Rev 1 to SPP-0001, Corrective Action Plan for Safety- Related 4.16 Kv Switchgear. Related Info EnclML20080K332 |
Person / Time |
---|
Site: |
Perry |
---|
Issue date: |
03/18/1982 |
---|
From: |
CLEVELAND ELECTRIC ILLUMINATING CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20079G896 |
List: |
---|
References |
---|
FOIA-83-199 SPP-0001, SPP-1, NUDOCS 8309290113 |
Download: ML20080K332 (54) |
|
Similar Documents at Perry |
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20216E4791999-09-0909 September 1999 Proposed Tech Specs Revising Allowable Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons ML20216E4631999-09-0909 September 1999 Proposed Tech Specs Change Eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula,Since Corbicula & Zebra Mussels Have Already Been Identified & Control & Treatment Plans Are Implemented ML20211P2871999-09-0909 September 1999 Proposed Tech Specs Pages,Increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal ML20210M7851999-08-0404 August 1999 Proposed Tech Specs 3.9.1,incorporating Addl Option Into Required Actions When Refueling Interlocks Are Inoperable ML20209B3391999-06-28028 June 1999 Simulator Four Yr Test Rept ML20196A2021999-06-17017 June 1999 Proposed Tech Specs SRs Implementing 24-month Operating Cycle at Pnpp ML20205C6351999-03-16016 March 1999 Preliminary Rev 0 to Wps 01-43-T-801, Preliminary Weld Procedure for Perry Nuclear Power Plant Feedwater Nozzle Repair ML20204E4971999-03-15015 March 1999 Proposed Tech Specs,Correcting Typos Found in Table 3.3.6.1-1 ML20207K1041999-03-0404 March 1999 Proposed Tech Specs Improving Licensing & Design Basis for Isolation of FW Penetrations ML20206Q3571999-01-0606 January 1999 Proposed Tech Specs Improving Licensing & Design Basis for Isolation of Feedwater Penetrations ML20195H5381998-11-18018 November 1998 Rev 4 to Pump & Valve Inservice Testing Program Plan ML20155D9431998-10-27027 October 1998 Proposed Tech Specs 2.1.1.2,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by GE ML20155D8241998-10-27027 October 1998 Proposed Tech Specs Adding Two Paragraphs to TS 5.2.2.e, Organization - Unit Staff ML20196H5131998-10-0808 October 1998 Rev 4,Vol 1 to Inservice Exam Program for Perry Nuclear Power Plant ML20151V4831998-09-0909 September 1998 Proposed Tech Specs Stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Check Valves Do Not Need to Be Included in Hydrostatic Program ML20151V6861998-09-0303 September 1998 Proposed Tech Specs Increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Volume Due to Vortex Formation at Eductor Nozzles Located in Fuel Oil Storage Tank ML20151V1111998-09-0303 September 1998 Proposed Tech Specs Permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allowing Performance of EDG 24-hour TS SR Test in Modes 1 & 2 PY-CEI-NRR-2395, Rev 5 to Perry NPP Odcm. with1998-09-0202 September 1998 Rev 5 to Perry NPP Odcm. with ML20151S9561998-08-31031 August 1998 Proposed Tech Specs,Allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be Operable ML20236T7911998-07-22022 July 1998 Proposed Tech Specs Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys ML20151P1921998-07-13013 July 1998 Proposed Tech Specs,Increasing Present +/- 1% Tolerance on Safety Mode Lift Setpoint for SRVs to +/- 3% ML20236H8411998-06-30030 June 1998 Proposed Tech Specs,Increasing Boron Concentration in Standby Liquid Control Sys for Pnpp Cycle 8 Fuel Design & Providing Margin for Future Cycles as Required ML20236T8451998-06-24024 June 1998 Rev 3,Change 3 to Vol 1 of Inservice Examination Program, for Pnpp ML20216H9361998-04-14014 April 1998 Rev 1 to Proposed TS Bases,Reflecting Changes Made Since Original Implementation of TS in Improved Format in June 1996 ML20203G4781998-02-23023 February 1998 Maint Progress Review for Perry Nuclear Power Plant ML20197F7871997-12-23023 December 1997 Proposed Tech Specs,Revising 3.8.1 Re AC Sources to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs ML20217K6501997-10-22022 October 1997 Proposed Tech Specs Incorporating Temp Control Valves & Associated Bypass Lines Around Emergency Closed Cooling Sys Heat Exchanger ML20217F5911997-10-0202 October 1997 Proposed Tech Specs,Adding Note to TS 2.1.1.2 Re MCPR SL Values & Adding Footnote to TS 5.6.5.b to Reference NRC SER That Approved MCPR SL Values for Cycle 7 ML20210U8701997-09-0808 September 1997 Rev 3,change 2 to Vol 1 of Inservice Exam Program, for Pnpp ML20210T9631997-09-0808 September 1997 Proposed Tech Specs 5.2.2.e,removing Reference to NRC Policy Statement on Working Hours.Rev Allows Changes to Specific Overtime Limits & Working Hours to Be Evaluated IAW 10CFR50.59, Changes,Tests & Experiments ML20217Q4591997-08-28028 August 1997 Proposed Tech Specs 3.4.11,revising Pressure-Temp Limits,Per Reactor Vessel Matl Surveillance Program Requirements Contained in App H of 10CFR50.90 ML20148A6871997-05-0202 May 1997 Proposed Tech Specs Re Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria ML20148A6591997-05-0202 May 1997 Proposed Tech Specs,Revising Existing Exception to LCO 3.0.4 as Applies to LCO 3.6.1.9 for MSIV Leakage Control Sys ML20137S7761997-04-0909 April 1997 Proposed TS Requirements 3.9.1.1 & 3.9.2.2 Re Frequency on Refueling Equipment & one-rod-out Interlocks ML20134D8251997-01-31031 January 1997 Proposed Tech Specs 1.1 Re definitions,3.6.1.1 Re Primary Containment - operating,3.6.1.2 Re Primary Containment Air locks,3.6.1.3 Re PCIVs,3.6.5.1 Re Drywell & 5.5 Re Programs & Manuals ML20147B8271997-01-24024 January 1997 Rev 3 to Vol 1 of Inservice Exam Program ML20134D8751996-10-24024 October 1996 Proposed Tech Specs 2.1.1.2,safety Limits Applying Conservatism by Increasing MCPR Safety Limit Values ML20117E7891996-08-27027 August 1996 Proposed Tech Specs,Revising Mls Leakage Requirements & Eliminating MSIV Control Sys ML20108A2581996-04-26026 April 1996 Proposed Improved Tech Specs ML20100N9501996-03-0101 March 1996 Proposed TS Pages Re Drywell Leak Rate Testing Requirements ML20100L3331996-02-27027 February 1996 Proposed Tech Specs Re Drywell Personnel Air Lock Shield Door Analyses ML20100J5971996-02-24024 February 1996 Proposed Tech Specs,Revising Definition of Core Alteration ML20149K2221996-02-17017 February 1996 Proposed Tech Specs,Reflecting Mod of Leakage Rate Requirements for Main Steam Lines Until End of Operating Cycle 6 ML20100G0161996-02-0101 February 1996 Draft Rev 0 to Pnpp NUMARC/NESP-007 Plant-Specific EAL Guidelines ML20096D4651996-01-16016 January 1996 Proposed TS Requirements for Drywell Leak Rate Testing ML20096C0591996-01-10010 January 1996 Proposed Tech Specs,Requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 960127 ML20095H4721995-12-20020 December 1995 Proposed Tech Specs Re Replacement of Selected Analog Leak Detection Sys Instruments W/Ge Numac Leak Detection Monitor ML20108B2851995-11-22022 November 1995 Rev 5 to Offsite Dose Calculation Manual ML20094F2051995-11-0202 November 1995 Proposed Tech Specs for Handling Irradiated Fuel in Containment or Fuel Handling Bldg & Performing Core Alterations ML20094E6751995-11-0202 November 1995 Proposed Tech Spec,Requesting Rev to TS for Onsite Power Distribution Sys:Ts 3/4.8.3.1, Distribution - Operation 1999-09-09
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20205C6351999-03-16016 March 1999 Preliminary Rev 0 to Wps 01-43-T-801, Preliminary Weld Procedure for Perry Nuclear Power Plant Feedwater Nozzle Repair ML20195H5381998-11-18018 November 1998 Rev 4 to Pump & Valve Inservice Testing Program Plan ML20196H5131998-10-0808 October 1998 Rev 4,Vol 1 to Inservice Exam Program for Perry Nuclear Power Plant PY-CEI-NRR-2395, Rev 5 to Perry NPP Odcm. with1998-09-0202 September 1998 Rev 5 to Perry NPP Odcm. with ML20236T8451998-06-24024 June 1998 Rev 3,Change 3 to Vol 1 of Inservice Examination Program, for Pnpp ML20203G4781998-02-23023 February 1998 Maint Progress Review for Perry Nuclear Power Plant ML20210U8701997-09-0808 September 1997 Rev 3,change 2 to Vol 1 of Inservice Exam Program, for Pnpp ML20147B8271997-01-24024 January 1997 Rev 3 to Vol 1 of Inservice Exam Program ML20100G0161996-02-0101 February 1996 Draft Rev 0 to Pnpp NUMARC/NESP-007 Plant-Specific EAL Guidelines ML20108B2851995-11-22022 November 1995 Rev 5 to Offsite Dose Calculation Manual ML20087D7971995-07-0707 July 1995 Vol 1 to Rev 3, Perry Nuclear Power Plant Inservice Exam Program ML20108B2821995-03-29029 March 1995 Rev 6 to Process Control Program ML20082C2751995-03-29029 March 1995 Rev 5 to Odcm ML20082C2771995-03-29029 March 1995 Rev 6 to Process Control Program ML20085A0501995-02-0707 February 1995 Rev 2 to ISI Exam Program ML20083A8611994-10-20020 October 1994 Rev 2 to Plant Administrative Procedure PAP-0806, Oil/ Chemical Release Contingency Plan ML20101B7951994-10-14014 October 1994 Partially Withheld Rev 19 to Security Plan PY-CEI-NRR-1827, Revised Emergency Public Info Organization Implementing Instruction Manual Including,Temporary Change Number,(Tcn) TCN-1 to Rev 10 to Instruction 1,TCN-2 to Rev 20 to App B & TCN-4 to Rev 0 to App I-B1994-07-18018 July 1994 Revised Emergency Public Info Organization Implementing Instruction Manual Including,Temporary Change Number,(Tcn) TCN-1 to Rev 10 to Instruction 1,TCN-2 to Rev 20 to App B & TCN-4 to Rev 0 to App I-B ML20065E9341994-04-0505 April 1994 Rev 3 to Pump & Valve IST Program Plan ML20101B7841994-04-0101 April 1994 Partially Withheld Rev 18 to Security Plan ML20063K7171994-01-17017 January 1994 Rev 2,Temporary Change 1 to Vol 1 of Inservice Exam Program PY-CEI-NRR-1741, Changes to Emergency Public Info Organization...Instruction Manual, Including Rev 20 to JPC-App B,Temporary Change 2 to Rev 9 to Instruction 9 & Temporary Change 2 to Rev 8 to Instruction 81994-01-13013 January 1994 Changes to Emergency Public Info Organization...Instruction Manual, Including Rev 20 to JPC-App B,Temporary Change 2 to Rev 9 to Instruction 9 & Temporary Change 2 to Rev 8 to Instruction 8 PY-CEI-NRR-1736, Temporary Change 1 to Rev 0 to App H of Emergency Public Info Organization Instructions Manual1993-12-20020 December 1993 Temporary Change 1 to Rev 0 to App H of Emergency Public Info Organization Instructions Manual ML20063L1501993-12-16016 December 1993 Rev 1,to Industrial Radiography Program PY-CEI-NRR-1715, Temporary Change 3 to Rev 1 to Emergency Public Info Organization Instructions Manual1993-10-26026 October 1993 Temporary Change 3 to Rev 1 to Emergency Public Info Organization Instructions Manual ML20058N3951993-10-11011 October 1993 Inservice Examination Program, Rev 2 ML20045J2511993-07-15015 July 1993 Revised Emergency Public Info Organization Implementing Instruction Manual,Including Temporary Change (TC) 2 to Rev 1 of App D,Tc 2 to Rev 0 of App I,Part A,Pages 1-2 & 3-4 & TC 3 to Rev 0 of App I,Part B,Page 19-20.W/930715 Ltr ML20045D4011993-06-16016 June 1993 Revised Emergency Public Info Organization Implementing Instruction Manual,Including Temporary Change Number (Tcn) TCN-1 to Rev 8 to Section II,TCN-1 to Rev 1 to Section IV & TCN-1 to Rev 8 Instruction 5.W/930616 Ltr ML20138D1831993-01-14014 January 1993 Rev 2 to Perry Operations Manual,Inservice Exam Program ML20101B7811992-11-20020 November 1992 Partially Withheld Rev 17 to Security Plan ML20118A8331992-09-22022 September 1992 Revised Emergency Public Info Organization Implementing Instructions Manual,Including Rev 17 to JPC-App-B,Rev 9 to JPC-Instruction 1,TC-1 to JPC-Instruction 2 & Rev 8 to JPC-Instruction 3 ML20045B3441992-07-31031 July 1992 Temporary Change 1 to Rev 1 to Perry Operation Manual OM1A:PAP-0806, Oil/Chemical Release Contingency Plan. ML20101B7871992-04-27027 April 1992 Partially Withheld Rev 17 to Security Plan PY-CEI-NRR-1445, Rev 15 to Emergency Public Info Organization Instructions Manual App B, Personnel/Access List1992-02-12012 February 1992 Rev 15 to Emergency Public Info Organization Instructions Manual App B, Personnel/Access List ML20044G8151992-01-10010 January 1992 Rev 1 to Perry Operations Manual OM1A:PAP-0806, Oil/ Chemical Release Contingency Plan. ML20091K4861992-01-0303 January 1992 Rev 1 to Inservice Exam Program ML20082P8911991-09-0404 September 1991 Rev 0 to Temporary Instruction TXI-0122, Zebra Mussel Treatment PY-CEI-NRR-1366, Apps B & D to Emergency Public Info Organization Instructions Manual1991-06-14014 June 1991 Apps B & D to Emergency Public Info Organization Instructions Manual ML20029B1571991-02-27027 February 1991 Revised Emergency Public Info Organization Instructions Manual. W/910227 Ltr ML20077J9691990-12-31031 December 1990 Rev 3 to Pump & Valve Inservice Testing Program Plan ML20028H7581990-12-26026 December 1990 Emergency Public Info Organization Instructions Manual,App B, Personnel/Access Lists. W/910124 Ltr ML20058E8131990-10-17017 October 1990 Instruction II to Rev 8 to Emergency Public Info Organization Instructions Manual, Purpose,Scope,Company Policy,Responsibilities & Refs ML20058E8041990-10-17017 October 1990 Instruction I to Rev 8 to Emergency Public Info Organization Instructions Manual, Manual Distribution PY-CEI-NRR-1223, Rev 11 to Emergency Public Info Organization Implementing Instruction Manual,App B, Personnel/Access Lists1990-09-10010 September 1990 Rev 11 to Emergency Public Info Organization Implementing Instruction Manual,App B, Personnel/Access Lists ML20058L1721990-05-30030 May 1990 Rev 0 to Inservice Exam Program ML20043A6501990-05-14014 May 1990 Revised Emergency Public Info Organization Implementing Instructions Manual. W/900514 Ltr ML20248H2481989-10-0202 October 1989 Rev 2 to Pump & Valve Inservice Testing Program Plan ML20246K8101989-08-14014 August 1989 Temporary Change Notice 6 to Rev 3 to OM12D:ODCM, Odcm ML20246K8021989-02-25025 February 1989 Temporary Change Notice 5 to Rev 3 to OM12D:ODCM, Odcm ML20101B7911989-01-16016 January 1989 Partially Withheld Rev 12 to Security Plan 1999-03-16
[Table view] |
Text
.
' SPP-0001
- Pagt: 'i Rev.: 1 THE CLEVELAND ELECTRIC ILLUMINATING COMPANY ,
PERRY NUCLEAR POWER PLANT i.
SPECIAL PROJECT PLAN il TITLE: Corrective Act. ion Plan for Safety Related 4.16kv Switchgear REVISION: 1 EFFECTIVE DATE: March 18,1982 SUBMITTED:
M.R.ED LMA APPRCVED: bef-.,.e a rme,t, S /F - 62. Date DGrWsanger - Nuclear Engineering Department APPROVED: < 4/Bl.//
Mahager - Nbcleir Quality Assurance Department e
b rx
- s e
a 8309290113 830622 PDR FOIA HIATT83-199 PDR ,
, SPP-001
, , Riv. 1 Effectiva 3/18/82
'Page 1 of 3 CORRECTIVE ACTION PLAN FOR SAFETY-RELATED 4.16kv SWITCHGEAR A
~
PURPOSE To describe the corrective action plan necessary to complete installation, inspection and initial check-out testing of 4.16kv safety-related switchgear.
1 RESPONSIBILITIES AND PROCEDURE This special project plan applies to the administration, implementation and documenta-tion of corrective action necessary to complete installation, inspection and initial check-out testing of Perry Nuclear Power Plant Unit 1, safety-related 4.16kv switch-gear. It also applies to Unit 2, safety-related 4.16kv switchgear prior to turnover to the Nuclear Test Section (NTS), with the exception of the hold-down welds which apply to each switchgear section. It does not apply to individual breaker compartments which have been scoped within the boundaries of the " user" systems and are not con-
, sidered a part of the 4.16kv safety-related switchgear system.
1 The General Supervisors of each Project Organization element discussed in this correc-tive action plan are responsible for implementation of applicable portions of this plan within their elements.
The Supervisor, Electrical and 16C Construction Quality Engineering, is responsible to ensure all elements of this plan are implemented in a timely manner by the responsible Project Organization elements.
1 REQUIRED CORRECTIVE ACTION
- 1. NTS shall prepare Work Authorization (s) per PA-1107, as required, to cover remaining L. K. Comstock (LKC) original scope work in complete compliance with LKC QA Program.
- 2. De-energize switchgear in ac,cordance with the pro-visions of PA-1104 and PA-1107.
- 3. LKC shall inspect switchgear in accordance with cur-rent GAI/Gould drawings and document the results of their inspection per LKC procedure 4.3.4.
- 4. NTS shall wire-check switchgear in accordance with current GAI/Gould drawings and document the results per NTS procedure GEN-E-04. -
e e e e
SPP-001 i
'
- Rsv. 1 Effective 3/18/82 Page 2 of 3
- 5. NTS shall review all previously identified hrs in order to account for all open switchgear NR6.
~
- 6. NTS shall review their maintenance program to ensure -
that appropriate maintenance activities have been .
performed. Sheuld any maintenance activities be required, they shall be performed and documented at this time in accordance with PM requirement sheet and vendor's instruction manual.
- 7. Construction Quality Assurance (CQA) shall provide surveillance of LKC activities per CQA 2-1001 and review LKC documentation per CQA 2-1702.
- 8. Program Quality Assurance (PQA) shall provide sur-veillance of NTS activities per PQA 1-1033 and review NTS documentation per PQA 11-1101.
- 9. Nuclear Desig'n Section (NDS) shall satisfactorily resolve and ensure clear definition of manufacturer's '
concurrence with NDS proposed welding repair / rework, bolting and leveling in compliance with seismic design requirements. This shall include field inspection by a qualified manufacturer's representative, as required, to ensure acceptability of all proposed dispositions.
- 10. CQA and PQA shall ensure that the status of all switch-gear NRs is documented,
- 11. LKC/NDS/NTS shall disposition all switchgear NRs with Review Board concurrence. Approved NR dispositions shall be implemented to the extent practical.
- 12. NDS shall establish weld rod control and traceability requirements for eventual inecrporation in L1'.C pro-cedure 4.7.6. ,
- 13. LKC revise and NDS and CWA approve veld procedure .
- 4.7.6 and' magnetic particle inspection procedure 4.7.8.
- 14. CQA close-out CARS 82-06 and 82-07 and issue stop work release.
- 15. LKC rework / repair switchgear welds when items 9,11 and 14 are satisfactory.
- 16. Close out work authorization per PA-1107. -
- p
---v,- - - , ,, - - ------ w ----- , - - -
,,---w ----
4 e 6 s
SPP-001 l Rev. 1 Effective 3/18/82 '
Page 3 of 3 Re-energize switchgear only af ter LKC/NTS evalue- .-
17.
tion of switchgear installation, inspection, test
NOTE: Weld repair / rework need not be completed prior to re-energization as proposed fix is to take place on outside of switchgea,.,r gdMIa$/d Should weld repair be required to the switchgear .svudm. A second '
outage may be required and will be taken to complete this work within a reasonable period after appropriate approvals and stop work release.
4 Oh e.,_ -% .4, .t My.u ke Edeli YN4yb'ea (/cyop4 wf G Nm D )