MONTHYEARML20217N3901999-10-25025 October 1999 Advises That Info Provided in & Affidavit Re Holtec Position Paper WS-115,rev 1,repts HI-87113, Rev 0,HI-87114,rev 0,HI-87102 Rev 0 & HI-87112,rev 0,marked Proprietary,Will Be Withheld from Public Disclosure ML20217L8591999-10-21021 October 1999 Discusses 990921 Request for Approval to Perform Alternative Testing as Part of Vermont Yankee Nuclear Power Station IST Program.Informs That Submittal Reviewed Against ASME Code Section XI Requirements & Forwards Safety Evaluation ML20217M1181999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217D9711999-10-13013 October 1999 Responds to Request That Information Titled Addl Info Re Cycle Specific SLMCPR for Vermont Yankee Cycle 21 Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station ML20217C1501999-10-0707 October 1999 Forwards Insp Rept 50-271/99-11 on 990809-27.No Violations Noted.Insp Focused on Effectiveness of Engineering Functions in Providing for Safe Operation of Plant BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20212J7891999-10-0404 October 1999 Informs That Licensee 980804,0628,29 & 990921 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Consider Subj GL to Be Closed for Plant ML20212J6501999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of VYNPS on 990913. No New Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues & Insp Plan Through Mar 2000 Encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-171999-09-28028 September 1999 Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 11999-09-21021 September 1999 Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing1999-09-21021 September 1999 Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested1999-09-21021 September 1999 Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal1999-09-20020 September 1999 Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal ML20212C1621999-09-17017 September 1999 Forwards Amend 175 to License DPR-28 & Safety Evaluation. Amend Revises TSs to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to Standby Liquid Control System BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-09-16016 September 1999 Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld1999-09-16016 September 1999 Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld ML20216F3171999-09-13013 September 1999 Forwards Insp Rept 50-271/99-06 on 990621-0801.One Violation Identified & Being Treated as Noncited Violation BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp1999-08-31031 August 1999 Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution1999-08-31031 August 1999 Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution ML20211G4791999-08-27027 August 1999 Forwards Notice of Withdrawal of 990420 Amend Request Re TS on Reloading & Unloading Sequence of Fuel in Reactor Core When All Fuel Removed from Core BVY-99-107, Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies1999-08-26026 August 1999 Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies ML20211E8841999-08-25025 August 1999 Requests That Licensee Provide bldg-specific Justification for Use of Method A.1 at Locations Where Amplification Significantly Exceeds 1.5 Limit Above 8 Hz ML20211E1371999-08-20020 August 1999 Forwards from J Bean to H Miller & FEMA Final Exercise Rept for 990427-29 Plume Exposure & Ingestion Pathway Exercise for Vermont Yankee Nuclear Power Station.No Deficiencies Noted.Areas Requiring C/A Identified ML20211H0851999-08-19019 August 1999 Forwards Insp Rept 50-271/99-12 on 990628-0711 & Nov. Violation Re Failure to Monitor Unavailability of Specific Sys,Structures & Components During Refueling Outage Did Not Allow Adequate Assessment of Maint Effectiveness BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered1999-08-19019 August 1999 Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-021999-08-18018 August 1999 Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 BVY-99-100, Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings1999-08-0202 August 1999 Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings ML20210M5791999-07-30030 July 1999 Responds to NRC 990726 Telcon Re Status of Resolution for USI A-46 Outliers.Written Summary,By Equipment Category, Listed ML20211E1701999-07-28028 July 1999 Forwards Copy of Final Exercise Rept for 990427-29,full- Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to VYNPS ML20210G5041999-07-27027 July 1999 Responds to NRC 990301 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Licensee Will Submit Info Re Proposed Sys Mod by 990916 ML20210J3031999-07-27027 July 1999 Submits Proposed Changes to Eals.Attachment 1 Provides Listing of Changes to EALs Along with Ref to Bases Documents Supporting Change ML20210G4271999-07-27027 July 1999 Forwards Testing Data & Associated Results for Fitness for Duty Program at Plant for 990101-0630 ML20216D7321999-07-26026 July 1999 Forwards Insp Rept 50-271/99-05 on 990510-0620.Two Viiolations Being Treated as Noncited Violations ML20209G2721999-07-14014 July 1999 Discusses Licensee Response to RAI Re GL 92-01,Rev 1,Suppl Suppl 1, Rv Structural Integrity, for Vermont Yankee Nuclear Power Station ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G6931999-07-14014 July 1999 Forwards Request for Addl Info Re Spent Fuel Storage Capacity Expansion ML20209G1531999-07-12012 July 1999 Discusses Util Setpoint Control Program Implementation Schedule,As Committed to in Licensee 990514 Response to Notice of Violation,Insp Rept 50-271/97-10 ML20196J2321999-06-30030 June 1999 Submits Input from Util Technical Staff Re Soil Disposal on-site Under 10CFR20.2002 & Expresses Interest in Pursuing Approval to Use Same Methodology (Implemented Through Util ODCM & Reported as Noted) If Possible ML20196J7421999-06-29029 June 1999 Informs NRC That Vygs Has Implemented Severe Accident Management,As Committed to in Licensee to NRC ML20209B6111999-06-29029 June 1999 Resubmits Summary of Vynp Commitments Page to Replace Original Page Submitted with Responding to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196J2431999-06-29029 June 1999 Informs That Author Received Call from NRR on Dirt Spreading Ltr & Questions Re Cover Ltr Statement Where Util Asks to Be Allowed to Dispose of Future Soil in Same Manner Provided Same Acceptance Criteria Met ML20209C3751999-06-28028 June 1999 Forwards non-proprietary Rev 16 to EPIP OP 3524, Emergency Actions to Ensure Initial Accountability & Security Response & Proprietary Rev 12 to EPIP OP 3531, Emergency Call-In Method. Proprietary Encl Withheld ML20209B5861999-06-28028 June 1999 Provides Alternative Y2K Readiness Status Described in Supplement 1 to GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure Rept Encl ML20196G5241999-06-22022 June 1999 Responds to Re Changes to Vermont Yankee Guard Training & Qualification Plan,Rev 8,Errata A.No NRC Approval Is Required.Encl Will Be Withheld from Public Disclosure Per 10CFR73.21 BVY-99-084, Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.7901999-06-18018 June 1999 Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.790 ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-171999-09-28028 September 1999 Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing1999-09-21021 September 1999 Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 11999-09-21021 September 1999 Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested1999-09-21021 September 1999 Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal1999-09-20020 September 1999 Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld1999-09-16016 September 1999 Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-09-16016 September 1999 Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp1999-08-31031 August 1999 Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution1999-08-31031 August 1999 Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution BVY-99-107, Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies1999-08-26026 August 1999 Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered1999-08-19019 August 1999 Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-021999-08-18018 August 1999 Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 BVY-99-100, Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings1999-08-0202 August 1999 Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings ML20210M5791999-07-30030 July 1999 Responds to NRC 990726 Telcon Re Status of Resolution for USI A-46 Outliers.Written Summary,By Equipment Category, Listed ML20211E1701999-07-28028 July 1999 Forwards Copy of Final Exercise Rept for 990427-29,full- Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to VYNPS ML20210G5041999-07-27027 July 1999 Responds to NRC 990301 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Licensee Will Submit Info Re Proposed Sys Mod by 990916 ML20210G4271999-07-27027 July 1999 Forwards Testing Data & Associated Results for Fitness for Duty Program at Plant for 990101-0630 ML20210J3031999-07-27027 July 1999 Submits Proposed Changes to Eals.Attachment 1 Provides Listing of Changes to EALs Along with Ref to Bases Documents Supporting Change ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G1531999-07-12012 July 1999 Discusses Util Setpoint Control Program Implementation Schedule,As Committed to in Licensee 990514 Response to Notice of Violation,Insp Rept 50-271/97-10 ML20196J2321999-06-30030 June 1999 Submits Input from Util Technical Staff Re Soil Disposal on-site Under 10CFR20.2002 & Expresses Interest in Pursuing Approval to Use Same Methodology (Implemented Through Util ODCM & Reported as Noted) If Possible ML20209B6111999-06-29029 June 1999 Resubmits Summary of Vynp Commitments Page to Replace Original Page Submitted with Responding to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196J7421999-06-29029 June 1999 Informs NRC That Vygs Has Implemented Severe Accident Management,As Committed to in Licensee to NRC ML20209C3751999-06-28028 June 1999 Forwards non-proprietary Rev 16 to EPIP OP 3524, Emergency Actions to Ensure Initial Accountability & Security Response & Proprietary Rev 12 to EPIP OP 3531, Emergency Call-In Method. Proprietary Encl Withheld ML20209B5861999-06-28028 June 1999 Provides Alternative Y2K Readiness Status Described in Supplement 1 to GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure Rept Encl BVY-99-084, Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.7901999-06-18018 June 1999 Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.790 ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML20195C5891999-05-27027 May 1999 Forwards Response to NRC 990301 RAI Re GL 96-05 Program at Vermont Yankee Nuclear Power Station ML20195D5341999-05-27027 May 1999 Forwards Description of Vermont Yankees Plans for Insp of & Mods to Certain Reactor Vessel Internals BVY-99-074, Forwards Application & Medical Certificate Required for Renewal of Jd Livingston,License OP-10049,RO License.Medical Certificate Withheld1999-05-26026 May 1999 Forwards Application & Medical Certificate Required for Renewal of Jd Livingston,License OP-10049,RO License.Medical Certificate Withheld ML20195B4081999-05-24024 May 1999 Withdraws Licensee Commitment,Contained in ,To Reinitiate ITS Project Following Completion of FSAR Accuracy Verification Project.Util Will Continue to Modify Current TS with Number of Improvements BVY-99-067, Informs That Bw Metcalf,License SOP-1761-9,has Retired from VYNPS & Will No Longer Require License.Nrc Is Requested to Terminate License1999-05-21021 May 1999 Informs That Bw Metcalf,License SOP-1761-9,has Retired from VYNPS & Will No Longer Require License.Nrc Is Requested to Terminate License ML20196L1801999-05-18018 May 1999 Withdraws Licensee & Attachment,Containing Rev 2 to Vermont Yankee Operational QA Manual, from Further Consideration by Nrc.Summary of Commitments Encl ML20206K3201999-05-0707 May 1999 Forwards Response to RAI Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment ML20206J2801999-04-30030 April 1999 Forwards 1998 Annual Financial Repts for CT Light & Power Co,Western Ma Electric Co,Public Svc Co of Nh,North Atlantic Energy Corp,Northeast Nuclear Energy Co & North Atlantic Energy Svc Corp,License Holders ML20206D3731999-04-27027 April 1999 Informs NRC of Changes in Recipients of NRC Docketed Correspondence ML20206B1401999-04-23023 April 1999 Forwards Replacement of Section 3(a) of NSHC Determination Provided by Re TS Proposed Change 208,suppl Section 6 ML20205S3381999-04-16016 April 1999 Submits Revised Schedule for Response to NRC 990226 RAI Re 980630 Submittal of IPEEE Rept.Info Will Be Submitted by 991231 ML20205S3891999-04-16016 April 1999 Forwards non-proprietary & Proprietary Revised Page to Holtec Rept HI-981932,supplementing TS Proposed Changed 207 Re Spent Fuel Pool Storage Capacity Expansion ML20205S3031999-04-15015 April 1999 Forwards Revised TS Bases Pages 90,227,164 & 221a,accounting for Change in Reload Analysis from Yaec to GE Methodology, Reflecting Change in Condensation Stability Design Criteria & Accounting for More Conservative Calculation ML20205P9291999-04-14014 April 1999 Requests That Rev to NRC 821029 SER for NUREG-0737,Item II.K.3.24,be Issued to Clarify Util Installed RCIC & HPCI HVAC Configuration,As Discovered During Preparation of DBDs for Sys ML20205P8191999-04-13013 April 1999 Forwards Rev 2 to COLR for Vermont Yankee Cycle 20, Dtd Feb 1999,IAW TS Section 6.7.A.4 ML20205M3191999-04-0707 April 1999 Forwards 1998 Annual Rept of Results of Individual Monitoring, Per 10CFR20.2206(b).Licensee Is Submitting Matl to Only Addressee Specified in 10CFR20.2206(c).Without Encl ML20205K0351999-03-31031 March 1999 Informs That Certain Addl Corrections Warranted for 990121 SER for Amend 163 to License DPR-28 Re Suppression Pool Water Temp.Suggested Corrections Listed ML20205K1821999-03-31031 March 1999 Informs of Modifications That Util Made to CO(2) Fire Suppression Sys,Due to Sen 188 Which Occurred at Ineel on 980728.Compensatory Actions Will Remain in Place Until Modifications Are Complete & Systems Are Returned to Svc ML20206A6951999-03-29029 March 1999 Request Confirmation That No NRC Action or Approval,Required Relative to Proposed Change in Upstream Economic Ownership of New England Power Co,Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee 1999-09-29
[Table view] |
Text
. _ ..
?
WERMONT YANKEE
-NUCLEAR POWER CORPORATION 1
- l
..- - Ferry Road, Brattleboro, VT 05301-7002 ENGINEERING OFFICE N 580 MAIN STREET BOLToN. MA 01740 (508) 779-6711 June 10,1996 BVY 96-76 United States Nuclear Regulatory Commission ATTN: Document Control Desk
, Washington,DC 20555
References:
(a) License No. DPR-28 (Docket No. 50-271)
(b) Letter, VYNPC to USNRC, BVY 96-61, dated 5/9/96
Subject:
Impact of New Single Failure Scenario on Previous Vermont Yankee LOCA Analyses The purpose of this letter is to provide an assessment of the impact of a recently identified single failure scenario on previous Vermont Yankee loss-of-coolant-accident (LOCA) '.nalyses and an additional assessment of the safety significance of this discovery.
In LER 96-10 [ Reference (b)], Vermont Yankee reported the discovery of the dependency between the residual heat removal (RHR) minimum flow valve and the cross-powered RHR pumps. This dependency impacted the limiting single failure in the LOCA analysis for Vermont l Yankee. Subsequent to issuing that LER, Mr. Ralph Landry of the NRC Staff visited our engineering office to review the technical work performed in concluding that no significant safety concern existed. This involved a review of both current and previous LOCA analyses supporting Vermont Yankee operation. During the course of the review, a telephone conference was conducted with General Electric (GE) personnel regarding the design basis LOCA analyses for operating cycles prior to Cycle 17 (i.e., prior to adoption of the new RELAP5YA-BWR based LOCA analysis).
As described in the attached letter, the original design of the Vermont Yankee plant bounds the new single failure scenario. The maximum peak clad temperature (PCT) cases for the design basis LOCA analysis (intermediate-to-large sized breaks) prior to Cycle 17 would be unaffected by the availability of the RHR pumps due to the timing of the event. For other PCT cases the previous models were overly conservative. Using more realistic licensing techniques, (e.g.
SAFER /GESTR), one core spray pump plus the automatic depressurization system (ADS) will, most likely, maintain adequate cooling. Further, best estimate calculations using previous v
8 i 9606100033 960610 PDR ADOCK 05000271 g p PDR +
s United States Nuclear Regulatory Commission VERMONT YANxto NUCLEAR POWER CORPORATION June 10,1996 Page 2 of 2 models showed acceptable results with one core spray pump and ADS for any break size and location.
We trust that the information provided satisfies your request; however, should you have any questions, please contact this office.
Sincerely, VERMOr;T YANKEE NUCLEAR POWER CORPORATION
&Htid -
James J. Duffy Licensing Engineer Attachment c: USNRC Region I Administrator USNRC Resident Inspector - VYNPS USNRC Project Manager - VYNPS l
J G GE Nuclear Energy 175 CurtnerAvenue, Mc 172 Sets Jose, CA 95111 June 9,1996 _
To: Michele Sironen Yankee Atomic Electric Company Subject. RHR Minimum Flow Bypass Valve Impact on ECCS Analysis
References:
- 1. Vermont Yankee LER 96-010,
- 2. Phone discussions ofMay 30,1996 and June 7,1996.
Dear Michele,
Attached please find GE's assessment regarding the impact on the Vermont Yankee ECCS performance analysis if the RHR minimum flow bypass valves fail to open and, as a result,
' cause damage to the RHR pumps.
Please contact me if you require additional support on this issue.
Best regards, l hYk- l David A. Hamon Phone (408) 925-4593 Fax (408) 925-1412 cc: E.G. Thacker
I Backgruend:
l It was recently discovered at[Vennont Yankee that the minimum flow bypass valves for RHR the (LOCA) Residual Heat Removal signal. The RHR are used to (dunps) pumpsCoolant provide Low Pressure would not Injection open on a I
(&CI) flow to the reactor prpssure vessel (RPV) following a LOCA. As a result of the failure of the mimmum flow bypass valve to open, if the LPCI flow to the vessel is not initiated within two minutes, there is a possibility that the RHR pumps may not function ,
ca operly. .
j Discussion: _
The original BWR/4 design was based on adequate emergency core cooling system (ECCS) performance with S plus one core spray for the entire break spectmm 'lliis was demonstrated using the els, assumptions and acceptance criteria which existed at l the time of the design in mid-1960s. Thus, the recently discovered situation at j Vermont Yankee which couldl lead to loss of all RHR pumps if they do not begin injecting l into the RPV in less than tso minutes is within the original design basis of Vermont J Yankee.
Subsequent to the original BWR/4 design, the ECCS acceptance criterion for peak daMag temperature (PCT) was inade more restrictive, and numerous penalties [i.e.,
counter-current flow limitaticn (CCFL), core spray distnbution, etc.] were imposed on GE's ECCS evaluation models. 10CFR50 Appendix K was also developed which produced changes in both nKxlels and analysis assumptions. These changes lead to calculated PCTs which were very close to the 10CFR50.46 acceptance criterion for Vermont Yankee.
The ECCS analyses documested in References 1 and 2 have a number of events with calculated PCTs that are v ' close to 2200"F. All of the cases with high PCTs are for intermediate-to-large sized (0 8 ft' to DBA) recirculation discharge breaks with failure of the LPCI injection valve in the unbroken recirculation line. None of these cases take any credit for LPCI flow reaching the vessel. Flow from the two L"CI pumps injecting into the broken recirculation loop is assumed to be lost out the break before reachin6 the RPV.
l Flow from the two LPCI pun,ips which could inject into the unbroken recirculation loop 1 never reaches the RPV due tp the assumed failure to open of the LPCI injection valve.
- GE's conservative SAFE and REFIAOD evaluation models were used in the Reference 1 and 2 evaluations. Use of more realistic models such as SAFER /GESTR would produce much lower calculated PCTs.
In addition to the single failure considerations described above, the depressurization rate of the intermediate-to-large ! sired breaks was examined. For the 0.8 ft2 break, the calculated RPV pressure at do minutes into the event is already very close to atmospheric pressure, and larger breaks pould depre.ssurize even faster. Consequently, the LPCI i
purnps would be up and runnihg in less than two minutes for all events in Reference I and i 2 that reauked in high calculated PCTs. l l
Following the Three Mile Island (TMI) Accident, GE performed a large number of realistic ECCS performance evaluations to demonstrate the BWR response to a variety of small break accident events. l Specific examples of small break events for BWR/4 plants with only one low pressure EjCC system available are shown in Figure Groups 3.5.2.1-4 (LPCS + ADS) and 3.5.2.1-13 LPCI + ADS) of Reference 3. A similar case is shown in Figure Group 3.5.2.1-17 which(takes credit for one LPCS, one LPCI and ADl of these cases show calculated core average temperatures ofless than 1000*F, but results for the high power bundle were not apecifically evaluated in this study. A comparison of the case with one LPCS plus bne LPCI to the case withjust one LPCS indicates that the core average temperature results are not very sensitive to whether or not the IPCI pump actually operates. l l
In the mid 1980s, realistic ECCS evaluations were performed using SAIT for the BWR Owners' Group (BWROG) k devek>p success criteria for use in probabilistic safety -
analyses (PSAs) [4]. These , analyses demonstrate that one core spray system plus two AUS valves pruvide adequate core cooling (Idgh power bundle PCT < 2200*F) for the entire range of postulated break sizes and locations. Much lower small break temperatures would be obtained by taking credit for the full complement of ADS valves.
I ,
More recently, GE has obtalhed approval for its improved long-term thennal-hydraulic model, SAFER /GESTR. SAFER builds directly on a combination of GE's previously used i
ECCS performance evaluahon model Major improvenmus over the earlier SAFE /REFLOOD evaluation model have been incorporated in the following areas:
I f
. Nodal Representatlan ofthe Reactor Pressure Vessel (RPV):, All major regions of the vessel are represented separa:cly. This allows a more realistic void fraction profile and mass inventory to be calculated and provides better modeling of the counter-current flow limiting (CCFL) phenomerum.
l
. Hydesalic Calculations: The CCFL phenornenon is treated at all restrictions between the major core regions. Th most significant performance improvement occurs at the i bundle entrance where CCFL effects hold liquid in the bundles early in the transient,
&is delaying dryout time IyAlso, improvements in bypass leakage modeling allow more coount from the bypass region to enter the bundles contributing to earlier reflood.
i
. Core Heat Transfer Realistic heat transfer coefficients are used for the various flow regimes: nucleate boiling,it ransition boiling, dispersed droplet fdm boiling, pool fdm 3
boiling, steam cooling und single-phase liquid forced convection. Realistically
. calculated heat transfer,j coupled with more accurate mass balance and mass
- distnbution, results in sub, stantial lower PCTs and more accurate prediction of the water level response. I i
I
Although no SAFER /GESTR analysis has been performed for Vermont Yankee, GE l
< anticipates that SAFER would most likely show acceptable Appendir K results for small breaks with only one core spray and ADS available.
Conclusion:
The original design of the Vemx>nt Yankee plant bounds the recently discovered situation which could lead to the loss o{all RHR pumps. In addition, the cases with high calculated PCTs which are reported in References 1 and 2 would be unaffected by the availability of )
the RilR pumps. These cased depressurize to below the shutoff head of the RHR pumps well before two minutes, and these casca also took no credit for RIIR/IECI flow reaching the RPV.
I By using more realistic licensmg analysis techniques, it can be shown that one core spray plus ADS will most likely nph'ntain adequate core cooling for unall breaks that don't depressurize to below the shdtotT head of the RIIR pumps in less than two minutes. In addition, by using best-estimhe analysis assumptions it has been shown that one core spray plus two ADS valves arp adequate for any break size and location.
I
References:
I. NEDO-21697, Losssf-Coolant Accident Analysis Report for Vermont Yankee NuclearPowerStatiof, August 1977. l l
- 2. NEDO-21662-2, Lospl-of-Coolant Accident Analysis Report for James A.
FitzPatrick Nuckar Power Plant (Lead Plant), Revisic n 2, July 1977.
l
- 3. NEDO-24708 A, AdditionalInformationfor NRC Staff Generic Report on Boiling ,
Water Reactors, Voluhes 1 and 2, Revision 1, December 1980.
l
- 4. NEDC-30936P, BWR Owners' Group Technical Specification Imprznnnent i Methodology (with nstration for BWR ECCS Actuation Instrumentation), \
I Part I, November 19 5.
l l l l