 Issue dateTitleTopic
ML20212K97830 September 1999Safety Evaluation Accepting USI A-46 Implementation ProgramSafe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Earthquake
ML20217A99330 September 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data
ML20217G74630 September 1999Monthly Operating Rept for Sept 1999 for Cooper Nuclear Station
ML20217A16922 September 1999Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers
ML20212C50031 August 1999Monthly Operating Rept for Aug 1999 for Cooper Nuclear Station
ML20211D64925 August 1999Part 21 Rept Re Nonconformance within LCR-25 safety-related Lead Acid Battery Cells Manufactured by C&D.Analysis of Cells Completed.Analysis of Positive Grid Matl Shows Nonconforming Levels of Calcium within Positive Grid Alloy
ML20210R03831 July 1999Monthly Operating Rept for July 1999 for Cooper Nuclear Station
ML20210J29229 July 1999Special Rept:On 990406,OG TS & Associated Charcoal Absorbers Were Removed from Svc.Caused by Scheduled Maint on Hpci. Evaluation of Offsite Effluent Release Dose Effects Was Performed to Ensure Plant Remained in Compliance
ML20209H82815 July 1999Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Cooper Nuclear StationPower-Operated Valves
Backfit
ML20211A99812 July 1999Draft,Probabilistic Safety Assessment, Risk Info Matrix, Risk Ranking of Systems by Importance Measure
ML20196H86230 June 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 ReptHigh Radiation Area
Power change
ML20209E10630 June 1999Monthly Operating Rept for June 1999 for Cns.With
ML20196B38517 June 1999Summary Rept of Facility Changes,Test & Experiments,Per 10CFR50.59 for Period 970901-990331.Summary of Commitment Changes Made During Same Time Period Also EnclHot Short
Safe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Grab sample
Fire Barrier
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Coatings
Temporary Modification
Emergency Lighting
Incorporated by reference
Condition Adverse to Quality
Missed surveillance
Abnormal operational transient
Corrosion bonding
Design basis earthquake
Foreign Material Exclusion
Scram Discharge Volume
Feedwater Controller Failure
Severe Accident Management Guideline
Rod Drop Event
Earthquake
Fuel cladding
Through Wall Leak
Offsite Circuit
Continuous fire watch
Fire Protection Program
Fire Watch
Scaffolding
Grace period
ML20195K28531 May 1999Monthly Operating Rept for May 1999 for Cooper Nuclear Station.With
ML20206P04812 May 1999Safety Evaluation Concluding That NPP Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at CNS & Adequately Addressed Actions Requested in GL 96-05Stroke time
Past operability
ML20206J0814 May 1999Rev 14 to CNS QA Program for OperationSafe Shutdown
Nondestructive Examination
Temporary Modification
Foreign Material Exclusion
Backfit
ML20206P97530 April 1999Monthly Operating Rept for Apr 1999 for Cooper Nuclear Station
ML20205Q08931 March 1999Monthly Operating Rept for Mar 1999 for Cooper Nuclear Station.With
ML20204G89515 March 1999CNS Inservice Insp Summary Rept Fall 1998 Refueling Outage (RFO-18)Hydrostatic
Nondestructive Examination
VT-2
Finite Element Analysis
Liquid penetrant
ML20207M92312 March 1999Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results
ML20204B37011 March 1999SER Accepting Third 10-year Interval Inservice Insp Plan Requests for Relief for RI-17,Rev 1 and RI-25,Rev 0.Request for Relief RI-13,Rev 2 Involving Snubber Testing & Is Being Evaluated in Separate ReportScaffolding
ML20204C97528 February 1999Monthly Operating Rept for Feb 1999 for Cooper Nuclear Station
ML20199E67514 January 1999Monthly Operating Rept for Dec 1998 for Cooper Nuclear Station
ML20195B91931 December 19981998 NPPD Annual Rept. with
ML20196J9647 December 1998Safety Evaluation Accepting Licensee Third 10-yr Interval Inservice Insp Plan Request for Relief RI-27,rev 1Incorporated by reference
Scaffolding
ML20198D24730 November 1998Monthly Operating Rept for Nov 1998 for Cooper Nuclear Station.With
ML20196A28623 November 1998SER Re Core Spray Piping Weld for Cooper Nuclear Station. Staff Concluded That Operation During Cycle 19 Acceptable with Indication re-examined During RFO 18
ML20196A52423 November 1998Safety Evaluation Accepting Proposed Alternative to Use UT Techniques Qualified to Objectives of App Viil as Implemented by PDI Program in Performing RPV Shell Weld & Shell to Flange Weld Examinations
ML20196A50623 November 1998Safety Evaluation Re Flaw Indication Found in Main Steam Nozzle to Shell Weld NVE-BD-N3A at Cns.Plant Can Be Safely Operated for at Least One Fuel Cycle with Indication in as-is Condition
ML20196C42420 November 1998Rev 1 to Cooper Nuclear Station COLR Cycle 19
ML20195H17617 November 1998SER Authorizing Proposed Alternative in Relief Requests RV-06,RV-07,RV-09,RV-11,RV-12 & RV-15 Pursuant to 10CFR50.55a(a)(3)(ii).RV-08 Granted Pursuant to 10CFR50.55a(f)(6)(i) & RV-13 Acceptable Under OM-10Safe Shutdown
Stroke time
Incorporated by reference
Power-Operated Valves
ML20195F86031 October 1998Monthly Operating Rept for Oct 1998 for Cooper Nuclear Station.With
ML20155D99631 October 1998Rev 0 to GE-NE-B13-01980-24, Fracture Mechanics Evaluation on Observed Indication at N3A Steam Outlet Nozzle to Shell Weld at Cooper Nuclear Station
ML20154Q5665 October 1998Rev 0 to CNS COLR Cycle 19
ML20154L53830 September 1998Monthly Operating Rept for Sept 1998 for Cooper Nuclear Station.With
ML20151Z61416 September 1998SER Accepting Util Responses to NRC Bulletin 95-002 for Cooper Nuclear StationGrab sample
ML20154F79331 August 1998Rev 0 to J11-03354-10, Supplemental Reload Licensing Rept for CNS Reload 18,Cycle 19Shutdown Margin
Anticipated operational occurrence
Feedwater Controller Failure
ML20153B11031 August 1998Monthly Operating Rept for Aug 1998 for Cooper Nuclear Station
ML20237E77720 August 1998Revised COLR Cycle 18 for Cooper Nuclear Station
ML20151Q12114 August 1998Rev 0 to Control of Hazard Barriers
ML20237C05931 July 1998Monthly Operating Rept for Jul 1998 for Cooper Nuclear Station
ML20236R91320 July 1998SER Accepting Rev 13 to Quality Assurance Program for Operation Policy Document for Plant
ML20236P2977 July 1998Rev 2 to NPPD CNS Strategy for Achieving Engineering Excellence
ML20236R09330 June 1998Monthly Operating Rept for June 1998 for Cooper Nuclear Station
ML20249A77031 May 1998Monthly Operating Rept for May 1998 for Cooper Nuclear Station
ML20247G61313 May 1998Part 21 Rept Re Defect Contained in Automatic Switch Co, Solenoid Valves,Purchased Under Purchase Order (Po) 970161. Caused by Presence of Brass Strands.Replaced Defective Valves
ML20247G09530 April 1998Monthly Operating Rept for Apr 1998 for Cooper Nuclear Station
ML20237B68624 April 1998Vols I & II to CNS 1998 Biennial Emergency Exercise Scenario, Scheduled for 980609
ML20217A15316 April 1998Closure to Interim Part 21 Rept Submitted to NRC on 970929. New Date Established for Completion of Level I & 2 Setpoint Project Committed to in .Final Approval of Setpoint Calculations Will Be Completed by 980531
ML20216G53331 March 1998Monthly Operating Rept for Mar 1998 for Cooper Nuclear Station