OPERATING DATA REPORT DOCKET NO.
050-0298 UNIT CNS DATE February 15. 1996 OPERATING STATUS TELEPHONE (402) 825-5295 1.
Unit Name:
Coooer Nuclear Station Notes 3.
Reporting Period:
Januarv 1996 3.
Licensed Thermal Power (MWt):
2381
- 4. '
Nameplate Rating (Gross MWeh 836 5.
Design Electrical Rating (Net MWe):
778 6.
Maximum Dependable Capacity (Gross MWe):
787 7.
Maximum Dependable Capacity (Net MWeb 764 8.-
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
I 9.
Power Level To Which Restricted, if Any (Net MWe):
10.
Reasons for Restriction, if Any:
This Month Yr.-to-Date Cumulative 11.
Hours in Reporting Period 744.0 734.,,Q
__.18.9.241.0 12.
Number of Hours Reactor Was Cntical 744.0 744.0 139.785.4 13.
Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14.
Hours Generator On-Line 728.1 728.1 137.672.0 15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
Gross Thermal Energy Generated (MWH) 1.547.184.0 1.547.184.0 285.873.612.0 17.
Gross Electnc Energy Generated (MWH) 510.898.0 510.898.0 92.891.208.Q 18.
Net Electric Energy Generated (MWH) 494.318.0 494.318.0 89.720.447.0 19.
Unit Service Factor 97.9 97.9 72.7 20.
Unit Availability Factor 97.9 97.9 72.7 21.
Unit Capacity Factor (Using MDC Net) 87.0 87.0 62.1 22.
Unit Capacity Factor (Using DER Net) 85.4 85.4 60.9 23.
Unit Forced Outage Rate 2.1 2.1 8.4 24.
Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None.
- 25.
If Shut Down At End of Report Period, Estimated Date of Startup:
N/A 26.
. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9602220047 960215 PDR ADOCK 05000298 R
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
050-0298 UNIT CNS DATE February 15. 1996 TELEPHONE (402) 825-5295 MONTH January 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 455 17 695 2
584 18 742 3
628 19 754 4
727 20 768 5
754 21 769
'6 764 22 770 7
674 23 768 8
356 24 768 9
295 25 769 10 51 26 768 11 505 27 767 12 707 28 742 i
13 723 29 767 14 708 30 767 j
15 599 31 767 16.
687 INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
UNIT CHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
050-0298 UNIT NAME Cooper Nuclear Station DATE February 15.1996 l'
COMPLETED BY P. L. Balkneer l-REPORT MONTH January 1996 TELEPHONE (4021 825-5295 l
Method Licensee Cause & Corrective Duration Of ~
Event System
- Component' Action to Shutting Report Code Code Prevent Recurrence l
No.
Date Type' (Hours)
Reason 2 l
Down Reactor' 96-01 1/10/96 S
15.9 B
N/A N/A N/A N/A Turbine generator taken off line to repair t
turbine oil system. Returned turbine l
generator to service after 15.9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br />.
l l
g s
l' 1 F: Forced 2 Reason:
3 Method:
4 Extubst G -Instructums for S: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparation of Data Entry l
B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Everet C - Refueling 3 - Automatic Scram Report (LER) File (NUREG-0161)
D - Regulatory Restriction 4 - Contmued E - Operator Training & License Examinatior.
5 - Reduced Load 5 Exhibit 1 - Same Source F - Administrative 6 - Other G - Operational Error (Explain)
H - Other (Explain)
OPERATIONS NARRATIVE COOPER NUCLEAR STATION January 1996 The plant continued the startup power ascension for the first few weeks of January. A Reactor Recirculation Pump trip on 1/7/96 resulted in reduced power operation. The Reactor Recirculation Motor Generator Set / Reactor Recirculation Pump problem was corrected on 1/8/96, but power was maintained low for a turbine maintenance outage planned for 1/10/96. The turbine was taken off line to allow repair of the turbine oil system and returned to service after 15.9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br />. The plant returned to normal power operation after the turbine was repaired. The ramp to full power continued with full power achieved on 1/19/96. A capacity factor of 87% was attained for the month of January.
a l
l W
J
. -.... - - -.. -.. -.... - -.... -.~..
4-h g.
LIST OF NRC COMMITMENTS l ATTACHMENT 3 l
Correspondence No: NLS960026 The following table identifies.those actions committed to by the District ~in this document. Any other actions discussed in the submittal represent intended or planned actions by *he District.
They are described to the NRC for the NRC's i
information and are not regulatory commitments.
Please notify the Licensing Manager at Cooper Nuclear 5:ation of any questions regarding this document or any associated
COMMITTED DATE COMMITMENT OR OUTAGE
^
None 1
I' T
i h
(
}
1 i
I 1
f i
5
]
l PROCEDURE NUMBER 0.42 l
REVISION NUMBER 1 l
PAGE.11 OF 11
.