ML20092N671

From kanterella
Revision as of 08:10, 4 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards INPO Dec 1983 Const Project Evaluation.Tracking Sys & Programs for Resolution of Findings Established
ML20092N671
Person / Time
Site: Clinton Constellation icon.png
Issue date: 05/04/1984
From: Hall D
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20092N672 List:
References
0982-L, 982-L, U-10153, NUDOCS 8407030415
Download: ML20092N671 (1)


Text

p- -

y - 0w

[ *~

U-10153 ILLINOIS POWER COMPANY gg 1 9992_7 l cunicN POWER STATION. P.O. BOX 672. CUNTON. ILLINOIS 61727 May 4, 1984 __

7 j E FRiuCIPAL STAFF

,y '

T T5E~E Wh1 h[

Docket No. 50-461 Mr. James G. Keppler Regional Administrator w-h{

f%

Region III S. Nuclear Regulatory Commission F l

file NM U. "

799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Clinton Power Station Construction Project Evaluation

Dear Mr. Keppler:

Attached is the report of Institute of Nuclear Power Operations' (INPO) Construction Project Evaluation of Illinois Power Company's Clinton Power Station. The evaluation was conducted during the period November 28 - December 5, 1983.

Illinois Power Company has established programs and a track-ing system for resolving the findings identified in this report.

We will be glad to further discuss our plans for resolving the findings if you desire.

Sincerely yours, 1

. . Hall Vice President REW/ psf attachment cc USNRC Resident Inspector ,

Manager - Quality Assurance (w/o attachment)

Illinois Department of Nuclear Safety Director - Office of I&E, Washington, D.C. 20555

, 7hhh5 0 0 ga0{

g QY 1 0 24 a - /

i

. , , n 1