ML20237C059
| ML20237C059 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 07/31/1998 |
| From: | Carroll C, Peckham M NEBRASKA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-97-02, GL-97-2, NLS980132, NUDOCS 9808200179 | |
| Download: ML20237C059 (4) | |
Text
- - _ - _ _ _
N
~
Nebraska Public Power District Nebraska's Energy Leader g,g August 13, 1998 U.
S. Nuclear Regulatory Commission Attention: Document Control Desk washington, D.C.
20555-0001 Gentlemen:
I
Subject:
Monthly Operating Status Report for July 1998, Docket No. 50-298.
Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for July 1998.
In accordance with the guidance provided by Generic Letter 97-02, this report includes an Operating Data Report and Unit Shutdown Report for the month of July.
Should you have any comments, or require additional information regarding this report, please contact me.
Sincerely, ff M
M.
F.
Peckham Plant Manager MFPilb Enclosures cc: ANI Librar'f R.
W. Beck and Associates J.
M.
Cline l
A. L. Dostal J.
W.
Dutton l
M.
G.
Farschon R.
L..Gumm j
INPO Records Center R.
P.
Kosch E. A.
Lanning T.
LaPorte o
B. Lewis LVV
W.
R.
Mayben NRC Regional Administrator h[
/
NRC Senior Resident Inspector Q
E.
Pasche
/
R.
D.
Stoddard J. H.
Swailes W.
Turnbull Cooper Nudear Station PO. Box 98/ Brownville, NE 68321D098 Telephone: (402) 825-3811/ Fax: (402) 825-5211
~
- #~ ""
9908200179 990731 PDR ADOCK 05000299 R
PDR:
T i
APPENDIX A OPERATING DATA REPORT DOCKET NO.
0504 298 UNIT NAME Cooper Nedcar Station DATE 8/13/98 COMPLETED 11Y C. P. Carroll TELEPIlONE (402) $25-5487 Reporting Period:
July 1998 This Month Yr.-to-Date Cumulative 1.
Design Electrical Rating (Net MWe).
778 N/A N/A The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
2.
Maximum Dependable Capacity (Net MWe)-
764 N/A N/A The gross electrical output as measured at the output terminals of the turbine-generator during the most restrictive seasonal conditions minus the normal station service loada 3.
Number ofIlours the Reactor Was Critical.
744 0 4.775 9 159.815 6 The total number of hours during the gross hours of the reporting period that the reactor was critical.
4.
Number of flours the Generator Was On Line.
744 0 4,746 5 157,567 8 (Also called Service llours). The total number of hours during the gross hours of the reporting period that the unit operated with the breakers closed to the station bus.
The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
5.
Unit Reserve Shutdown llours.
00 00 00 The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
6.
Net Electrical Energy (MWII) 558,470 0 3,569.642 0 104,590 365 6 The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega-watt hours Negative quantities should not be used.
8/6/96 7:44 AM
r8C8 2 e 0 p3
.)
o3P2 05 o1 0
0C8C4
/
(
Y B
^
D E OE S
E N T
N M T O N
T A E
E L H M
E N P P K E E
M T
CI TM L O
ONAOE C
DUDCT
.re wop decu der ta de mro frep sa w
e S
c N
n a
)
BW 2
n
(
e t
r n
X O o
t ia D
c I
a m
PT eR d
hU n
na EH wo g
P S D
n P
it A T se I
t N
e c
U n
)
I a
l
(
l ie n
o v
s r
a e
us R
d e
n n
a s
)
l P
ruo 1
h 1(
tn n
o o
i m
t e
a r
u h
t 8
D r
99 o
1 t
s ly o
u m
J ro r
D r
E e
w l
Dt o
E D p
CE l
n Rl l
o i
u OC f
ita f S t
n a
i d
m FS e
a t
)
E
)
x ar s
n ep i
e ia a
s o
lp n
tp e
x nc s
t te n
E( t iU E
o m
a a
s t
g r
a
(
D lp rT ic/
e e u
r n o
mr l
i c
t r) a N
h i r s i r n rS
)
T e
l o
ei e n
a vEi c p i
T F e Rari Si m
a O
t a
yTa l lp t
a
/pTol r
c na n
r r nx ir e s g rt p
M mel i
el a n toe o
i (
i ct Y
- pt int o s n
Tit x
s at a uE T
ni n s uri r e d l la a r
- a mirm R
o A
R oui f ge meh o m u A
s qa e e pd pt ot e
/
h m n tu ot O
N N
ah aEMRROA OO t a a M
e et M
R - - - - - -
I MSMACO P
E ABCDEFGI U
)
t 2)1 2345 R
S
(
(
il
l ATTACHMZNT 3 LIST OF NRC COMMITMENTS l
correspondence No: NLS980132 The following table identifies those actions committed to by the District in this 1
document. Any other actions discussed in the submittal represent intended or planned actions by the District.
They are described to the NRC for the NRC's information and are not regulatory commitments.
Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITTED DATE COMMITMENT OR OUTAGE None l
PROCEDURE NUMBER 0.42 l
REVISION NUMBER 6 l
PAGE 9 OF 13 l
- - _.