ML20148T044

From kanterella
Revision as of 19:56, 22 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Change PC-01 to Rev 12 to Procedures OP-1903.067, Emergency Response Facility - Emergency Operations Facility (Eof)
ML20148T044
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 07/01/1997
From:
ENTERGY OPERATIONS, INC.
To:
References
NUDOCS 9707080377
Download: ML20148T044 (6)


Text

, -_ _ . . . ____.

I e

Arkansas Nuclear One - Administratise Senices Document Control Friday, June 27,1997 .

~ Iiocument Update Notification COPYHOLDER NO: 103 TO: NRC - WASHINGTON ADDRESS: DOC CNTRL DESK MAIL STOP PI-37 WASHINGTON DC 20555 DOCUMENTNO: OP-1903.067 TITLE: EMERGENCY RESPONSE FACILITY-EMERGENCY OPERATIONS FACILITY (EOF) ,

REVISION NO: 12-01-00 CHANGE NO: PC-01 i

) l SURIECT: PERMANENT CHANGE (PC) J

/ 2%

9707000377 970701 .lll{kkklll

((ll(({ll(({\\(({flli

lk PDR ADOCK 05000313 _

,, l PDR

ENTERGY OPERATIONS INCORPORATED i

ARKANSAS NUCLEAR ONE PROC / WORK PLAN NO. REV.

' TITLE: EMERGENCY RESPONSE FACILITY-EMERGENCY OPERATIONS FACILITY (EOF) 1903.067 12 EXP. DATE SAFETY-RELATED >

- - N/A BYES ONO i

l l CONTROLLED COPY # 'O l

"^oe ' or ' @NO l

","'" Self Check.

l 2 38 74  ;

l' 75 3 39 78 f 4 5

40 41 to 77 i

42 78 l

6 79 i

7 8

43 44 45 T.k Ihin 80 81

! 9 10 46 A 82 ec-1 11 47 M Cf 83 84 PC-1 j 12 48 85 d(

l 13 49 14 50 jg 86 87 1 15 51 52 E'I 88 l 16 i 17 53 18 54 .. ecause NObody's perfe l TIME j 19 55 VERIFIED BY DATE

^

20 56

~

21 57 i 22, 58 i 23 59

! 24 60 5 25 61 ,

i 26 62 l 27 63 28 64

)'

29 65 l 30 66 31 67 32 68 33 69 34 N'I 70 35 71 36 72 FORM NO. REV.

FORM TITLE:

1000.006A 45 LIST OF AFFECTED PAGES

f pnOCmoset PUWI NO. PROCEDUIUUWORK PUW TmE PAGE: 34 Of 88 1903.067 EMERGENCY RESPONSE FACILITY - EMER2ENCY Rn: 12 OPERATIONS FACluTY(EOF) CHANGE: PC-1

/ ' POSITION GUIDE F km Page 2 of 4 EOF SUPPORT SUPERINTENDENT

f. Ensure Task responsibilities under your position are assigned, using the Emergency Telephone Directory.

(1) Task F-1, Telecommunications Support (2) Task F-2, Purchasing & Procurement

g. Complete the EOF Staffing Board. Refer to the Computerized Notification System (CNS) printout to ascertain those ERO positions that are enroute.
h. Report current manpower status to the Support Manager.
1. Obtain Form 1903.067D " EOF Position Staffing Form", complete the required inforumtion and FAX the completed form to the TSC Support Superintendent at FAX Number 6622.
j. Obtain all necessary forms needed for your position from the file tray located on your table in the Command Room or the Emergency
  • % Kit located in the Command Room:

(1) Form 1903.067A (2) Form 1903.067B (3) Fonn 1903 - 067D (4) ERO Chronological Log

k. Maintain a chronological log of events pertaining to your position.
2. .On Going Actions
a. Refer to this procedure, Sections 6.1., 6.2, 6.3, 6.4, and 6.5, for a description on the EOF f acility and information relating to EOF activation criteria, EOF etaffing, EOF staff turnover and the Alternate EOF.
b. If a plant evacuation or exclusion area evacuation has occurred, then:

.* Maintain continuous accountability of those individuals working under y'our position that are remaining within or returning to the evacuated area.

  • Ensure that the OSC tracks any personr.el working under your position that are remaining within or returning to the evacuated area.

Procedure 1903.030, " Evacuation", may be referenced for definitions and/or instructions.

r~g-i

-v W

PRocJw0sut PLAslNo. Mt0CEDURENUORK PLAN Tm.E: PAGE: 52 of 88 1903 067 EMERGENCY RESPONSE FACluTY - EMER2 ENCY REV: 12 OPERATIONS FACIUTY(EOF) CHANGE: PC-1

/' \ POSITION GUIDE J k) Page 2 of 4 SUPPORT MANAGER

f. Ensure Task responsibilities under your position are assigned, i using_the Emergency Telephone Directory.

(1) Task J-1, EOF Notifications Communicator Contacted via the CNS. Contact TSC Support Superintendent (ext. 6602) to verify reporting status using the CNS printout.

(2) Task J-2, EOF Status Board Communicator Contacted via the -

CNS. Contact TSC Support Superintendent to verify reporting status using the CNS printout.

(3) Task J-3, EOF EAL Reviewer Contacted via the CNS. Contact TSC Support Superintendent to verify reporting status using the CNS printout.

(4) Task J-4, EOF Security Contacted by the TSC Support Superintendent. Contact TSC Support Superintendent to verify reporting status.

(5) Task J-5, EOF Administrative Services Contacted via the CNS.

Contact TSC Support Superintendent to verify reporting status using the CNS printout.

g. Refer to the Computerized Notification System (CNS) to ascertain those ERO positions that are enroute.

k h. Report current manpower status to the EOF Director. i l

l

1. Obtain all necessary forms needed for your position fr'om the file tray located on your table in the Command Room or the Emergency N% Kit located in the Command Room:

R (1) Form 1903.067A (2) Form 1903.067B (3) ERO Chronological Log

j. Maintain a chronological log of events pertaining to your position.

6 ,

2. On Going Actions '
a. Refer to this procedure, Sections 6.1., 6.2, 6.3, 6.4, and 6.5, for a description on the EOF facility and information relating to EOF activation criteria, EOF staffing, EOF staff turnover and the Alternate EOF.
b. If a plant evacuation or exclusion area evacuation has occurred, then:
  • Maintain continuous accour.tability of those individuals working under your position that are remaining within or returning to the evacuated area.

(

\_/

  • Ensure that the OSC tracks any personnel working under your position that are remaining within or returning to the evacuated area.

C. P Page 82 of 88 Page 1 of 3 0 1. Date and time of the status update: Date: Time

2. REAM Status Update Items (check as reviewed):

~

A. Current release rate, recent trend, prognosis. j

% 1. Is release source secure.

nO 2. Is release from plant secure. ,

N 3. Update EOFD if one or both'have been secure. I B. Verify Emergency Class (based on radiological conditions). J C. Off-site dose projection results (recent Follow-up Message). I D. Dose projection comparison with State, NRC models. I E. ANO Field Team survey results and comparison with RDACS.

F. State Health Department, EPA, DOE survey results.

G. Current and forecast meteorology (wind direction, shifts).

H. Status of off-site protective action implementation. l I. EOF habitability and protective action recommendations.

J. Personnel status, overexposures, contaminations, etc.

K. ,, EOF Radiation Protection Support Group staffing.

NOTES:

I i

, 3. Accident Assessment Manager Update Items (check as reviewed):

A. Reactor health, core cooling systems operational status.  ;

B. Containment status, current trends, prognosis.

C. Release path, estimated release duration, prognosis.

D. Critical parameter current status and trends.

E. Operational status, trends, forecast.

F. Verify Emergency Class (based on plant conditions).

G. Review of accident mitigation objectives, priorities, and strategies.

H. Status of engineering evaluations in-progress.

I. Review TSC requests (for EOF support) and status.

J. Core damage assessment (if applicable).

K. EOF Accident Assessment Group staffing.

NOTES:

O .

F ORM TITLE: FORM NO. REV.

EOF DIRECTOR STATUS UPDATE GUIDr: '1903.05m  ??, PC 4 l

m W

Page 84 af ts Page 3 of 3 l St l

! [\m,'/\* 6. Emergency Operations Facilities Director Update Items (check as reviewed):

A. Review current Dmergency Classification.

B. Review current overall accident mitigation objectives. y C. Summarize any significant items from TSC Director.

D. Summari.ze_any significant discussion / direction from NRC.

! E. Summarize any recent significant discussions with State.

- F. Review off-site protecti 7e actions in effect (or planned). )

A ', G. Is release source secure.

W H. Is release from plant secure.

l NOTES: l t I i .

7. Other Organization / Agency Update Itens (list as reviewed):

l A.

B.

C-l 1 D.

E.

[

8. Direct key EOF personnel to update their subordinates with applicable

\

information obtained in the status update.

9. Select the time of the next EOF Status Update and announce it in the EOF command center.
10. Conduct periodic updates with the TSC Director on. l
1) Status of Emergency Classification 1
2) Offsite protective measures recommended and the basis i

?) Significant changes )

4) Radiological conditions offsite I
5) Status of requests for assistance l
6) Long term impact of current course of in-plant actions NOTE Items on this list are suggested topics for routine updates. Items actually selected for update should be based on existing or projected conditions.

1 l

l l

O

( \-,) -

FORM TITLE: FORM NO. REV.

EOF DIRECTOR STATUS UPDATE GUIDE 1903.067B 12,PC4'

_