ML20096D289

From kanterella
Revision as of 21:45, 1 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Comments & Questions Re Review of Draft Application Format,Content Guidance,Review Plan & Acceptance Criteria for non-power Reactors
ML20096D289
Person / Time
Site: Armed Forces Radiobiology Research Institute
Issue date: 12/07/1995
From: Maria Moore
DEFENSE, DEPT. OF
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9601190076
Download: ML20096D289 (2)


Text

.. .- .- . --

l ,f *"w i -

ARMED FORCES RADIOBIOLOGY. RESEARCH INSTITUTE 8901 WISCONSIN AVENUE k '

BETHESDA. MARYLAND 20889-5603 7 December 1995

SUBJECT:

Draft Application Format and Content Guidance and Review Plan and Acceptance Criteria for Non-Power Reactors Director, Non-Power Reactors and Decommissioning Project Directorate United States Nuclear Regulatory Commission M. S.11-B-20 Washington, DC 20555

Dear Director:

We have reviewed Chapter 11, " Radiation Protection Program and Waste Management" of the draft " Format and Content for Applications for the Licensing of Non-Power Reactors" and the draft " Standard Review Plan and Acceptance Criteria for Applications for the Licensing of Non-Power Reactors."

We find this draft generally clear and workable. We believe it represents an improved mechanism for the preparation, review, and ultimate approval of Safety Analysis Reports (SARs) and licensing applications for non-power reactors. '

i Specific comments and questions related to our review of this document are  !

attached. Please contact Mark Moore, at telephone number (301) 295-5590, if you l have any questions regarding these comments.

IWMitt <

g(MARK L. 00 E Reactor Facility Director Attachments:

(1) Comments on Chapter 11 190014 " o 9601190076 951207 gDR ADOCK05000gO jg

r e

AFRRI COMMENTS SAR REVIEW PLAN AND ACCEPTANCE CRITERIA CHAPTER 11: RADIATION PROTECTION PROGRAM and WASTE MANAGEMENT i l SECTION REQUIREMENT COMMENT SUGGESTION SF&C, p.11-3, 11.1.1. Identification of such The meaning of this section Modify this section to more wastes should indicate is unclear. Is the intent to clearly state the which are associated with distinguish between requirement.

the operation and with the " wastes from operations" utilization of the reactor. versus " wastes from utilization"?

RP&AC, p.11-19 to 20, The review included The meaning of this section Modify this section to 11.1.6.4. provisions for is unclear. clarify.

recordkeeping and historical information about occurrences of radioactive contamination at the facility was examined, which helps confirm that the program is effective.

NOTE: SF&C denotes comments pertaining to the SAR Standard Format and Content RP&AC denotes comments pertaining to the SAR Review Plan and Acceptance Criteria

__ - - _- _ - - ____ _