ML20086G277

From kanterella
Revision as of 12:54, 15 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Corrected Copy of Monthly Operating Rept for Apr 1995 for Cooper Nuclear Station
ML20086G277
Person / Time
Site: Cooper Entergy icon.png
Issue date: 04/30/1995
From:
NEBRASKA PUBLIC POWER DISTRICT
To:
Shared Package
ML20086G214 List:
References
NUDOCS 9507140207
Download: ML20086G277 (1)


Text

,_ . .. . .. . . . ~ . . . , - - - - _ - -

s..

OPERATING' DATA REPORT

?

DOCKET NO. 050-0298  !

UNIT CNS DATE July 10. 1995 l

OPEEATING STATUS TELEPHONE f402) 825-5295 l i

1. Unit Name: Cooner Nuclear Station Notes  ;
2. Reporting Period: Anril 1995 i
3. Ucensed Thermal Power (MWt): 2381  ;
d. Nameplate Rating (Gross MWe): 836 f
5. Design Electrical Rating (Net MWe): 778
8. Maximum Dependable Capacity (Gross MWe): 787

- 7. Maximum Dependable Capacity (Net MWe): 764  !

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: l I

i

9. Power Level To Which Restricted, if Any (Net MWe):
10. Reasons For Restriction, if Any:  !
}

This Month Yr.-to-Date Cumulative

11. Hours 6n Reporting Period 719.0 2.879.0 182.616.0 l
12. Number of Hours Reactor Was Cruical 719.0 1.763.0 134.953.2
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 719.5 1.640.5 132.919.8  ;

i

16. Unit Reserve Shutdown Hours 0.0 0.0 0.0 j 1.705.392.0 3.800.264.0 18, Gross Thermal Energy Generated (MWH) 275.111.508.0
17. Gross Electric Energy Generated (MWH) 565.233.0 1.249.348.0 89.367.693.0
18. Net Electric Energy Generated (MWH) 547.512.0 1.209.675.0 86.308.113.0
19. Unit Service Factor 100.0 57.0 72.8
20. Unit Availability Factor 100.0 57.0 72.8
31. Unit Capacity Factor (Using MDC Net) 99.7 55.0 61.9
23. Unit Capacity Factor (Using DER Net) 97.9 54.0 60.7
23. Unit Forced Outage Rate 0.0 43.0 8.7 24, Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refuelino Outaae. October 1995.

35. - if Shut Down At End of Report Period, Estimated Date of Startup: N/A I- 36. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY I

INITIAL ELECTRICITY COMMERCIAL OPERATION 9507140207 950710 PDR ADOCK 05000298

, R PDR

. _. _ _