ML20073D910

From kanterella
Revision as of 17:59, 27 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Submits Comments on Reactor Operator & Senior Reactor Operator Licensing Exams Administered on 910423.Listed Corrections to Written Exam Answer Key Requested
ML20073D910
Person / Time
Site: Armed Forces Radiobiology Research Institute
Issue date: 04/26/1991
From: Maria Moore
ARMED FORCES RADIOBIOLOGICAL RESEARCH INSTITUTE
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9104290289
Download: ML20073D910 (2)


Text

._ _ _ _ _ _ _ - - _ _ _ _ _

DEFENSE NUCLEAR AGENCY ARMED FORCES RADIOBIOLOGY HESEARCH INSTITUTE BETHESDA, MARYLAND 20814 5145

SUBJECT:

Comments on NRC Reactor Operator andi April 26,1991.

Senior Reactor Operator License Exam

- Administered at AFRRI on 23 APR 91

- Docuinent Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

The Armed Forces Radiobiology Research Institute ( AFR RI) TRIG A reactor facility management and NRC Region I operator licensing examiners have reviewed the RO/SRO licensmg exam administered at AFRRI on April 23,1991. Based on this review, the .

, following corrections to the written examination answer key are requested: '

OUESTION COMMENI A.I The correct answer is (C), please change the answer key.

B.4 No correct answer to this question was provided. - Owing to-the possibility of a typographical error, answer (C) should :-

have "RO" replaced by"ROS",

B.18 ' 'The correct answer is.(B), please change the answer key, C.1 Two correct answers were provided for this question. Please give credit for either (B) or (C)

C.7 The answer to this question is acceptable. It should be noted, . f however, that at pool water temperatures achieved in the AFRRI TRIG A reactor facility iodine is soluble and will therefore not be released into the' atmosphere.

C.9 Two correct answers were provided for this question.- Please give credit for either (A) or (D)-

4 9t042902sp 9t0426

'{DR ADOCK 05000.tyo a v ,,. t. c eDn

'hN :

r ojo

4 4

9 If you have any questions or comments, please contact the Reactor Facility Director, Mr-Mark Moore, or the Reactor Executive Officer,1st Lt Matt Forsbacka, at (301) 295-1290.

Thank you for your cooperation.

1 Sincerely, s

'yqf M ARK MOORE Reactor Facility Director

Enclosure:

as stated cc: USNRC - Region 1 - Project Engineer .

Division of Reactor Projects t

u USN RC - Headquarters - Project Manager Nuclear Reactor Regulation J

_. - - ______ _ -_ . . _ _ _ _ - - . - - - - - _ . _ . _ - _ _ _ _ . _ - _ _ _ - _ . - _ - _ _ _ _ - - . . _ , _ - _ . _ _ . _ . _