r-COOPER NUCLEAR STATON P.O. BOX 08. BROWNVLLE. NEBRASKA 68321 Nebraska Public Power District
'5%fggg"
NLS960235 December 13, 1996 U.
S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555
Subject:
Monthly Operating Status Report for November 1996, Docket No. 50-298.
Gentlemen:
Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for November 1996.
The report includes Operating Status, Average Daily Unit Power Level, Unit Shutdown Data and a Narrative Summary of Operating Experience for the month of November.
Should you have any comments, or require additional information regarding this report, please contact me.
Sincerely,
% (Ec b M.
F.
Peckham Plant Manager MFP:lb Enclosures cc: ANI Library R.
W.
Beck and Associates T.
H.
Black T.
L. Bundy L.
J.
Callan J.
M.
Cline A.
L.
Dostal R.
L.
Gumm l
G.
R.
Horn l
i INPO Records Center E.
A.
Lanning J.
L.
Long f3 W.
R. Mayben
/
) //
J.
R.
McPhail
~
j P. D.
Graham NRC Senior Resident Inspector W.
Turnbull F.
E.
Yost 9612190177 961130 PDR ADOCK 05000298 R
_ = - - -
-,m=wam gg y eeg yy7gegcy7g,g,7pggg,7gggggAgwggggg.g.((g'}l t
=m m=ms=>_==mm
= -
=
i i
OPERATING DATA REPORT DOCKET NO. 050-0298 UNIT CNS j
DATE 12/13/96 i
OPERATING STATt'S TELErilONE 1402)825-5295 1.
Unit Name:
Cooper Nuclear Station Notes 2.
Reportirig Period:
November 1996 3.
Licensed Thermal Power (MWt):
2381 4
Nameplate Rating (Gross MWe):
836 5.
Design Electrical Rating (Net MWe):
778 6.
Maximum Dependable Capacity (Gross MWe):
787 i
7, Maximum Dependable Capacity (Net MWe):
764 I
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restriction,if Any:
i 1
l This Month Yr.-to-Date Cumulative l
l
- 11. Ilours in Reporting Period 720.0 8.040.0 196.537.0
- 12. Number ol'ilours Reactor Was Critical 720.0 7.859.3 146.900.7
- 13. Reactor Reserve Shutdown flours 0.0 0.0 0.0
- 14. Ilours Generator Orvline 720.0 7.796.2 144,740.1
- 15. Unit Reserve Shutdown llours 0.0 0.0 0.0 l
- 16. Gross I hermal Energy Gencruted (MWil)
I,702,680.0 18.021,007.0 302.347.435.0
- 17. Gross Electric Energy Generated (MWil) 558.210 0 5,921.228.0 98.301.538.0 1C. Net Electric Energy Generated (MWil) 546.696 0 5.772,346 0 94.998.475.0
- 19. Unit Service Factor 100.0 97.0 73 6
- 20. Unit Availability Factor 100.0 97.0 73.6
- 21. Unit Capacity Factor (Using ML)C Net) 99 4 94.0 63.3
- 22. Unit Capacity Factor (Using DER Net) 97.6 92.3 62.1
- 23. Unit Forced Outage Rate 0.0 0.0 80 1
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each).
Refueling Outage. March 28.1997. 40 days.
)
i 25 If Shut Down At End of Report Period, Estimated Date of Startup:
N/A 26 Units in Test Status (Prior to Commercial Operation):
Forecast Achieved i
INITIAL CRITICALITY j
INITIAL ELECTRICITY COMMERCIAL OPERATION i
l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
050-0298 UNIT CNS DATE 12/13/%
i TELEPHONE (402) 825-5295 MONTil November 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 763 17 764 2
728 18 763 3
695 19 764 4
765 20 763 i
5 765 21 749 6
765 22 749 7
765 23 766
'l 8
764 24 764 l
9 765 25 764 1
10 764 26 763 11 764 27 762 12 763 28 763 13 764 29 763 14 764 30 760 15 765 31 16 765 INSTitUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
i s..
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
050-0298 UNIT NAME Cooper Nuclear Station DATE 12/13/96 COMPLETED BY P. L BaHinger REPORT MONTil November 1996 TELEPHONE (402) 825-5295
^
3 Reason 2 Shot Do a Ucensee Event Report Component Code 5
, "R T pe 1 Na Date 4
m Reactor 3 Nome t
i l
1 F: Forced 2 Reason:
4 Exhibit G -Instructions for S: Scheduled A - Equipment Faltare (Explain) 3 Slethod:
Preparation of Data Entry B - 51.intenance or Test I - Stammal Sheets for Licensee Event C-Refseling 2 - Slamaal Scram Report (LER) File (N1' REG-016I)
D - Regulatory Restriction 3 - Automatic Scram E - Operator Traising & License Examisation 4 -Costissed 5 EnbitWtI-Sar c Source F-Administrathe 5 - Reduced l. mad G - Operational Error (Emplais) 6 - Other II-Other (Emplain)
i 1
l i
OPERATIONS NARRATIVE I
k COOPER NUCLEAR STATION November 19%
t
- The plant operated for most of the month at full power. On 11/2/96, power was reduced to perform a sequence exchange, control rod scram timing, and other surveillance testing. Minor rod adjustments were made on 11/3/96 to control rod line as the plant was returned to full power operation.
l l
l A capacity factor of 97.6 % was achieved for the month.
i t
L I
]
l 1
i l
l 1
i 3-i i
l r
i
- I w
O a e
)
ATTACHMENT 3 LIST OF NRC COMMITMENTS l
Correspondence No: NLS960235 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District. They are described to the NRC for the NRC's information and are not regulatory commitments.
Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITTED DATE COMMITMENT OR OUTAGE None
~
l PROCEDURE NUMBER O.42 l
REVISION NUMBER 1.2 l
PAGE 8 OF 10 l