ML20092N671
| ML20092N671 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 05/04/1984 |
| From: | Hall D ILLINOIS POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20092N672 | List: |
| References | |
| 0982-L, 982-L, U-10153, NUDOCS 8407030415 | |
| Download: ML20092N671 (1) | |
Text
p-0w
[ *~
y U-10153 ILLINOIS POWER COMPANY gg 1 9992_7 l cunicN POWER STATION. P.O. BOX 672. CUNTON. ILLINOIS 61727 May 4, 1984 7
j E FRiuCIPAL STAFF
,y T
T5E~E Wh1 Docket No. 50-461 h[
Mr. James G. Keppler h{
Regional Administrator w-f%
Region III file NM U. S. Nuclear Regulatory Commission F
l 799 Roosevelt Road Glen Ellyn, IL 60137
Subject:
Clinton Power Station Construction Project Evaluation
Dear Mr. Keppler:
Attached is the report of Institute of Nuclear Power Operations' (INPO) Construction Project Evaluation of Illinois Power Company's Clinton Power Station.
The evaluation was conducted during the period November 28 - December 5, 1983.
Illinois Power Company has established programs and a track-ing system for resolving the findings identified in this report.
We will be glad to further discuss our plans for resolving the findings if you desire.
Sincerely yours, 1
Hall Vice President REW/ psf attachment cc USNRC Resident Inspector Manager - Quality Assurance (w/o attachment)
Illinois Department of Nuclear Safety Director - Office of I&E, Washington, D.C.
20555 ga0{
7hhh50 0
QY 0 24 g
1 a -
/
1 i
n
.