Text
I s
OPERATING DATA REPORT DOCKET NO, 050-0298 UNIT CNS DATE 5/14/97 OPERATING 8,TATt'S TELEPIIONE (402) 825-5295 1.
Unit Name:
Cooper Nuclear Station Notes 2.
Reporting Period:
April 1997 3.
Licensed Thermal Power (MWt):
2381 6 Nameplate Rating (Gross MWe):
836 5.
Design Electrical Rating (Net MWe):
778 6.
Maximum Dependable Capacity (Gross MWe):
787 7.
Maximum Dependable Capacity (Net MWe):
764 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To Which Restricted, if Any (Net MWe):
- 10. Reasons For Restriction,if Any:
This Month Yr.-to-Date Cumulative I t, llours in Reporting Period 719.0 2,879.0 200,160.0
- 12. Number of flours Reactor Was Critical 0.0 2,091.1 149,735.8
- 13. Reactor Reserve Shutdown llours 0,0 0.0 0.0
- 14. Ilours Generator On-Line 0.0 2,090.8 147,574.9
- 15. Unit Reserve Shutdown llours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWil) 0.0 4.872,201.0 308,986.084.0
- 17. Gross Electric Energy Generated (MWil) 0.0 1,605,775.0 100,486,603.0
- 10. Net Electric Energy Generated (MWil) 0.0 1,561,672.0 97,126,699.0
- 19. Unit Service Factor 0.0 72.6 73.7
- 20. Unit Availability factor 0.0 72.6 73.7
- 21. Unit Capacity Factor (Using MDC Net) 0.0 71.0 63.5
- 22. Unit Capacity Factor (Using DER Net) 0.0 69.7 62.4
- 23. Unit Forced Outage Rate 0.0 0.0 7.9
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling Outage, March 28,1997,45 days.
- 25. It Shut Down At End of Report Period, Estimated Date of Startup:
May 12,1997
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY l
INITIAL ELECTRICITY COMMERCIAL OPERATION i
9705200120 970514 PDR ADOCK 05000298 R
. _ ~
~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
050-0298 UNIT CNS DATE 5/14/97 TELEPilONE
._402) 825-5295
(
MONTil April 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 o
17 o
2 o
18 o
3 o
19 o
4 0
20 o
5 0
21 o
6 0
22 o
7 o
23 o
8 o
24 0
9 6
25 o
10 o
26 0
11 0
27 o
12 0
28 o
I 13 0
29 o
14 o
30 0
15 0
31 16 0
INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
m._
UNIT SHUTDOWNS AND POWER REDUCTIONS
[
DOCKET NO.
' 050-0298 UNIT NAME Cooper Nuclear Station DATE 5/14/97 COMPLETED BY P.1. Ballinger REPORT MONTH April 1997 TELEPHONE (402)825-5295 M# N 33,'*'
System Cause & Corrective Action to No.
Date Type I Reason 2 Shutting Dowa Licensee Event Report ComponentCode 5 4
Prevent Recurrence Reactor 3 9741 3/29/97 S
719 C
2 N/A N/A N/A Shotdow a for Cycle 18 Refueling Outage i
i F: Forced 2 Reason:
4 Exhibit G -Instructions for S: Schedeied A - Equipment Failure (Emplaia) 3 hfethod:
Preparation of Data Entry B - Maintensoce or Test I - Manual Sheets for Licensee Event i
C-Refueling 2 - Mammal Scram Report (LER) File (NUREG-0161)
D - Regulatory Restriction 3 - Automatic Scram E - Operator Training & license Esanimation 4 -Contimmed
' 5 ExhibitI-SameSource F-Administratis e 5-Reduced Load G - Operational Error (Explais) 6 - Other l
II-Other (Emplais) i m
. m m
=
rv.
.m. m m
OPERATIONS NARRATIVE COOPER NUCLEAR STATION April 1997 The plant remali.c i shutdown for the Cycle 18 Refueling Outage.
l l
f l
\\
i f