Requests Addl Info & Clarification Re 920609 Application for Amend to License R-115 for Univ of Il Advanced Triga Research Reactor
ML20141M435
Person / Time
Site: University of Illinois
Issue date: 08/10/1992
From: Alexander Adams
Office of Nuclear Reactor Regulation
To: Hang D
MASSACHUSETTS INSTITUTE OF TECHNOLOGY, CAMBRIDGE
References
TAC-M84011, NUDOCS 9208140086
Download: ML20141M435 (4)


Text

' '

[  : - August 10, 1992

  • .4 . .
Docket No. 50-151
. Dr. Daniel F. Hang,' Director

- Nuclear- Reactor Laboratory

- Department of Nuclear Engineering e 214 Nuclear Engineering Laboratory 6

- 103: South-Goodwin Avenue-Urbana,-Illinois 61801-2984

Dear:

Dr. Hang:- .

SUBJECT:

. REQUEST FOR ADDITIONAL INFORMATION (TAC NO. H84011)

@' 4 - We are continuing-our review of your application for amendment of Facility Operating License No. R-115 for the University of Illinois Advanced TRIGA

.Research Reactor which you submitted on June 9, 1992. During our review of n yourcappilcation', . questions.have arisen for which we require additional

information
and clarification. Please: provide responses to the enclosed-
Request)for Additional Information
within 90 days of the date of this letter.

Following receipt ofz the additional information, we will continue our  ;

evaluation of your application. If you have any questions regarding this i g review, please contact me at (301) 504-1127. J

, In accordance with 10 CFR 50.30fb), your response must be executed in a signed original under _ oath or affirmatton.

1.This requirement affects'nine or. fewer respondents and, therefore,'is not subject;to<0ffice of-Management and Budget review und w P. L.-96-511.

[

, Sincerely 7 ,

.originalsignedbyf Alex 9 der ' Adams, Jr.,! Senior Project Manager - 9

u

'Non-vawer Reactors Decommissionicg and S,, Environmental Project Directorate

.Diviston of Reactor. Projects.- III/IV/V

, -Office of Nuclear Reactor Regulation N Enclosure #m i m. sAs stated' -

k.T cc w/enclosuresi

=See next page.- .

0

)

[ DISTRIBUTION:i . __

  • -(1517RAI.AA]

V- fsD Ekst W F W 151.SWeiss'

-EHylton-A" NRC & Locali FORs '

Q(cv, 1.PONP R/F;:  ? 'AAdams go

  • LBBoger '0GC' . -

1 ..

  • S -+

-ACRS(10).- Ln  ;

, . ~+ . '

&}A)

  • L,. 90t lPDNP: -
PDNPiD

% JE' on )AAda, b. SWeiss p . uu/ _ /92;  ; 08/tc>/92. 08/p/92

- 1 y.

920s14oos6 920eso j~DR;:ADoCK~05ooo1515

- Y' C'

  1. ~

i M" M .P-

' "'

  • l;.

1 m ,

PDR ru hi t

( .

V y ,_u. ,,,, , ,- , , , , ,, .

}__k _ -- 2 _;______ ____ _ _ -L '_L _ L ; ;_ _;_ ___

C UNITED STATES l0 }? "5-

, NUCLEAR REGULATORY COMMISSION

g. WASHINGTON, D.C. 20%5 fo
  • % ... August 10, 1992 Docket No. 50-151 Dr Daniel F. Hang,. Director Nuclear Reactor Laboratory Department of Nuclear Engiv nering 214 Nuclear Engineering LaL.,..ory 101 South Goodwin Avenue l'rbana,. Illinois 61801-2984

Dear Dr. Hang:

SUBJECT:

. REQUEST FOR ADDITIONAL INFORMATION (TAC NO. MS40ll)

We are continuing our review of your application for arendment of Facility Operating License No. R-115 for the University of Illit.ois Advanced TRIGA Research Reactar which you submitted on June 9, 1992. Durir.g.our review of your application, questions have arisen for which we require additional information and clarification. Please provide responses to the enclosed

-Request for Additional Information within 90 6ys of the date of this letter.

Following receipt-of the additional information, we will continue our evaluation of your applicatica. If you have any questions regarding this review, please contact me at (301) 504-1127.

( In accordance with 10 CFR 50.30(b), your response must be executed in a signed original under oath or affirmation.

L (

This requirement affects nine or fewer respondents and, therefore, is not subject to-Office of Management and Budget review under P. L.96-511.

Sincerely, hh$ct:0 w s Alexander Adams, Jr., Se Project Manager Non-Power Reactors, Decommissioning and Environmental Proji:ct Directorate Division of Reactor Projects - III/IV/V Office of huclear Reactor Regulation

Enclosure:

As stated-

~

cc w/ enclosures:

See next page-1 i

} Docket Nos. 50-151/356 University of Illinois CC; .

Honorable Jeffrey T. Markland City Hall-P. O. Box'219 Urbana,. Illinois 61801 Dr. Daniel Hang, Director taclear Reactor I.aboratory University of Illinois Urbana, Illinois 61801 lilinois Department of Nwlear Safety Manager, Office of Nuclear Facility Safety 1035 Outer Park Drive

- Springfield, - Illinois 62705 Mr. Richard L. Holm, Acting Reactor Supervisor

Department of Nuclear Engineering University of Illinois at Urbana Champaign-

-103 South Goodwin Avenue Urbana, I'linois 61801-2984

y ENCLOSURE REQUEST FOR ADDITIONAL INFORHATION UNIVERSITY OF ILLIN0IS ADVANCED TRIGA REACTOR DOCKET NO. 50-151

1. Your application refers to the verification and validation (V&V) process used by General Atomics (GA) to develop the software used in your proposed instrumentation and control (I&C) system. You state that you believe that the V&V process used by GA and reviewed by the NRC staff is transferable to the University of Illinois (U1) Advanced TRIGA I&C system. We agree with this assessment that the V&V is transferable.

However, there have been changes to the software since NRC reviewed the V&V plan. Please provide a description of the changes to the software that has occurred since our review of the V&V program and the V&V performed on these changes. Also please provide a description of the configuration management control used to control the various changes and distributions.

2. The I&C systems installed as replacements for existing systems have operated in parallel with the old systems that they were to replace.

This confirmed that the new system was operating satisfactorily prior to operation with the new system alone. Please confirm that you will operate the new I&C system in parallel with the existing to confirm proper operation and to gain experience with the new system. If you do not plan to operate the new I&C system in parallel, provide your detailed startup procedure for the new system. The procedure should include the methods that will validate the new system without parallel information from the old system.