1999 Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P1999-09-21021 September 1999 Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-09-20020 September 1999 Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs 05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER1999-09-13013 September 1999 Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)1999-09-0909 September 1999 Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy NOC-AE-000562, Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i)1999-08-31031 August 1999 Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i) ML20212A4351999-08-27027 August 1999 Discusses Investigation Rept OI-4-1999-009 Re Activites at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination Complaint. Allegation Not Substantiated.No Further Action Planned NOC-AE-000617, Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d)1999-08-26026 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d) ML20211J2511999-08-26026 August 1999 Discusses Proposed TS Change on Replacement SG Water Level Trip Setpoint for Plant,Units 1 & 2 NOC-AE-000585, Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-4811999-08-25025 August 1999 Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-481 ML20211F4421999-08-24024 August 1999 Forwards SE Authorizing Licensee 990513 Request for Relief RR-ENG-2-13,seeking Relief from ASME B&PV Code Section Xi,Exam Vessel shell-to-flange Welds for Second ISI Intervals ML20211F5031999-08-23023 August 1999 Forwards SE Authorizing Licensee 990315 Request for Relief RR-ENG-30,seeking Relief from ASME B&PV Code,Section Xi,Nde Requirements Applicable to Stp,Unit 2 SG Welds ML20212A4391999-08-17017 August 1999 Discusses Investigation Rept OI-4-1999-023 Re Activities at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination for Initiating Condition Report to Document Unauthorized Work Practices ML20210U1271999-08-16016 August 1999 Forwards Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607-10.No Violations Noted.Corrective Action Program Was Reviewed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams NOC-AE-000603, Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6)1999-07-29029 July 1999 Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6) NOC-AE-000470, Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl1999-07-28028 July 1999 Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl NOC-AE-000599, Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr1999-07-28028 July 1999 Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr NOC-AE-000589, Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/20001999-07-26026 July 1999 Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000 ML20210F3851999-07-26026 July 1999 Forwards Exam Repts 50-498/99-301 & 50-499/99-301 on 990706- 15.Exam Included Evaluation of 9 Applicants for SO Licenses & 8 Applicants for RO Licenses 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20212A4351999-08-27027 August 1999 Discusses Investigation Rept OI-4-1999-009 Re Activites at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination Complaint. Allegation Not Substantiated.No Further Action Planned ML20211J2511999-08-26026 August 1999 Discusses Proposed TS Change on Replacement SG Water Level Trip Setpoint for Plant,Units 1 & 2 ML20211F4421999-08-24024 August 1999 Forwards SE Authorizing Licensee 990513 Request for Relief RR-ENG-2-13,seeking Relief from ASME B&PV Code Section Xi,Exam Vessel shell-to-flange Welds for Second ISI Intervals ML20211F5031999-08-23023 August 1999 Forwards SE Authorizing Licensee 990315 Request for Relief RR-ENG-30,seeking Relief from ASME B&PV Code,Section Xi,Nde Requirements Applicable to Stp,Unit 2 SG Welds ML20212A4391999-08-17017 August 1999 Discusses Investigation Rept OI-4-1999-023 Re Activities at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination for Initiating Condition Report to Document Unauthorized Work Practices ML20210U1271999-08-16016 August 1999 Forwards Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607-10.No Violations Noted.Corrective Action Program Was Reviewed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210F3851999-07-26026 July 1999 Forwards Exam Repts 50-498/99-301 & 50-499/99-301 on 990706- 15.Exam Included Evaluation of 9 Applicants for SO Licenses & 8 Applicants for RO Licenses ML20210D9011999-07-23023 July 1999 Forwards Safety Evaluation Re Inservice Testing Plan Request for Relief RR-5 Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210C2111999-07-21021 July 1999 Forwards Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626.Two Severity Level IV Violations Occurred & Being Treated as Noncited Violations ML20209H9231999-07-16016 July 1999 Discusses South Texas Project,Units 1 & 2 Updated Response to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity. Staff Revised Info for Plant in Rvid & Being Released as Rvid Version 2 ML20207H6261999-07-0808 July 1999 Responds to Re 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546, Alternative Requirements for Qualification of VT-2 Exam Personnel,Section Xi,Division 1.Forwards SE ML20195J6731999-06-17017 June 1999 Responds to Re Request for Relief from ASME Code, Section Xi,Requirement to Perform VT-1 Visual Exam on Accessible Surfaces of RPV Flange Inserts (Bushings). Safety Evaluation Encl ML20195F7561999-06-10010 June 1999 Forwards Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515 at South Texas Project Electric Generating Station,Units 1 & 2.No Violations Were Identified ML20207H0031999-06-0909 June 1999 Discusses 990419 Meeting in Region IV Ofc Re South Texas Project EP Program Status,Including Initiatives in EP Program,Future Revs to EP & Dept Performance Indicators. Meeting Attendance List & Licensee Presentation Encl ML20195G3241999-06-0909 June 1999 Ack Receipt of Re Changes to Plant Emergency Plan Change Notice 18-2.No Violations of 10CFR50.54(q) Were Identified ML20207D7371999-05-28028 May 1999 Discusses Re Process for Reclassification of non- Risk Significant Components.Forwards Concerns & Cautions for Consideration Based on Limited Review of Reclassification Process Overview That Was Provided IR 05000498/19980151999-05-28028 May 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/98-15 & 50-499/98-15.Corrective Actions Reviewed & Found to Be Responsive to Issues Raised ML20207E1961999-05-25025 May 1999 Forwards Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Primary Focus of Insp to Review Operational Status of Emergency Preparedness Program ML20207A8771999-05-25025 May 1999 Forwards RAI Re Licensee 960213 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Plant,Units 1 & 2.Response Requested within 120 Days from Date of Ltr IR 05000498/19990061999-05-12012 May 1999 Submits Corrected First Page of Cover Ltr Re Insp Repts 50-498/99-06 & 50-499/99-06 Conducted on 990221-0403.Subj Line Was Corrected ML20206S3201999-05-12012 May 1999 Forwards Corrected First Page of Cover Ltr,Which Forwarded Insp Repts 50-498/99-06 & 50-499/99-06,issued on 990505. Subj Line Indicated on NOV Was Incorrect ML20206N5481999-05-11011 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Ra Gramm Will Be Section Chief for South Texas Project.Organization Chart Encl ML20206J4321999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key Encl for Info.Without Encl ML20206J4211999-05-0606 May 1999 Ack Receipt of in Response to & Insp Repts 50-498/99-04 & 50-499/99-04,confirming Commitments as Stated in 990225 Exit Meeting ML20206H6201999-05-0505 May 1999 Forwards Insp Repts 50-498/99-06 & 50-499/99-06 on 990221- 0403.Three Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20206H3811999-05-0505 May 1999 Responds to STP Nuclear Operating Co Which Provided Update to TS Bases Pages B 3/4 2-6.Revised TS Bases B 3/4 2-6 That NRC Staff Will Use to Update Copy of STP Bases Encl ML20206H2001999-05-0404 May 1999 Forwards Exemption from Requirements of 10CFR50.60, Acceptance Criteria for Fracture Prevention Measures for Lightwater Nuclear Power Reactors for Normal Operation ML20206B6091999-04-22022 April 1999 Forwards Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted ML20206B3281999-04-22022 April 1999 Forwards Insp Repts 50-498/99-07 & 50-499/99-07 on 990405- 09.Insp Focused on Radiological Controls in Place During Unit Refueling Outage.Violations Identified Involving Failure to Follow Radiation Work Permit Instructions ML20205Q8151999-04-16016 April 1999 Forwards Request for Addl Info Re Proposed Amends on Operator Action for small-break-LOCA,dtd 980728.Response Requested within 45 Days of Ltr Date ML20205P5821999-04-15015 April 1999 Advises That Version of Application & Affidavit Dtd 990127, Executed by Ha Sepp,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended 1999-09-09
[Table view] |
Text
-
m .
UNITED STATES -
,' [gpfffug*\ NUCLEAR REGULATORY COMMISSION ,
.
I[ ,j RecioN iv -
f-[)fij/g!
'
o .
611 RYAN PLAZA DRtVE, SUITE 400 4 AR LINGTON, T E XAS 76011 8064
... +
DEC 2 0 Eg3 Dockets: 50-498 50-499 Licenses: NPF-76 '
NPF-80 Houston Lighting & Power Company ATTN: William T. Cottle, Group
'
Vice President, Nucitar P.O. Box 289 Wadsworth, Texas 77483
!
SUBJECT: NRC INSPECTION REPCRT 50-498/93-27; 50-499/93-27 Thank you for your letter of November 19, 1993, in response to our ,
letter dated September 16, 1993, in which you were requested to respond to the negative findings identified in the NRC Inspection Report 50-498/93-27; 50-499/93-27. We have reviewed your reply and find it responsive to the concerns raised in our letter. We will review the implementation of your stated actions during a future inspectio
Sincerely, (:
/
Samuel ollins, Directo Division , Reactor Safety cc:
Houston Lighting & Power Company ATTN: James J. Sheppard, General Manager Nuclear Licensing P.O. Box 289 Wadsworth, Texas 77483
'
280005 9312300015 931220 i ;
PDR ADDCK 05000498 I O PDR l _I
.
_ _ _ _ _ _
-
Houston. Lighting and Power Company -2-City of Austin Electric Utility Department ATTN: J. C. Lanier/M. B. Lee 721 Barton Springs Road Austin, Texas 78704 City Public Service Board ATTN: K. J. Fiedler/M. T. Hardt '
P.O. Box 1771 '
San Antonio, Texas 78296 Newman & Holtzinger, P. ,
ATTN: Jack R. Newman, Es ; 1 1615 L Street, NW Washington, D.C. 20036 Central Power and Light Company ;
ATTN: G. E. Vaughn/T. M. Puckett P.O. Box 2121 i Corpus Christi, Texas 78403 i
.
INP0 i Records Center 700 Galleria Parkway li Atlanta, Georgia 30339-5957 Mr. Joseph M. Hendrie 50 Bellport Lane Bellport, New York 11713 Bureau of Radiation Control State of Texas 1100 West 49th Street Austin, Texas 78756 Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street Bay City, Texas 77414 Licensing Representative Houston Lighting & Power Company Suite 610 Three Metro Center Bethesda, Maryland 20814
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
.
Houston Lighting and Power Company -3- '
Houston Lighting & Power Cr spany ATTN: Rufus S. Scott, A .ociate General Counsel P.O. Box 61867 Houston, Texas 77208
.
,
.
f Houston Lighting and Power Company -4-
'
-;
!
bec to DMB (IE01) ,
bec distrib. by RIV:
J. L. Milhoan Resident Inspector Section Chief (DRP/A) Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System DRSS-FIPS ,
RIV File .
Project Engineer (DRP/A)
R. Bachmann, OGC, MS: 15-B-18 Section Chief (DRP/TSS) ,
D. Powers L. Ellershaw
,
f P
RIV: RI :P',* C:MS* DD:DRS n / D:DRPn [ D:DRSd LEEllershaw DAPowers ATHowell ABBeach SJColliks
/ /93 / /93 /)/2993 ff/13 /93 /7 /10 /93
,
,
.. . .. . . . - .
_
Houston Lighting and Power Company -4-bec to DMB (IE01)
bec distrib. by RIV:
J. L. Milhoan Resident Inspector Section Chief (DRP/A) Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System DRSS-FIPS RIV File Project Engineer (DRP/A)
R. Bachmann, OGC, MS: 15-B-18 Section Chief (DRP/TSS)
D. Powers L. Ellershaw
I i
RIV:RI:MS* C:MS* DD:DRS f, ,/ D:DRPn g D:DR$d, LEE 11ershaw DAPowers ATHowell ABBeachfF SJColl[
/ /93 / /93 /)/2993 9 [13 /93 M /20/93
l
o
. ,
12/16/93 09:02 001
.
The Light c" e map a ny South Tczas Project Electric Geocrating Station P. O. Box 289 Wadsworth,Tewas 77483 Houston L1 5 h'ia5 & P""
Post-R" brand tax transmittal memo 7671 November 19, 1993 Sfu/' 4,d , y s " "/Sh M err ( I ST-HL-AE-4630
g3 c" jj p File No.: G02.04.01
a.p / ) 972'7.706- 1OCFR50
"" *f/ 7 f o o [.27 f ["# aucAcar newua.acory comma.ssion Attention: Document Control Desk wachington, DC 20555 South Texas Project Units 1 and 2 Docket Nois. STN 50-498; STN 50-499 Response To Inspection Report (IR) 50-498/93-27; 50 499/93-27 Reliability and Operability of Satety-Related Check Valves liouston T.ighting and Power Company (HL&P) submits the encloced attachment as the response to the negative inspection findinge in the Results section of Inspection Report listed (IR) 50-499/93-27; 50-499/93-27, conducted August ~23-27,(STPEGS), 1993 at the South Texas Project Electric Generating Station Units 1 and 2. The areas examined during the inspection dealt with the STPEGS program for assuring the the effectiveness of reliability and operability of safety-rclated check valve Should you have any questions on this subject, please contact 7'7 Mr. Ray Pate at (512) 972-7787 or me at (512) 972-878 /
/
f' /- .
...
-
/
r .
&/
M. cl on Mge ,../
,
,'
Vi et4 Pres',de-
,
Nuclear 4nc neeriig I
.
HRP/eg b . . .s~ l Attachment- Response Lu IR 93-27 Weaknessoa
-
.
.
....:.,,a % .a. v,o. e,,,ju, rioieri m a w r.,o n<s..u or ,,,.- ru na
.i1 , , . .
(/ *? "I
/ vv(,U 9 n 9Gfl/~7 J
//2
'
s 7. .-
[ ,. , -12/16/93 '09:02 '002
.
p,.*
c
.
'
,
Housam T.lghting Ar Pwer Company ST HT. AF.-4630 South Texas Project Electric Generating Station File No.: G02.04.01 Page 2
,
C'
Regional Administrator, Region IV Rufus S. Scott U. .S. Nuclear Regulatory Commission Associate General Counsel 611 Ryan Plaza Drive, Suite 400 Houston Lighting & Power Company :
Arlington, TX 76011 P. O. Box 61867 Houston, TX 77208 Lawrence E. Kokajko Project Manager U. S. Nuclear Regulatory Conunission Institute of Nuclear Power Washington, DC 20555 13H15 Operations - Records Center !
700 Galleria Parkway David P. Loveless Atlanta, GA 30339-5957 Sr. Resident Tnspector c/o U. S. Nuclear Regulatory Com Dr. Joseph M. Hendrie P. O. Box 910 50 Dellport Lane Bay City, TX 77404-910 Bellport, NY 11713 .,
6 Newman, Raquire K. Lacker Newman & Holtzinger, P.C., STE 1000 Bureau of Radiation Control t 1015 L Street, Texas Department of Health i Washington, DC 20036 1100 West.49th Street Austin, TX 78756-3189 ,
K. J. Fiedler/M. T. Hardt *
City Public Service C. Nuclear Regulatory Conu P. O. Dox 1771 Attn: Document Control Deck San Antonio, TX 78296 Washington, i C. Lanier/M. B. Lee City of Austin Electric Utility Department 721 Darton Springs Road Aust.in. TX 70704 G. E. Vaughn/T. M. Puckett Central Power and Light Company P. O. Box 2121 Corpus Christi, TX 7840T
$
!
>
t i
(
' !: 1\41 %I , Vi }
c7 .. . .
-
h , , . .j: 12/16/93 09:03 -00 T
'
- P t ST-HL-AE-4630 '
Page 1 of 3
ATTACHMENT
.
RESPONSE TO INSPECTION REPORT 93-27 WEAKNESSES *
'i "A formal check valve program did not exist, but one was :
being developed'(section 2.2).-
Ilouston Lighting and Power Company (ITL&P)' has developed . ,
procedure OPEP01-ZA-0003, check Valve Reliability Progra l This procedure was approved on October 29, 1993'and became effective on November 01, 1993. This program document -
includes the following key elements: '
- Program scope and objectives
- Delineates responsibilities and program interfaces
- Specifies tracking and trending methods ;
- Defines the roles of intrusive and non-intrusive testing
- Sets guidelines for including and excluding valves from '
the program
- Defines the Check valve Index and Database and their >
scope l "There was no formal or documented coordination established between the check valve program coordinator and other groups whose activities could affect the check valve program (section 2.2)."
HL&P identified that procedure OPGP03-ZE-0031, Design Change ImplemenLation, did not reference Lhe Check Valve j Inde The Design Change Checklint, form OPGP03-ZE-0031-1, of procedure OPGP03-ZE-0031, has been revised and now lists the procedure OPSP11-ZE-0001, Check Valve Inspection Program, in the Program Impact section of the form so that design changes are reviewed for potential .i check valve programmatic impact . "The identity of check valve program valves was maintained in a data base that was not named, or approved >
(Section 2.2)."
The Check Valve Index, available under necords Management "
System (RMS) file.: Prefix: INVN FILE #:Z1514, as referenced in OPSP11-ZE-0001, Check valve Inspection '. ;
Program, is the controlled listing of the valves in the progra There were several valves which needed to be I added to the indices. The valves were added and the !
indices updated and approved on October 29,'1993. The i check valve Database that was reviewed by the inspectors li n unvi t.t s as
~
j
- 12/16/93 109:03 004=
g ,-
-
i{
l ST-ML-AE-4630 . _
Page 2 of 3 ,;
l
.!
was under development. Plant Engineering Department (PED) l plans to continue development and maintain the database as' '
a working database. The minimum scope of the database ;
'
will be defined in Check Valve Inspection Program, exi clearly identified as a working database and not.as a proceduralized document. The database will include all:
the valves in the check valve Inspection Program and a group of valves outside the scope of the program which are being monitored for repeat maintenance and failure Inspections may be performed on valves in this group'in j conjunction with corrective maintenance activitie . " Errors pertaining to inspection frequencies axisted between the Unit 1 and Unit 2 check valve data bases (section 2.2)."
The Check valve Index is the controlled 31st of the valves ;
in the inspection program and their respective inspection ,
frequencie There are no inconsistencies between Unit 1 and Unit 2 indices. The database reviewed by-the inspectors was under developmen ' "A check valve monitoring activity'(1.e., non-intrusive +
examination methods) had been established, but not *
implemented (section 2.2)." q
'
The non-intrusive check valve test equipment has been calibrated and is presently being utilized in the Unit PED has collected full acoustic alguatures on ten (10)
valvns tn dat . "A lack of conservatism in engineering judgement and an apparent imprecision in the input data may have resulted in an inaccurate determination of those check valves most vulnerable to structural deterioration (Section 2.3)." (
The observations are technically correct, however, D Paul Tullia, a nationally recognized check valve expert from Utah _ State UniversiLy W.ater Research Laboratory, states "measuremento of the actual parts in service obviously provide the most reliable information regarding actual wear rates. Whenever practically possible, this data should be used to refine future wear predictions and to determine suitable maintenance intervals." The inspector performed a detailed review on the analysis ui '.
the Feedwater check valve PED has seviewed the inspection histories of other check valves in the program, naned on this review of internal inr.pections, PFD has '
found no reason to question the conservatism of the Kalsi repor In neveral instancen. the inspection interval has i
a we w ,n
_
h n , , . ,- 22/16/93' 09:04 005' l E a
TC -
F.
'
!
SP-H[r-AE-4630 Page-3 of 3 l been lengthened beyond the original Kalsi recommendation due to lack of wear revealed by these inspections. While
there may be some non-conservative assumptions and imprecise data in the Kalsi report, the empirical resultu l'
have not challenged the report conclusions-and the risk of L future challenges is sufficiently low such thac performing
!~ the analysis again is not warrante : "The inspectors identified instances in which check valves l
~
failed local leak rate testing and the licensee apparently did not perform any root cause analysis (section 2.4)." ;
The five instances of LLRT' failure identified by the f inspectors were all Dual Disc check-Valves (DDCV).. A copy 1
,
of the HL&P modification to the DDCV was provided to the I
inspectors. The inspectors acknowledged that the DDCV l
'
design has been a problem in the industry for a number of '
years. A Station Problem Report (SPR), SPR # 890071, was
'
written in January, 1989 when Unit 2. valve CC0058 failed Lhe Local Lenk Rate Test (LLRT). One corrective action for the SPR was the hinge modification reviewed by the '
l inspectors. A root cause analysis of the failure was .
>
l performed, The root cause of this failure'was attributed l to * excessive clearance existing between the hinge and the
'
l hinge pin a31owing the valve disc to lift off the' seat."
~
,
The valve hinge design was the root cause. The design ,
,
problem was corrected by installing shims in the hinges to .
l ullow the valves to close and seal properly. The modification is installed when a valve is identified with
'
excessiva lenkag The Maintenance IIistories of the five subject valves have been corrected to clearly identify.the root cause of the ;
failure '
, Trending procedures, methodology, or criteria had not yet been established with respect to the check valvo program '
l (section 2.5)."
l-l IIL&P has addressed trending, methodology, and criteria in !
procedure OPEP01-ZA-0003, Check Valve Reliability Program f refe.renced in item :
.
!
l l
,
l L
l a wn nw