ML20073G282

From kanterella
Revision as of 15:01, 27 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rept of Facility Changes,Tests & Experiments, 1982. Rept Lists All Challenges to PORVs & Safety Valves, Per NUREG-0737,Item II.K.3.3
ML20073G282
Person / Time
Site: Beaver Valley
Issue date: 03/29/1983
From: Carey J
DUQUESNE LIGHT CO.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20073G285 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.03, TASK-TM NUDOCS 8304180238
Download: ML20073G282 (2)


Text

____-___ - - - - _ _ _ _ - - _ _______- - _ ---__-__ - -__--__-________ - ___ _ __-

s vgf Telephone (41J) 393-6000 Nuclear Division P.O. Box 4 Shippingport, PA 15077-0004 March 29, 1983 U. S. Nuclear Regula' tory Commission Office of Inspection and Enforcement Attn: R. C. Haynes, Regional Administrator Region 1 631 Park Avenue King of Prussia, PA 19406 Ecference: Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 1982 Report of Facility Changes, Tests and Experiments Centlemen:

In accordance with 10 CFR 50.59, enclosed is the Beaver Valley Power Station, Unit No. 1 annual Report of Facility Changes, Tests and Experiments for 1982. This report covers 1/1/82 to 1/22/83 to coin-cide with the annual FSAR update. In accordance with NUREG-0737, Item II.K.3.3, page 27 of this report lists all challenges to the PORV and Safety Valves that occurred.

Very truly yours, l

J. . Carey Vice President, Nuclear cc: Director of Nuclear Reactor Regulation (39)

U. S. Nuclear Regulatory Commission Attn: Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement Washington, DC 20555 Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 l r l

V 8304180238 B30329 PDR ADDCM 05000334 f R PDR 1

BIcysr Vollsy Powsr Station, Unit No.1

, Dockat No. 50-334, License No. DPR-66 1982 Report of Facility Changes, Tests and Experiments Page 2 Mr. P. Tam, Project Manager U . S. Nuclear Regulatory Commission Phillips Building Washington, DC 20555

- Mail Stop 438 U. S. Nuclear Regulatory Commission c/o Document Management Branch Washingten, DC 20555