ML20042E954

From kanterella
Jump to navigation Jump to search
Forwards Changes to Physical Security Plan,Reflecting Upgrade of Security Intrusion Detection Sys,For Review.Encl Withheld (Ref 10CFR2.790)
ML20042E954
Person / Time
Site: Armed Forces Radiobiology Research Institute
Issue date: 05/01/1990
From: Irving G
ARMED FORCES RADIOBIOLOGICAL RESEARCH INSTITUTE
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9005070021
Download: ML20042E954 (1)


Text

($(FR $0.$Yp D$ cur 5006 DEFENSE NUCLEAR AGENCY E

" q' ARuto roncts R AoioslOLOGY RESE ARCH INSTITUTE

{

>q et THE SD A, MARY LAND 20814 6416 -

i' DIR 1 May 1990-Docket Control Desk i

Administrator Nuclear Reactor Regulation U.S.NuclearkegulatoryCommission Washington, D.C.

20555 l

Gentlemen:

I Enclosed please-find the original and two copies of the Armed Forces Radiobiology Research Institute (AFRRI) TRICA Reactor Physical Security. Plan, labeled ' Interim plan.' An analysis of the changes to this plan is also.

enclosed. In accordance with the provisions of -10 CFR 50.54(p) this analysis shows that implementation of this interim physical security plan does not docioase the safeguards effectiveness of the plan in any way. Request that you review the changer to this plan and provide us with any comments concerning l

the plan or the accompanying analysis, i

AFRRI is currently undergoing a physical security Intrusion Detection System (IDS)' upgrade. Although the contractor has assured us that the current IDS for the reactcr will remain fully operational during the installation of the new IDS, we have taken steps to mitigate any unforeseen outages of this sy.. tem.

The reactor staff has installed an internal IDS that can be activated at any time if the current IDS fails. However, activation of this internal IDS required that the current reactor physical security plan be modified.

Therefore, we have made the appropriate modifications to the plan in accordance with 10 CFR 50.54(p) and have labeled the resultant plan ' interim plan' because we do not intend to activate the internal IDS or this ' interim i

plan' unless we have to. As you know, the material contained in our physical security plan and in the analysis documentation is not in the public interest and should be withheld from public disclosure in accordance with 10 CFR 2.7g0.

l If you have any comments or questions concerning this Physical Security Plan or the analyses of the changes made to the plan, please contact either Mark Woore or Major Jim Felty at (202) 295-1290.

Sinc f

s s.*

CEORGE IRVING, III Colon USAF, BSC Olroc r

Enclosures:

as stated CC: Two Copies to Administrator, Region I (ATTN: Safeguards, Mr Della Ratta)

F g

~,.

_ _, _. _.