Monthly Operating Rept for Sept 1985
ML20138C040
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/30/1985
From: Bregni L, Lenart R
DETROIT EDISON CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NP850140, NUDOCS 8512120441
Download: ML20138C040 (4)


Text

- . -

  • OPERATING MTA REPORT DOCKET NO 50-341 UNIT FERMI-2 MTE 10-14-85 COMPLETED BY L.P. Bregni TELEPHONE (313) 586-6313 OPERATING STATUS REPORTING PERIOD September GROSS HOURS IN REPORTING PERIOD N/A
1. *
2. CURRENTLY AUTHORIZED POWER LEVEL (Wt) 165 MAX DEPEND CAPACITY (WeNet)

DESIGN ELECTRICAL RATING (We Net) 1150 57.5

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (We Net)
4. REASONS FOR RESTRICTION (IF ANY) Confirmatory Action Letter dated July 16, 1985 restricts power from exceeding 5% until authorized by NRC.

THIS MONTH YR ID DATE CUMULATIVE 445.0 1713.3 1713.3

5. NUMBER OF HOURS REACTOR WAS CRITICAL 0 0 0
6. REACIOR RESERVE SHUTDOWN HOURS O 0 0
7. HOURS GENERATOR ON LINE 0 0 0
8. UNIT RESERVE SHUTDOWN HOURS
9. GROSS THERMAL ENERGY GENERATED (mm) 23,016.0 85,514.0 85,514.0 0 0
10. GROSS ELECTRICAL ENERGY GENERATED (mm) Q 0 0 0 11.- NET ELECTRICAL ENERGY GENERATED (WH)
12. REACTOR SERVICE FACTOR N/A N/A N/A
13. REACTOR AVAILABILITY FACTOR N/A N/A N/A
14. UNIT SERVICE FACTOR N/A N/A N/A
15. UNIT AVAILABILITY FACTOR N/A N/A N/A
16. UNIT CAPACITY FACTOR (Using MDC) N/A N/A N/A
17. UNIT CAPACITY FACTOR (Using Design We) N/A N/A N/A
18. UNIT FORCED OUTAGE RATE N/A N/A N/A
19. SHUTDOWNS SCHEDULED OVER NEXT 6 IONTHS (TYPE, DATE, AND DURATION OF EACH)

Outage for scheduled modifications October / November, 1985.

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP N/A
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/21/85 INITIAL ELECTRICITY 11/85 COMMERCIAL OPERATION 11/85
  • To be determined. 8512120441 850930 E PDR ADOCK 05000341 R PDR )[)j
  • AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-341 l
UNIT FERMI-2 1

DATE 10-14-85 '

COMPLETED BY L.P. Bregni TELEPHONE (313) 586-5313 MONTH September, 1985 4

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL J

(MWe-Net) (MWe-Net) l 1 0 17 0 0 18 0 2

0 19 0 3

4 0 20 0 0 21 0 5

f 6 0 22 0 7 0 23 0 8 0 24 0 0 25 0 9

0 26 0 10 ,

11 0 27 0 0 28 0 12 0 29 0 l 13 0 30 0 l 14-0 31 N/A-15 16 0 1

a Y

J I

3 w - - , - - . _ , , ,, __ _o ,--, , . _,, _ , . - , , _ _ ,

,,,,m-m_ ,,,.,,_yn -. m--- , - - - , ,, , , , . , , ,

DCCKET NO. 50-341 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FERMI-2 DATE 10-14-85 (

COMPLETED BY L.P. Bregni REj) ORT MONTH September. 1985 TELEPHONE (313) 586.5313

n~ow l

['

m m al 9

mom,2 4l 9"l a ;

9l58"p!wxI w

m m n z E" e d l.

l

  • .i om .

o E ,.

en no ,. mma no. .

NO l DATE  ! l3 'l EEl C*l f
E$$E l CORRECTIVE ACTIONS / COMMENTS l l

-  ! l 0" l

    • l l UP "o?

. i  ; i i i l l l

l l l l l l  !

l l l .

': l l l l l 247.15! 3 l RPV High Pressure Trip from Group 1 l

,! 1  ! 850903 l F A l

' Isolation - LER 85-059, Report Date l

! l l l l

! l October 3, 1985 l l l l l l l l l l l l l l l l l l

!  ! l l A 3 l West Bypass Valve Module Failure - l l 2 l 850927 l F l 27.85l l l LER 85-066, Report Due October 27, 1985  ;

8 8 l l l l l l l l i  !  !  !  !

l l l l l l l l l l l l l  !  ! l l l l l l l l l

! l l l l l l l l l l l l l l l l l l l l l  !  ! l l l l l  !

l l l l l l l

, l . .

i._ , .

, (1) REASONS E. OPERATOR TRAINING AND LICENSE EXAMINATION A. EQUIPMENT FAILURE (EXPLAIN)

MAINT OR TEST F. ADMINISTRATIVE B. '

G. OPERATIONAL ERxG.. (EXPLAIN)

C. REFUELING H. OTHER (EXPLAIN)

D. REGULATORY RESTRICTION (2) MD 1 MANUAL

3. AUTOMATIC SCRAM 2.

~

MANUAL SCRAM

4. OTHER (EXPLAIN)

7-e RMid::"

U Detroit r.,,m y Edison FR61933 october 14, 1985 o e,e;r,,,

NP850140 U. S. Nuclear Regulatory Commission Attention: Director, Office of Resource Management Washington, D.C. 20555 Gentlemen:

Reference:

Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43

Subject:

Monthly Operating Status Report for Seotenbet. 1985 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for September, 1985.

This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact us.

Sincerely,

>w R. S. Lenart Plant Manager Enclosure cc: Mr. P. h. Byron USNRC, Document Control Desk Mr. M. D. Lynch Washington, D.C. 20555 Regional Administrator Mr. Dennis Hahn USNRC Region III Division of Radiological Health 799 Roosevelt Road Michigan Department of Health Glen Ellyn, IL 60137 3500 North Logan P.O. Box 30033 Lansing, MI 48909 Mr. Jon Eckert Monroe Office of Civil Preparedness 965 South Raisinville Road I Monroe, MI 48161 b I l

,