Text
.-
.
-
_-
-
-
_ - _
-
s
.
.
,
i
Appendix
,
I
Commonwealth Edison
Docket Nos. 50-454; 50-455
!
As a result of the inspection conducted on May 6 through July 22, 1985, and in
accordance with the General Policy and Procedures for NRC Enforcement Actions,
I
(10 CFR Part 2, Appendix C), the following violation was identified:
l
10 CFR 50, Appendix B, Criterion V requires that activities affecting quality
i
be prescribed by documented instructions, procedures, or drawings.
Contrary to the above, no authorized pennament procedure or temporary procedural
change described a valve line-up through which diluted reactor coolant water was
,
i
transferred from the recycle holdup tanks to the Unit 2 condensate pit sump.
As a result, the sump overflowed and the surrounding area was contaminated.
This is a Severity Level IV violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this
office within thirty days of the date of this Notice a written statement or
'
!
explanation in reply, including for each item of noncompliance:
(1) corrective
i
action taken and the results achieved; (2) corrective action to be taken to
j
avoid further noncompliance; and (3) the date when full compliance will be
achieved. Consideration may be given to extending your response time for good
i
4
cause shown.
I
he4/A P /, MJf
W$
l
Dated
,f/A. Hind, Director
!
' Division of Radiation
{
Safety and Safeguards
l
)
l
1
e
1
.
J
l
i
!
8510280345 851021
,
ADOCK 05000454
i
O
!
-
= - . . - .
. .-
- - - - - - . - -. - - -
-
--