Permanent Change (Pc) PC-02 to Rev 27 to Procedure/Work Plan OP-1904.002, Offsite Dose Projection Rdacs Computer MethodML20095F961 |
Person / Time |
---|
Site: |
Arkansas Nuclear ![Entergy icon.png](/w/images/7/79/Entergy_icon.png) |
---|
Issue date: |
12/07/1995 |
---|
From: |
ENTERGY OPERATIONS, INC. |
---|
To: |
|
---|
References |
---|
NUDOCS 9512190374 |
Download: ML20095F961 (7) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217N3171999-10-19019 October 1999 Rev 1,change 024-01-0 to OP-1903.011, Emergency Response Notifications ML20217J7641999-10-0505 October 1999 Rev 1 to Unit 1 Technical Requirement Manual, Replacing Index Page ML20216G0881999-09-19019 September 1999 Proposed Tech Specs Pages,Changing TS 4.18.5.a.9 & Associated Bases for One Cycle of Operation Through End of Cycle 16 for Suppl Use of OTSG Repair Roll Technology ML20212F5851999-09-17017 September 1999 Proposed Tech Specs Pages,Changing TS by Revising Curie Limits for Radioactive Gas Storage Tanks ML20216G0721999-09-17017 September 1999 Proposed Tech Specs,Revising Once Through SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Volumetric Integranular Attack ML20211P0061999-09-0707 September 1999 Proposed TS in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria ML20211B3291999-08-19019 August 1999 Proposed TS 4.18.3.a.4 Clarification Supporting Tube End Cracking Alternative Repair Criteria ML20211C4101999-08-18018 August 1999 Proposed Tech Specs Removing Requiremets for Tube Repair (Sleeving) & Clarifying Requirements for Preservice & ISI of Tubes to Facilitate Replacement of Original SGs ML20211C1701999-08-18018 August 1999 Proposed Tech Specs Revising ESAS Low RCS Pressure Setpoint to Ensure That TS Adequately Bounds Safety Analysis ML20210N5541999-08-0404 August 1999 Rev 28,Permanent Change 4 to OP-1903.061, Communication Equipment Test ML20210N5571999-08-0404 August 1999 Rev 23,Permanent Change 5 to OP-1903.011, Emergency Response/Notifications ML20210K5121999-07-29029 July 1999 Proposed Tech Specs,Revising Requirements Associated with Plant Station Batteries & DC Sources to 125 Vdc Switchyard Distribution Sys ML20210K3571999-07-29029 July 1999 Proposed Tech Specs Revising SRs Pertaining to ISI Requirements for SG Tube Circumferential Cracking at top-of-tubesheet During 2P99 Planned mid-cycle Outage ML20209H5811999-07-14014 July 1999 Proposed Tech Specs Revising RB Structural Integrity Requirements Re ISI Reporting for Containment Structures, Tendons & Anchorages ML20209H8701999-07-14014 July 1999 Proposed Tech Specs 6.2.2 & 6.2.2.h,replacing Functional Description of Operations Staff Middle Manager with Ref to Functional Description Assistant Operations Manager & Revising TS Table 6.2-1 Item 5 & TS 6.2.2.f ML20209H9721999-07-14014 July 1999 Proposed Tech Specs Changes for Elimination of Programmatic Requirements Associated with PASS & Regulatory Relief from PASS Requirements of NUREG-0737 & RG 1.97 ML20195D2371999-06-0101 June 1999 Proposed Tech Specs Re Surveillance Requirements & Applicable Bases Relevant to ISI Requirements for Portions of once-through SG (OTSG) Tubes Adjacent to Primary Cladding Region of tube-to Tubesheet Roll ML20206T2651999-05-14014 May 1999 Proposed Tech Specs Revising SG Tubing SRs ML20206Q1281999-05-10010 May 1999 Proposed Tech Specs Bases,Page B 2-2,discussing Guidance to Be Used When Applying Later Editions & Addendas of ASME Code to RCS Components ML20206J8021999-05-0404 May 1999 PC-03 to Procedure/Work Plan 1904-002, Offsite Dose Projections Rdacs Computer Method ML20205P6931999-04-0909 April 1999 Proposed Tech Specs Change,Adding Specification 3.0.6 & Associated Bases to ANO-2 ML20205P3731999-04-0909 April 1999 Revised Proposed TS Page 5-1 Re Design Features Conversion ML20205P6431999-04-0909 April 1999 Revised Proposed Technical Requirement Manual Pages ML20205P4081999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Reactor Bldg Structural Integrity Requirements ML20205P6291999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Battery Requirements ML20207C0631999-02-25025 February 1999 Proposed Tech Specs Change Revising Action 2 Associated with Table 3.3-1, Reactor Protective Instrumentation. Change Adds Footnote to Action 2 Allowing Startup with Functional Units Associated with Channel D Excore Inoperable ML20207M7561999-02-24024 February 1999 Proposed Tech Specs,Allowing Startup & Continued Operation of Plant with Channel D Detector Until New Detector Is Installed During mid-cycle Outage Scheduled for Nov 1999 ML20198K1341998-12-17017 December 1998 Corrected Tech Specs Pages to 980629 Application for Amend to License NPF-6 ML20198A3661998-12-0808 December 1998 Proposed Tech Specs B3/4 6-3 & B3/4 6-4,deleting All Requirements Associated with Sodium H Addition Sys & Adding New Requirements for Trisodium Phosphate to Be Stored in Containers Located on Floor of Cb ML20196B4381998-11-24024 November 1998 Proposed Tech Specs Pages,Changing Administrative Controls Section to Implement Consolidated QA Plan Manual & Clarifying Responsibilities on STA Position on Shift ML20196C9761998-11-24024 November 1998 Rev 1 to Unit 2 Technical Requirements Manual ML20154D6681998-10-0101 October 1998 Rev 28 to Procedure/Work Plan 1904.002, Offsite Dose Projections Rdacs Computer Method ML20153D8491998-09-17017 September 1998 Proposed Tech Specs 2.2.1,3.3.1.1 & 3.3.2.1 Re Operating Bypass Setpoint ML20153H1651998-08-12012 August 1998 Rev 0 to ANO Units 1 & 2 Technical Requirements Manual ML20236Y5251998-08-0606 August 1998 Proposed Tech Specs Section 3.1.3.2,revising Action Requirements for CEA Position Indicator Channels ML20236Y5081998-08-0606 August 1998 Proposed Tech Specs Section 3.3.4.B Re Sodium Hydroxide Tank Limits ML20236Y5951998-08-0606 August 1998 Proposed Tech Specs,Revising Requirements Associated W/Units 1 & 2 Control Room Emergency Ventilation Sys ML20236Q2781998-07-13013 July 1998 Proposed Tech Specs Re Safety Limits & Limiting Safety Settings ML20236G6921998-06-29029 June 1998 Proposed Tech Specs,Revising TS 3.4.2 & TS 3.4.12 Re Reactor Coolant Sys Safety Valves & Low Temp Overpressure Protection ML20236G5421998-06-29029 June 1998 Proposed Tech Specs,Revising Surveillance Testing Requirements for Unit 2 Direct Current Electrical Distribution Sys ML20236G5631998-06-29029 June 1998 Proposed Tech Specs,Revising Table 3.3-4 to Provide Range of Acceptable Values for 4160 Volt Bus Loss of Voltage Values ML20236G4911998-06-29029 June 1998 Proposed Tech Specs Re MSSVs & Pressurizer Safety Valves ML20199F7211998-05-22022 May 1998 Rev 8 to Simulator Mod Control,Training Desk Guide 6.3 ML20217N6141998-04-30030 April 1998 Proposed Tech Specs 1.6.1,revising Definition of Quadrant Power Tilt ML20217M2621998-04-30030 April 1998 Proposed Tech Specs Re DG Load Rejection Testing ML20217M4871998-04-28028 April 1998 Proposed Tech Specs Changing Order of Channel Rotation During Outage for Scheduling Flexibility,While Still Requiring Rotation Schedule to Be Established for Operating Cycle ML20217P8141998-04-0101 April 1998 Proposed Tech Specs Re Upper Tubesheet Volumetric Indications to Remain in Svc for Cycle 15 ML20216J7841998-03-17017 March 1998 Proposed Tech Specs Bases Change Concerning Plant Protection Sys Matrix Logic Testing ML20203D1061998-02-18018 February 1998 Proposed Tech Specs Revising Surveillance Testing Requirements for Emergency Feedwater Sys ML20202G9771998-02-0909 February 1998 Proposed Tech Specs Pages,Allowing Use of Repair Roll Technology (Reroll) for Upper Tubesheet Region of SGs 1999-09-07
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20217N3171999-10-19019 October 1999 Rev 1,change 024-01-0 to OP-1903.011, Emergency Response Notifications ML20217J7641999-10-0505 October 1999 Rev 1 to Unit 1 Technical Requirement Manual, Replacing Index Page ML20210N5571999-08-0404 August 1999 Rev 23,Permanent Change 5 to OP-1903.011, Emergency Response/Notifications ML20210N5541999-08-0404 August 1999 Rev 28,Permanent Change 4 to OP-1903.061, Communication Equipment Test ML20206J8021999-05-0404 May 1999 PC-03 to Procedure/Work Plan 1904-002, Offsite Dose Projections Rdacs Computer Method ML20205P6431999-04-0909 April 1999 Revised Proposed Technical Requirement Manual Pages ML20196C9761998-11-24024 November 1998 Rev 1 to Unit 2 Technical Requirements Manual ML20154D6681998-10-0101 October 1998 Rev 28 to Procedure/Work Plan 1904.002, Offsite Dose Projections Rdacs Computer Method ML20153H1651998-08-12012 August 1998 Rev 0 to ANO Units 1 & 2 Technical Requirements Manual ML20199F7211998-05-22022 May 1998 Rev 8 to Simulator Mod Control,Training Desk Guide 6.3 ML20202E1611997-12-0101 December 1997 IST Program Third Ten Yr Interval Submittal. W/32 Oversize Drawings ML20211Q1221997-10-14014 October 1997 Rev 22,change 2 to OP-1903.011, Emergency Response Notifications ML20198J8081997-10-14014 October 1997 Rev 28,Permanent Change 2 to Procedure/Work Plan 1903.061, Communications Equipment Tests ML20217K3001997-08-0808 August 1997 Change PC-03,Rev 21 to Work Plan 1903.030, Evacuation ML20151K2241997-07-29029 July 1997 Change PC-01,Rev 6 to OP-1903.035, Adm Potassium Iodide ML20148T0441997-07-0101 July 1997 Change PC-01 to Rev 12 to Procedures OP-1903.067, Emergency Response Facility - Emergency Operations Facility (Eof) ML20148T0221997-07-0101 July 1997 Change AP-06 to Rev 6 to Procedure OP-1903.035, Adm Potassium Iodide ML20148T0051997-07-0101 July 1997 Change PC-01 to Rev 32 to Procedure OP-1903.060, Emergency Supplies & Equipment ML20141C5421997-06-17017 June 1997 2 to Procedure Work Plan 1903.065, Emergency Response Facility Technical Support Center (Tsc) ML20148T5391997-06-0101 June 1997 Rev 0 to Third Ten-Year Interval ISI Plan for ANO Unit 1 ML20140C0951997-03-26026 March 1997 Rev 11,Change AP-11,to OP-1903.034, Emergency Operations Facility Evacuation ML20137D9271997-03-18018 March 1997 Rev 21-04-00,Change PC-04 to OP-1903.011, Emergency Response/Notifications ML20137W3621997-03-17017 March 1997 Rev 2 to Test Procedure TR-228, Three Hour Fire Test of One and Three Hour Versawrap Raceway Fire Barrier Sys for Conduits & Cable Trays ML20115D8901996-07-10010 July 1996 Permanent Change (Pc) PC-03 to Rev 11 to OP-1903.065, Emergency Response Facility Tsc ML20107G3981996-04-17017 April 1996 Rev 4 to Procedure 1903.053, Logistical Support, Combining Procedures 1903.054 & 1903.078 in W/Procedure 1903.053 & Deleting Procedures 1903.054 & 1903.078 Completely ML20107G4231996-04-17017 April 1996 Rev 4 to Procedure 1903.078, Emergency Response Support, Deleting Procedure.Info from Procedure Incorporated Into Procedure 1903.053, Logistical Support ML20107G4011996-04-17017 April 1996 Rev 6 to Procedure 1903.054, Addl Personnel, Deleting Procedure.Pertinent Info,Instructions & Requirements from Procedure Will Be Incorporated Into Procedure 1903.053, Logistical Support ML20101E3851996-03-13013 March 1996 Rev 15 to OP-1903.062, Communication Sys OP Procedure ML20101E3571996-03-13013 March 1996 Rev 28 to OP-1903.061, Communication Equipment Test ML20101E3771996-03-13013 March 1996 Rev 8 to OP-1903.066, Emergency Response Facility Osc ML20097B2221996-02-0606 February 1996 Change AP-33 to Rev 33 to OP-1903.010, EAL Classification ML20095F9611995-12-0707 December 1995 Permanent Change (Pc) PC-02 to Rev 27 to Procedure/Work Plan OP-1904.002, Offsite Dose Projection Rdacs Computer Method ML20091K8261995-08-28028 August 1995 Change PC-1 to Rev 9 to Procedure/Work Plan 1903.067, Emergency Response Facility - Eof ML20087B6431995-08-0808 August 1995 Rev 27 to Procedure/Work Plan 1904.002, Offsite Dose Projection Rdacs Computer Method ML20086B3901995-07-0505 July 1995 Rev 9 to Procedure/Work Plan 1903.067, Emergency Response Facility - Eof ML20084U7381995-06-13013 June 1995 Page 14 of Rev 20 to Procedure/Work Plan 1903.011, Emergency Response/Notifications ML20084L9881995-05-25025 May 1995 Rev 20 to Procedure/Work Plan 1903.011, Emergency Response/ Notifications ML20097B2201995-05-16016 May 1995 Change PC-2 to Rev 31 to OP-1903.060, Emergency Supply Equipment ML20083Q2961995-05-16016 May 1995 Rev 13 to Procedure/Work Plan 1905.002, Offsite Emergency Monitoring ML20083Q3071995-05-16016 May 1995 Rev 31 to Procedure/Work Plan 1903.060, Emergency Supplies & Equipment ML20083Q2891995-05-16016 May 1995 Rev 6 to Procedure/Work Plan 1903.064, Emergency Response Facility - Cr ML20083L6171995-05-0505 May 1995 Rev 9 to Procedure/Work Plan 1903.034, EOF Evacuation ML20083L6141995-05-0505 May 1995 Rev 4 to Procedure/Work Plan 1905.031, Airborne I-131 Determination Using RM-14.HP-210 ML20083L5941995-05-0505 May 1995 Rev 5 to Procedure/Work Plan 1905.004, EOF Radiological Controls ML20082E2211995-03-31031 March 1995 Rev 1 to Procedure/Work Plan 1903.068, Emergency Response Facility - Emergency News Center ML20081K0331995-03-16016 March 1995 Rev 27 to Procedure/Work Plan 1903.061, Communications Equipment Tests ML20078R0771995-02-0909 February 1995 Rev 21 to Procedure/Work Plan 1903.030, Evacuation ML20078G8921995-01-26026 January 1995 Rev 30 to Procedure/Work Plan 1903.060, Emergency Supplies & Equipment ML20078J1101995-01-13013 January 1995 Public Version of Rev 14 to Operating Procedure 1903.062, Communication Sys Operating Procedure ML20095J6271995-01-0303 January 1995 Permanent Change (Pc) PC-01 to Rev 11 to Procedure/Work Plan OP-1903.065, Emergency Response Facility Tsc 1999-08-04
[Table view] |
Text
- - - . _ __ _ . _ - . - -_
. s o i
Arkansas Nuclear One - Administrative Services Document Control l 1
Procedure / Work Plan / Form l Update Notification !
1 Thursday, December 07,1995 l
COPYHOLDER NO: 103 TO: NRC - WASHINGTON ADDRESS: NRC DOCUMENTNO: OP-1904.002 TITLE: OFFSITE DOSE PROJECTION RDACS COMPUTER METHOD REVISIONNO: 27 CHANGE NO: PC-02 1
SUBJECT:
PERMANENT CHANGE (PC) l l
l l
9512190374 951207 PDR ADOCK 05000313 F PDR -
\
i .
a '
ENTERGY OPERATIONS INCORPORATED ARKANSAS NUCLEAR ONE 61 of 77 O TITLE: orrsiTE ooss enoJacTions noAcs COMPUTER METHOD PROCAWORK PLAN NO.
1904.002 REY.
27 l exP.om s u m .RE w En l em ano
== o=s CONTROLLED COPY # /0J , , , , , ,
suo
" " " ' " " Self Check. 7" 7" 30 57
- 2 21 22 to 40 54 3
Think
" 42 5 24 ~
43
. 2. _Act '
M 1 3 leW ,
s 27 46 :
9 N-l 28 use Nobody's l TIME 47 11 29 VERIFIED SY DATE 48 12 % ~2 30 49 13 9# @ 31
.__ 50 14 @ ' A 32 1
51 15 33 52 16 34 53 4 17 35 54 18 36 g .2 55 19 37 R-%.
FORM NO. REV.
FORM TITLE: 43 PC-1000.006A UST OF AFFECTED PAGES
PRoCm0RK PLAN NO. PROCEDUREMORK PLAN TITLE: PAGE: 12 of 59 1904.002 OFFSITE DOSE PROJE'CTIONS RDACS COMPUTER m: 27 METHOD CHANGE. PC-2 8.0 RDACS MENU STRUCTURE (Continued)
B. Enter Plume Update - this option is used to enter current or forecasted data into the model.
- 1. Update Parameters & Meteorology - this option is used in backup and forecast modes to enter current or forecasted meteorological data.
- 2. Releases from Monitored Points - this option is used in backup and forecast modes to enter current or forecasted radiological data from monitored release points.
- 3. Releases from Unmonitored Points - this option is used in auto, backup and forecast modes to enter current or forecasted radiological data from unmonitored release points.
- 4. Dose Scale Factors - this option is used in auto, backup and forecast modes to enter the current correction factors for matching the models projected data to the actual data measured in the field.
- 5. Isotopic Distributions - this option is used in auto, backup and forecast modes to enter the current isotopic distribution determined by sampling an active release point.
g
- 6. Revise Model Constants - Item not active.
- 7. Execute Model - this option is used in backup and forecast modes to process manually entered data.
C. Display Plume Data - this option is used to view on the screen data processed for each plume segment.
- 1. Emergency Class - this option is used to view the current emergency class calculated by the model after processing is complete.
- 2. Plume Segment Data - this option is used to view the current plume characteristics and parameters for drawing the plume on a ten mile EPZ map.
- 3. Plume Centerline Data - this option is used to view the centerline dose values for a variety of distances down the centerline of the plume.
- 4. Dose Evaluation Points - this option is used to view data calculated at the dose evaluation points for Total Effective Dose Equivalent (TEDE) dose rate, TEDE cumulative dose, Child Thyroid dose rate and Child Thyroid cumulative dose.
t v
PftoCJWoftK PLAN NO. PAN'8mm8JWOftK PLAN TITLE: PAGE: 13 of 59 1904.002 OFFSITE DOSE PROJ$CTIONS RDACS COMPUTER E U METHOD CHANGE. PC-2 8.0 RDACS MENU STRUCTURE (Continued)
- 5. Plume Update Input - thir option is used to view meteorological, radiological, scale factor and isotopic distribution data for the current plume segment.
l D. Print Plume Data - select this option to print data processed for each plume segment.
N
- 1. Routine Reports (prints 2-7) - this option is used to print the entire report for a projected or forecasted plume update.
- 2. Emergency Class - this option is used to print the current emergency class calculated by the model after processing is complete.
- 3. Plume Segment - this option is used to print the current plume characteristics and parameters for drawing the plume on a ten-mile EPZ map.
- 4. Plume Centerline - this option is used to print the centerline dose values for a variety of distances down the centerline of the plume.
- 5. Dose Evaluation Points - this option is used to print data calculated at the dose evaluation points for TEDE dose rate, TEDE cumulative dose, Child Thyroid dose rate and Child Thyroid cumulative dose.
- 6. Plume Parameters and Meteorology - this option is ;
i used to print meteorological data used for a particular plume segment.
- 7. Release Rates - this option is used to print ge radiological data used for a particular plume segment.
k 8. Dose scale Factors and Isotopic Distributions -
this option is used to print the current dose scale factor information as well as isotopic distribution information for each release point.
1
MiocswoRK PLAN NO. PROCEDURE / WORK PLAN TITLE: Pace: 14 of 59 1904.002 OFFSITE DOSE PROJkCTIONS RDACS COMPUTER e 27 METHOD CHANGE: PC 2 8.0 RDACS MENU STRUCTURE (Continued)
E. Protective Action Reconsnendation - This option allows the RDACS user to calculate a protective action based on dose rate and meteorological information.
F. Accept New Update - This option allows the user to accept calculated plume data from the file server in response to a "New Update Available" message.
G. Draw Plume Map - This option allows the user to view a displayed 1, 10 or 50-mile EPE map showing the projected position of a radioactive plume along with dose data and the derived emergency class.
H. Switch operating Modes - This option allows the user l
to switch from one operating mode to another and transfers a user specified number of updates from the current mode of operation to the specified mode of operation.
I. Terminate an Event - This option is used by the Emergency Planning / Computer Support groups to terminate an event once a release has stopped and conditions are favorable to do so (i.e., possible duplication to a backup data source).
> J. RDACS/ Field Data Comparison Sheet - This option prints the most recent RDACS update centerline dose rates to allow the user to log and compare with field team dose rate information. This report also provides a ratio of the RDACS TEDE dose rates to Whole Body Gassna dose Q i rates.
4 k
~
~PROCJWORK PUW NO. PROCEDURE / WORK PUW TITLE: PAGE: 34 Cf 59 1904.002 OFFSITE DOSE PROJkCTIONS RDACS COMPUTER m: 27 METHOD CHANGE. PC-2 9.3.6 Calculate Protective Action Recommendation (PAR)
NOTE Movement on the PAR screen requires the use of the < TAB > key. Data must be entered into the appropriate highlighted areas before RDACS will allow you to proceed to the next step.
7 The Average Release Rate Factor and Expected Release Duration will have to be kl estimated.
A. Request ' Average Release Rate Factor" and " Expected Release Duration" froen one of the following q 1.
- 2. TSC Director
- 3. TSC operations Manager
- Initial Dose Assessor only.
B. Once you have obtained an RDACS " Emergency Class Report" and a "Pitme Map", select Option 5,
" Protective Action Emoomunendation" from the RDACS Subsystem Main Menu and perform the following steps:
- 1. Average Release Rate Factor -
- a. If the release has stopped, then enter "1".
Then depress cah>.
- b. If the release is continuing, quantify the f estimate obtained in step A above, e.g. if g the release is expected to double then entar a factor of "2". Then depress cab >.
- c. If unknown, enter a factor of "l' . Then depress < Tab >.
- 2. Expected Release Duration - Enter duration in hours (20 minutes should be entered as 0.3 hr.)
- a. If the release has stopped, use the actual release duration in hours. Then depress
< Tab >.
- b. If the release is continuing, enter the d estimate in hours obtained in step A above e and then depress < Tab >.
k c. If unknown, enter 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Then depress
< Tab >.
- 3. Current Sky condition - If unknown, move the cursor to the " clear skies" bracket using the arrow keys and then depress the < SPACE > bar.
PnocJWORK PLAN NO. PROCEDURE / WORK PLAN Tm.E: PAGE: 37 of 59 REV: 27 1904.002 OFFSITE DOSE PROJ8CTIONS RDACS COMPUTER METHOD CHANGE: PC-2 9.3.6 Calculate Protective Action Recortunendation ( PAR)
(Continued)
- 4. Wind Direction - Automatically entered. You may overwrite these values as required.
- 5. Centerline Dose Rates - Automatically entered.
You may overwrite these values as required.
- 6. Depress the <r2> key to calculate a Protective Action Reconenendation (PAR) .
- 7. Print the calculated PAR by depressing the <F9>
key.
A g C. Initial Dose Assessor - Remove the last sheet of the RDACS Routine Report, which is the "RDACS/ Field Data j
j comparison Sheet", and throw away this sheet. For the initial PAR and subsequent PARS that change, review the " Emergency Class Report" and PAR with the Shift Superintendent and have the Shift Superintendent sign the PAR and approval sheet at the end of the reports.
! D. Dose Assessment Team - Remove the last sheet of the l M) RDACS Routine Report, which is the "RDACS/ Field Data ,
Comparison Sheet", and route this sheet to the DAT Map l Maker. Then review the RDACS reports, plume map and PAR printed with the DAS and have the DAS sign the PAR and the approval sheet at the end of the reports.
4 E. Following the initial generation of plusse segment data, continue to monitor for releases. As either dk time allows or as the unmonitored release changes, return to Section 9.3 and repeat steps 9.3.1, 9.3.4, 9.3.5, and 9.3.6.
O