Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217F8231999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of Catawba Nuclear Station.Based on Review,Nrc Did Not Identify Any New Areas That Warranted More than Core Insp Program Over Next Five Months.Historical Listing of Issues,Encl ML20217H0041999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217F1301999-10-0707 October 1999 Forwards Rev 1 to Request for Relief 99-03 from Requirements of ASME B&PV Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting (Vg) Sys ML20212J3011999-10-0101 October 1999 Forwards Exemption from Certain Requirements of 10CFR54.17(c) Re Schedule for Submitting Application for Operating License Renewal.Se Also Encl ML20217K2651999-10-0101 October 1999 Forwards Retake Exams Repts 50-413/99-302 & 50-414/99-302 on 990921-23.Two of Three ROs & One SRO Who Received Administrative Section of Exam Passed Retake Exam, Representing 75 Percent Pass Rate 05000414/LER-1999-004, Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments1999-09-27027 September 1999 Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments 05000413/LER-1999-015, Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept1999-09-27027 September 1999 Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept ML20217A7911999-09-24024 September 1999 Forwards Insp Repts 50-413/99-05 & 50-414/99-05 on 990718- 0828 at Catawba Facility.Nine NCVs Identified Involving Inadequate Corrective Actions Associated with Degraded Svc Water Supply Piping to Auxiliary Feedwater Sys ML20212E6471999-09-24024 September 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for Catawba NPP & 990615.Informs That NRC Reviewed Response for Catawba & Concluded That All Requested Info Provided.Considers GL 98-01 to Be Closed for Catawba ML20212F0941999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals for Cns,Units 1 & 2 ML20212M2001999-09-20020 September 1999 Confirms 990913 Telcon Between M Purser & R Carroll Re Management Meeting to Be Conducted on 991026 in Atlanta,Ga to Discuss Operator Licensing Issues 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments1999-09-20020 September 1999 Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212B4641999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for Catawba Nuclear Station,Units 1 & 2 ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20212M1931999-09-13013 September 1999 Refers to 990909 Meeting Conducted at Region II Office Re Presentation of Licensee self-assessment of Catawba Nuclear Station Performance.List of Attendees & Licensee Presentation Handout Encl ML20212A3751999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementation Code Case for Duration of Insp Interval ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 05000413/LER-1999-014, Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment1999-09-0101 September 1999 Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment 05000414/LER-1999-003, Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev1999-08-31031 August 1999 Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev 0 of LER ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting 05000413/LER-1999-013, Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER1999-08-25025 August 1999 Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER ML20211M8191999-08-25025 August 1999 Confirms 990825 Telcon Between G Gilbert & R Carroll Re Mgt Meeting to Be Held on 990909 in Atlanta,Ga,To Allow Licensee to Present self-assessment of Catawba Nuclear Station Performance ML20211A9641999-08-20020 August 1999 Forwards SE Authorizing Licensee 990118 Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section XI for Plant,Units 2 ML20211C1191999-08-18018 August 1999 Forwards ISI Rept Unit 1 Catawba 1999 RFO 11, Providing Results of ISI Effort Associated with End of Cycle 11 ML20211B9471999-08-18018 August 1999 Forwards Request for Relief 99-02,associated with Limited Exam Results for Welds Which Were Inspected During Unit 1 End of Cycle 11 RFO ML20211C3651999-08-17017 August 1999 Forwards Rev 25 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program, Which Includes Reformatting of Manual & Addl Changes as Noted in Attached Summary of Changes ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 05000413/LER-1999-011, Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment1999-08-16016 August 1999 Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210V0321999-08-13013 August 1999 Forwards Insp Repts 50-413/99-04 & 50-414/99-04 on 990606- 0717.Six Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20210S2751999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210Q3751999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date,In Order to Register Individuals for Exam ML20210N9521999-08-0404 August 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual.Documents Constitutes Chapter 16 of Ufsar.With List of Effective Pages IR 05000413/19980131999-08-0202 August 1999 Discusses Integrated Insp Repts 50-413/98-13,50-414/98-13, 50-413/98-16,50-414/98-16 & NRC Special Repts 50/413/99-11 & 50-414/99-11 Conducted Between Aug 1998 & May 1999.Six Violations Occurred,Based on OI Investigation & Insp ML20210M6411999-07-29029 July 1999 Forwards Request for Relief 99-03 from Requirements of ASME Boiler & Pressure Vessel Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting Air (Vg) Sys 05000413/LER-1999-010, Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units1999-07-22022 July 1999 Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units IR 05000413/19990101999-07-22022 July 1999 Discusses Insp Rept 50-413/99-10 & 50-414/99-10 on 990314- 0424 & Forwards Notice of Violation Re Failure to Comply with TS 3.7.13,when Misalignment of Two Electrical Breakers Rendered SSS Inoperable from 981216-29 ML20217G5241999-07-20020 July 1999 Forwards Exam Repts 50-413/99-301 & 50-414/99-301 on 990524- 27,0603,07-10 & 16.Of Fourteen SRO & RO Applicants Who Received Written Exams & Operating Tests,Eight Applicants Passed & Six Failed Exam 05000413/LER-1999-009, Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept1999-07-19019 July 1999 Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept 05000414/LER-1999-001, Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed1999-07-15015 July 1999 Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed ML20209H4431999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for May 1999 on Unit Shutdowns Also Encl ML20210A5771999-07-14014 July 1999 Forwards Revsied Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e),changing Sections 16.7-5,16.8-5,16.9-1,16.9-3,16.9-5 & 16.11-7.Manual Constitute Chapter 16 of UFSAR ML20216D3941999-07-14014 July 1999 Forwards Revs to Catawba Nuclear Station Selected Licensee Commitments Manual NUREG-1431, Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation1999-07-0909 July 1999 Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196L0371999-07-0808 July 1999 Approves Requested Schedule Change of Current two-year Requalification Examinations to non-outage dates.Two-year Cycle Will Start on 991001 & Will End on 020930 05000413/LER-1999-008, Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach1999-07-0808 July 1999 Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach ML20196J9001999-07-0606 July 1999 Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 IR 05000413/19990031999-07-0101 July 1999 Discusses Insp Repts 50-413/99-03 & 50-414/99-03 Completed on 990605 & Transmitted by Ltr .Results of Delibrations for Violation Re Discovery of Potentially More Limiting Single Failure Affecting SGTS Analysis Provided 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217H0041999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217F1301999-10-0707 October 1999 Forwards Rev 1 to Request for Relief 99-03 from Requirements of ASME B&PV Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting (Vg) Sys 05000414/LER-1999-004, Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments1999-09-27027 September 1999 Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments 05000413/LER-1999-015, Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept1999-09-27027 September 1999 Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments1999-09-20020 September 1999 Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212B4641999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for Catawba Nuclear Station,Units 1 & 2 ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 05000413/LER-1999-014, Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment1999-09-0101 September 1999 Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment 05000414/LER-1999-003, Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev1999-08-31031 August 1999 Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev 0 of LER ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting 05000413/LER-1999-013, Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER1999-08-25025 August 1999 Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER ML20211B9471999-08-18018 August 1999 Forwards Request for Relief 99-02,associated with Limited Exam Results for Welds Which Were Inspected During Unit 1 End of Cycle 11 RFO ML20211C1191999-08-18018 August 1999 Forwards ISI Rept Unit 1 Catawba 1999 RFO 11, Providing Results of ISI Effort Associated with End of Cycle 11 ML20211C3651999-08-17017 August 1999 Forwards Rev 25 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program, Which Includes Reformatting of Manual & Addl Changes as Noted in Attached Summary of Changes ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 05000413/LER-1999-011, Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment1999-08-16016 August 1999 Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210S2751999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210N9521999-08-0404 August 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual.Documents Constitutes Chapter 16 of Ufsar.With List of Effective Pages ML20210M6411999-07-29029 July 1999 Forwards Request for Relief 99-03 from Requirements of ASME Boiler & Pressure Vessel Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting Air (Vg) Sys 05000413/LER-1999-010, Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units1999-07-22022 July 1999 Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units 05000413/LER-1999-009, Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept1999-07-19019 July 1999 Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept 05000414/LER-1999-001, Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed1999-07-15015 July 1999 Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed ML20216D3941999-07-14014 July 1999 Forwards Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20209H4431999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for May 1999 on Unit Shutdowns Also Encl ML20210A5771999-07-14014 July 1999 Forwards Revsied Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e),changing Sections 16.7-5,16.8-5,16.9-1,16.9-3,16.9-5 & 16.11-7.Manual Constitute Chapter 16 of UFSAR 05000413/LER-1999-008, Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach1999-07-0808 July 1999 Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach ML20196G7461999-06-22022 June 1999 Requests Exemption from Requirements of 10CFR54.17(c) That Application for Renewed Operating License Not Be Submitted to NRC Earlier than 20 Yrs Before Expiration of Operating License Currently in Effect ML20196E9541999-06-18018 June 1999 Forwards SG Tube Insp Conducted During Unit 1 End of Cycle 11 Refueling Outage.Attachments 1,2,3 & 4 Identify Tubes with Imperfections in SGs A,B,C & D,Respectively ML20195K4571999-06-14014 June 1999 Forwards MORs for May 1999 & Revised MORs for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20195J1691999-06-10010 June 1999 Forwards Written Documentation of Background & Technical Info Supporting Catawba Unit 1,notice of Enforcement Discretion Request Re TS 3.5.2 (ECCS-Operating),TS 3.7.12 (Auxiliary Bldg Filtered Ventilation Exhaust Sys) ML20217G5771999-06-0909 June 1999 Forwards Post Exam Comments & Supporting Reference Matls for Written Exams Administered at Catawba Nuclear Station on 990603 05000414/LER-1999-002, Forwards Abstract of LER 99-002-00 Re Forced Shutdown of Plant as Result of Flow Restriction Caused by Corrosion of Afs Assured Suction Source Piping Due to Inadequate Testing. Final LER Will Be Submitted No Later than 9907081999-06-0303 June 1999 Forwards Abstract of LER 99-002-00 Re Forced Shutdown of Plant as Result of Flow Restriction Caused by Corrosion of Afs Assured Suction Source Piping Due to Inadequate Testing. Final LER Will Be Submitted No Later than 990708 ML20207F2381999-06-0101 June 1999 Forwards Copy of Catawba Nuclear Station Units 1 & 2 1998 10CFR50.59 Rept, for NRC Files ML20195J1131999-05-26026 May 1999 Requests Approval to Change Cycle Dates for Two Year Requalification Training Program Required by 10CFR55.59,to Improve Scheduling of Requalification Exams to non-outage Periods 05000413/LER-1999-007, Forwards LER 99-007-00,re Operation Prohibited by TS 3.4.7. Commitments Identified in LER Are Listed in Planned Corrective Actions Section1999-05-26026 May 1999 Forwards LER 99-007-00,re Operation Prohibited by TS 3.4.7. Commitments Identified in LER Are Listed in Planned Corrective Actions Section ML20195B4751999-05-24024 May 1999 Forwards Rev 7 to UFSAR Chapter 2 & Chapter 3 from 1998 UFSAR for Catawba Nuclear Station.List of Instructions on Insertion Encl ML20196L1851999-05-20020 May 1999 Forwards Proprietary & non-proprietary Version of Rev 1 to TR DPC-NE-3004, Mass & Energy Release & Containment Response Methodology, Consisting of Finer Nodalization of Ice Condenser Region.Proprietary Info Withheld ML20196L1791999-05-20020 May 1999 Communicates Util Licensing Position Re Inoperable Snubbers. Licensee Has Determined That Structure of ITS Has Resulted in Certain Confusion Re Treatment of Inoperable Snubbers 05000413/LER-1997-009, Forwards LER 97-009-02, Unanalyzed Postulated Single Failure Affecting SG Tube Rupture Analysis, Suppl Revises Planned C/A Described in Suppl 1 to Ler.Current Status of C/As & Addl C/As Planned,Provided in Rept1999-05-17017 May 1999 Forwards LER 97-009-02, Unanalyzed Postulated Single Failure Affecting SG Tube Rupture Analysis, Suppl Revises Planned C/A Described in Suppl 1 to Ler.Current Status of C/As & Addl C/As Planned,Provided in Rept ML20206T4481999-05-13013 May 1999 Forwards Rev 3 to Topical Rept DPC-NE-3002-A, UFSAR Chapter 15 Sys Transient Analysis Methodology, IAW Guidance Contained in NUREG-0390 ML20206R1721999-05-13013 May 1999 Forwards Monthly Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 & Revised Monthly Operating Repts for Mar 1999 ML20206T0281999-05-12012 May 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual. Document Constitutes Chapter 16 of UFSAR 05000413/LER-1999-006, Forwards LER 99-006-00,re CR Ventilation Sys Inoperability. Root Cause & Corrective Actions for Occurence Are Being Finalized & Will Be Reported in Supplement Rept on 9906071999-05-10010 May 1999 Forwards LER 99-006-00,re CR Ventilation Sys Inoperability. Root Cause & Corrective Actions for Occurence Are Being Finalized & Will Be Reported in Supplement Rept on 990607 ML20206N8201999-05-10010 May 1999 Forwards Revs 15 & 16 to Catawba Unit 1 Cycle 12 COLR, Per TS 5.6.5.Rev 15 Updates Limits for New Catawba 1 Cycle 12 Reload Core & Rev 16 Revises Values Re Min Boron Concentrations for Rwst,Cla & SFP ML20206J4431999-05-0303 May 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e).Document Constitutes Chapter 16 of UFSAR ML20206D2141999-04-29029 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Catawba Nuclear Station,Units 1 & 2, Per Plant TS 5.6.3. Rept Contains Listed Documents ML20206E4101999-04-26026 April 1999 Forwards Four Copies of Rev 9 Todpc Nuclear Security & Contingency Plan,Per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 1999-09-08
[Table view] Category:OTHER U.S. GOVERNMENT AGENCY/DEPARTMENT TO NRC
MONTHYEARML20246K3921989-08-23023 August 1989 Forwards Final Rept of Exercise Conducted on 880219-20.Plan Remains Adequate to Protect Health & Safety of Public ML20209H9861986-08-15015 August 1986 Forwards Catawba Nuclear Station Site-Specific Offsite Radiological Emergency Preparedness Alert & Notification Sys QA Verification ML20207G3631986-06-20020 June 1986 Forwards Catawba Nuclear Power Plant Exercise, of 860220 Exercise.No Deficiencies Identified.Inadequacies Noted in Section III & Areas Requiring Improvement Identified in Section II ML20151Y8121986-01-17017 January 1986 Forwards Extracts from State & Local Radiological Emergency Offsite Preparedness Plans That Support Facility,Per 850913 Request for Medical Svcs Info for near-term OLs ML20133G8361985-10-0808 October 1985 Advises That States of Sc & Nc Local Emergency Plans & Preparedness Adequate to Protect Health & Safety of Public Pending Verification of Alert & Notification Sys ML20127G5431985-05-15015 May 1985 Responds to 841029 & 850419 Requests for Verification of Completion of Four Licensing Conditions & Two Confirmatory Items Re Offsite Emergency Preparedness.Conditions Met & Items Completed ML20116K9391985-04-30030 April 1985 Responds to 850419 Request for Review of Util Response to License Condition 23,Item 2 Re Content of Warning Signs & Decals in Emergency Planning Zone.Revised Wording for Signs & Decals Complies W/Aslb Conditions & Acceptable ML20094D9471984-07-27027 July 1984 Forwards States of Nc & Sc Responses to Regional Assistance Committee Findings on Offsite Radiological Emergency Response Preparedness & Exercise on 840215-16.State & Local Emergency Plans Adequate ML20084Q5231984-05-0808 May 1984 Forwards Interim Findings on Offsite Radiological Emergency Response Preparedness. State & Local Emergency Plans Capable of Being Implemented & Offsite Preparedness Adequate to Provide Reasonable Assurance of Public Health & Safety ML20084Q5861984-05-0808 May 1984 Forwards Exercise Rept:Catawba Nuclear Station Exercise 840215-16 ML20084D9431984-04-26026 April 1984 Forwards Notice of Appearance to Be Filed in Proceeding.W/O Encl.Related Correspondence ML20083B0591983-12-0808 December 1983 Comments on Draft Public Info Brochure for Facility.Actual Emergency Instructions Should Be Placed at Beginning of Brochure W/More General Info Planned at End of Pamphlet ML20071F1821983-03-0909 March 1983 Comments on Fes Submitted on 830110.Potential Impacts of Proposed Thermal Discharge on Water Quality Stds & Aquatic Life as Well as Aquatic Organism Mortality Resulting from Impingement & Entrainment Not Adequately Described ML20079L6151983-02-17017 February 1983 Informs That Fes Reviewed.Document Adequate in Describing Environ Impact of Plant ML20070P0441983-01-21021 January 1983 Verifies Filing of EIS,NUREG-0921.Publication of Notice of Availability in Fr Scheduled for 830121 ML20028B0201982-11-17017 November 1982 Responds to 820816 Ltr Transmitting Des.Draft Statement Reviewed within Scope of Designated Area of Responsibility & Expertise.No Comments Offered ML20027C5631982-10-12012 October 1982 Comments on Des (NUREG-0921) & Public Health & Safety Impacts of Proposed Plant Operation ML20063P1511982-10-0606 October 1982 Advises That Des Is Rated LO-1.Normal Operation of Facility Will Not Have Significant Impact on Environ.No Addl Info Needed ML20065G9671982-09-30030 September 1982 Comments on Historic & Archeologic Impacts,Water Quality, Entrainment,Thermal Discharge & post-operational Monitoring Discussions in Des ML20063A6581982-08-20020 August 1982 Offers No Comments on Des ML20010F9851981-09-11011 September 1981 Responds to 810901 Request for Review of Planned Facility Operation.No Federally Listed or Proposed Endangered or Threatened Plant or Animal Species Exist in Impact Area.Two Species Listed Which May Become Endangered in Future ML20010G4091981-07-31031 July 1981 Advises That DOJ Does Not Believe Antitrust Hearing for Util CP Necessary Re Piedmont Municipal Power Agency Ownership Participation ML19339B6041980-10-29029 October 1980 Advises That No Basis Exists to Conclude That Participation in Unit 1 by Nc Electric Membership Corp & Saluda River Electric Cooperative Constitutes Violation of Antitrust Laws.No Hearing Re Transfer of Ownership Necessary ML19317E2241975-05-21021 May 1975 Forwards 750417 Correspondence from Congressman Jr Mann Re Constituent Inquiry ML19312C6261974-04-26026 April 1974 Responds to AEC Request for Antitrust Advice.Advice in 710802,0929 & 730501 Ltrs Withdrawn.Antitrust Hearings Unnecessary & Should Be Terminated.Applicant 740426 Ltr & Statement of Commitments Encl 1989-08-23
[Table view] |
Text
, . - . ,
, N k33
?
Federal Emergency Management Agency Washington, D.C. 20472 C O Jll 271984 MEMORANDUM FOR: Edward L. Jordan Director, Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement U.S. Nucl r Regulatory Commission
& V FROM: . ri I
.Assis ant Associ e Director
/ M fice of Natura and Technological Hazards Programs
SUBJECT:
Interim Findings on Offsite Radiological Emergency Response Preparedness (RERP) for the Catawba Nuclear Station Reference is made to my memorandum dated May 8,1984, subject as above and your memorandum dated June 7,1984.
Attached is a letter from the State of South Carolina dated April 24, 1984, and a letter from the State of North Carolina dated May 22, 1984. They respond to the Regional Assistance Committee (RAC) review as documented in the material attached to my May 8, 1984, memorandum.
Based on a review of the above information and the results of the full participation exercise conducted February 15-16, 1984, FEMA finds that the State and local emergency plans are adequate and the exercise demonstrated that the offsite preparedness is adequate to provide reasonable assurance that appropriate measures can be taken to protect the health and safety of the public living in the vicinity of the Catawba Nuclear Station in the event of a radiological emergency.
If you have any questions on the above, please contact Mr. Robert S. Wilkerson, Chief, Technological Hazards Division, at 287-0200.
Attachments As Stated s
b 8408090042 840727 l PDR ADOCK 05000413 F
(\ PDR
g', Q . ,
..- ;;, ..:. r . . : - i . **
} .
rime Ccmirc4/ / ,
& Pudic Safety
D6 kst J.>ne> 5tre. . R.k.ch ?:C:1 1 cres B H.mi. Jr.. Goverm,r Dxision of Em. r9c.vv M - r .. -
H. m m R C!m k. Secretarv flay 22, 1984 (9191 733 38
I 1
fir. Glenn C. Woodard, Jr.
Chairman, RAC IV Federal Emergency fianagement Agency Region IV 1375 Peachtree Street, N. E.
Atlanta, Georgia 30309
Dear fir. licodard:
Enclosed is the response to the Regional Assistance Comittee's informal evaluation coments of the Off-Site Radiological Emergency Response Plans (January 1984 revision) for the Catawba Nuclear Station.
If you have corrunents concerning the actions proposed by the attachment to this letter, please forward them in time for consideration prior to the distribution of the planned changes.
Sincerely,'
sf'--C.,
le.sw V G III sse T. Pugh, JTPIII:br .
Enclosure cc: Ron Harris, Duke Power l
l l
l l
g . ', = ..
- 1. ' A'SS IGNMENT OF RESPONSIBILITY (ORGANIZATION CONTROL - NUREG ITEM-A.3) l l
Action will be taken to incorporate letters of agreement for private agencies having emergency response roles prior to the distribution of the planned changes. These agreements will include information outlined in NUREG-0654 Criteria. Gaston Memorial Hospital and Gaston County Emergency Medical Services are not private agencies, therefore, agreements are not necessary.
- 11. EMERGENCY RESPONSE SUPPORT AND RESOURCES NUREG ITEM -C.4.
Efforts toward updating letters of agreement with individuals and organizations have already begun by the Radiation Protection Section. Since the completion of this task involves,a number of individuals and agencies, a great deal of coordination is necessary. Therefore, all agreements may not be incorporated in the final plan but will be in the subsequent changes. This delay will not impede emergency operations procedures.
III. PROTECTIVE RESPONSE - NUREG ITEM - J.10.a.
Preselected radiological monitoring and sampling points are normally not shown on the operations map. This information is the responsibility of the Radiation Protection Section, North Carolina Department of Human Resources (RPS) and is included on maps utilized by RPS. Therefore, no action needs to be taken.
IV. PROTECTIVE RESPONSE - NUREG ITEM -J.12 The need for letters of agreement from the Red Cross have been. brought to the attention of county emergency management personnel. Agreements will be incorporated in the next planned changes and will include information on registering of evacuees.
Monitoring of evacuees is not a Red Cross responsibility.
Monitoring operations will be implemented by fire and rescue departments of Gaston and Mecklenburg Counties.
l V. EXERCISES AND DRILLS - NUREG ITEM - N.2.a.
Annex I will include page 90 as a reference in the next plan l
revision.
1 i
. v.e: .
sy, Ghr # tate of Bauth Garolina militarg Bepartment OFFICE OF THE ADJUTANT GENERAL
- 2. uro ...c,..., April 24, 1984 1,,a aE[Eo'1 Mr. Glenn C. Woodard, Chairman R gional Assistance Committee FEMA, Region IV Suite 664 1375 Peachtree Street, NE Atlanta G orgia 30309 Daar oodard:
The following are the South Carolina responses to the RAC Review of the Catawba Plans.
NUREG ITEM: A.3.
RAC Comment: Private sector organizations with responsibilities assigned in the plan should have letters of agree-ment in the plan. These 1.o.a.'s should meet NUREG-0654 criteria.
SC RESPONSE: Concurr. In the next update of the Catawba Plans, letters of agreement will be included for private sector organizations.
NUREG. ITEM: G.4.c.
RAC COMMENT: Rumor control arrangements are not discussed in plan. A narrative discussion is needed giving
' specific responsibilities for rumor control and describing coordination arrangements.
Emergency Preparedness Division l
Rutledge Building 1429 Senate Street Columbia, South Caroline 29201 (803) 754-2826
i*
Glenn Woodard Letter April 24, 1984 Pcge 2 SC RESPONSE: Disagree. On page 32-33, Section 12 of SCORERP it states that it is the responsibility of the media center staff to prevent rumors from reaching the public. Additionally, the Catawba Brochure that is being revis'.ed will have specific telephone numbers to call in the event the public has heard a rumor.
NUREG ITEM: H.11.
RAC COMMENT: Emergency Kits by general category (protection equip-ment, communications, etc.) are not listed in an appendix as prescribed in NUREG-0654.
SC RESPONSE: Concurr. The next revision of the Catawba Plans will have an appendix (SCORERP and York County Plan) des-cribing emergency kits and communications.
Protective Equipment:
York County has approximately 100 kits stored in ~
shelters within the county totaling as follows:
Quantity:
66 - CDV 700 - Low Range Monitor 167 - CDV 715 - High Range Monitor 16 - CDV 717 - High Range Monitor i 167 - CDV 750 Dosimeter Charger 1002 - CDV 742 Dosimeter l Emergency Communications:
The SC communications 18-wheel van used for deployment in all. emergencies c'ontains the following communications cabability:
e Facsimile by land-line
- e SC EPD Local Government Radio (LGR) e SC Wildlife and Marine Resources
- e SC Highway Patrol e SC Highway Maintenance .
- e (10) Regional Law Enforcement Mutual Aid e SC Forestry Commission e State Law Enforcement Division
. '. s ..
Glenn Woodard Letter
, April 24, 1984 '
Pcge 3 Emergency Communications (cont):
- e Plus an additional four portable base stations on SC EPD LGR Network e 10 hand held walkie-talkies on SC EPD LGR Network
- These communications systems have direct contact with York County.
'NUREG ITEM: J.10.a.
RAC COMMENT: Preselected radiological sampling and monitoring points for the plume exposure pathway are not on the operations map submitted.
SC RESPONSE: Disagree. SC does not in'dicate sampling and monitoring points on the operations map. This is a DHEC respon-sibility and those maps are maintained by DHEC for deployment to FEOC. (See D.4 pg 3 SCORERP) (See XII maps pg B-5 STRERP)
NUREG ITEM: J.10.d.
f RAC COMMENT: There is no listing of special facilities (with number of occupants) for the mobility-impaired or institution-alized and no listing of resources to assist in the evacuation of this segment of the population. Plan also does not define "special facilities" and does not indicate that the county has identified the mobility-impaired.
SC RESPONSE: Each item will be addressed separately. eItem concern-ing list of special facilities: concur. Duke Power, the State of SC and York County are in the process of researching and obtaining an accurate list of special facilities and the mobility-impaired. Once this infor-mation is obtained it will be included in the next re-j vision of the plan and kept on. file in the York County
.EOC to update annually.
e Item concerning resources to assist in evacuation:
Disagree. (See Annex L - York County Plan section II. '
Situation pg L-1.) (See annex Q York County Plan, l l Section II.k. Transportation pages Q24-25.)
U --- - -
1... .
Glcnn Waodard Letter
. April 24, 1984 Pcge 4 e Item Concerning definition of "special' facilities":
Disagree. "Special Facilities" are defined on pg D-1, Annex D, Catawba Site-Specific.
NUREG ITEM: J.10.k.
RAC COMMENT: Plan needs clarification of procedures by which the Transportation Coordinator would deal with special evacuation problems. Potential impediments to evac-uation routes are not addressed. While the SC Compre-hensive Disaster Preparedness Plan describes the authority and operations of the Forestry Commission to remove debris in the event of a Governor's Declared Disaster, the coordinating links with the local Trans-portation Coordinator are not described.
SC RESPONSE: Each item will be addressed separetly, e Item concerning clarification of procedures to deal with special problems:
Disagree. SC feels that the Transportation Annex is l clear and the procedures for which the coordinator will deal with special evacuation problems will be addressed in the Transportation SOP (Now being developed.) The Transportation Coordinator is a EOC Staff member and problems as they arise will be addressed and handled in the EOC.
e Item concerning potential impediments to evacuation routes:
Disagree. See Annex M Engineering and Public Works, York County Plan Section IV.E.1.e. pg M-4. Additionally, a statement will be added in Annex L, Transportation Service concerning the coordination between the Trans-portation Coordinato'r and the Engineering and Public Works Director for removal of potential impediments to evacuation routes.
e Item concerning coordination links between Transpor-l , tation Coordinator and State support:
. Disagree. See Annex L, York County Plan Section IV A.3.
" request for State Support".
NUREG ITEM: K.3.a.
RAC COMMENT: Plan should provide for the issuance of low range dos-imeters (e.g., CDV 138's) and permanent record devices (e.g. , TLD's or film badges) to emergency workers.
1 i
i j .
(
.= u . u
,, s. .. . ..
Glcnn Wsodcrd Letter April 24, 1984 Pcge 5 SC RESPONSE: Concurr. However, the CDV 138 low range dosimeters have been distributed as follows:
State Law Enforcement - 200 State Highway Patrol - 100 State Wildlife - 100 Ten Affected Counties 100 each State EPD - 200 The State of SC has no funds available at this time to purchase TLD's or Film Badges for issuance to emergency workers.
The State of South Carolina has enjoyed the fine relationship it has with the Regional Assistance Committee and appreciates the committees' comments on the Catawba Plans. Through this cooper-ation we will better our plans and better protect our citizens in the event of any type of emergency.
Sincerely,
/' ,/
o hua P. Moore ector JPM:BMc:ews
{
,m_. _, , _. . . - . . .- _ _ _. _.. -