ML20080K318

From kanterella
Revision as of 18:26, 21 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 1 to SPP-0001, Corrective Action Plan for Safety-Related 4.16 Kv Switchgear. Procedure Will Be Used by All Project Organization Elements W/O Deviation
ML20080K318
Person / Time
Site: Perry, Harris  Duke Energy icon.png
Issue date: 03/18/1982
From: Farrell R
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Barkley B, Bellack J, Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20079G896 List:
References
FOIA-83-199 NUDOCS 8309290107
Download: ML20080K318 (1)


Text

e THE CLEVELAND ELECTRIC ILLUMINATINCE COMPANY kL, ..,. MEMDRANDUM ~

ya B. L. Barkley ,oog W220 rnow R. L. Farrell o4Tc March 18, 1982 J. Bellack R230 psong 346 noog S260 M. R. Edelman $270 suvacci CORRECTIVE ACTION PLAN FOR L. E. Hartline S210 SAFETY-RELATED 4.16kv SWI,TCHGEAR J. A. Kline W110 s M. Lastovka S210 P. P. Martin W160 E. Riley W115 R. L. Vondrasek S150 B. Walrath W170 Attached to this , memorandum is the approved Corrective Action Plan for safety-related 4.16kv switchgear. This Corrective Action Plan describes the procedure to be used to install the Unit #1 4.16kv switchgear.

The procedure will be used by all Project Organization elements without deviation.

Any answers to quesi. ions or interpretation of this procedure that are required will be supplied by Mr. John Marjenin and only by him.

This procedure will be added to the Project Administration manuals as quickly as possible, in the appropriate place. However, it is effective immediately.

. ,[' ,

i R. L. Farrell, Manager Nuclear Quality Assurance Department RLF/llp _-

/ HIATT83-199

._ _ _-_ -_ _ _