Notice of Violation from Insp on 850506-0722.Violation Noted:Failure to Issue Permanent or Temporary Procedure Change Describing Lineup Through Which Diluted Reactor Coolant Water Transferred from Recycle Holdup Tanks
ML20133M986
Person / Time
Site: Byron, 05000506  Constellation icon.png
Issue date: 10/21/1985
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20133M971 List:
References
50-454-85-22, 50-455-85-20, NUDOCS 8510280345
Download: ML20133M986 (1)


Text

.- . - _- - - _ -- _

s

. . ,

i Appendix

,

NOTICE OF VIOLATION I

Commonwealth Edison Docket Nos. 50-454; 50-455

! As a result of the inspection conducted on May 6 through July 22, 1985, and in accordance with the General Policy and Procedures for NRC Enforcement Actions, I (10 CFR Part 2, Appendix C), the following violation was identified:

l 10 CFR 50, Appendix B, Criterion V requires that activities affecting quality i be prescribed by documented instructions, procedures, or drawing ,

Contrary to the above, no authorized pennament procedure or temporary procedural i change described a valve line-up through which diluted reactor coolant water was transferred from the recycle holdup tanks to the Unit 2 condensate pit sum As a result, the sump overflowed and the surrounding area was contaminate This is a Severity Level IV violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this

'

office within thirty days of the date of this Notice a written statement or

! explanation in reply, including for each item of noncompliance: (1) corrective i action taken and the results achieved; (2) corrective action to be taken to j avoid further noncompliance; and (3) the date when full compliance will be i

achieved. Consideration may be given to extending your response time for good 4 cause shown.

I l

he4/A P /, MJf Dated W$

,f/A. Hind, Director