Text
p!
{
i l
l OPERATING DATA REPORT DOCKET NO.
050-0298 UNIT CNS I
DATE July 10. 1995 l
OPERATING STATUS TELEPHONE (402) 825-5295 1.
Unit Name:
Cooner Nuclear Station Notes 1
-2.
Reporting Period:
February 1995 1
1 l
3.
Licensed Thermal Power (MWt):
2381 1
4.
Nameplate Rating (Gross MWe):
836 1
5.
Design Electrical Rating (Net MWe):
778 6.
Maximum Dependable Capacity (Gross MWe);
787 7,
Maximum Dependable Capacity (Net MWe):
764 l
B.
If Changes Occur in Capacity Rttings (items Number 3 Through 7) Since Last Report, Give Reasons:
2 l
9.
Power Level To Which Restricted, if Any (Net MWe):
10.
Reasons For Restnction, it Any:
This Month Yr.-to-Date Cumulative 11.
Hours in Reporting Period 672.0 1.416.0 181.153.0 13.
Number of Hours Reactor Was Critical 300.0 300.0 133.490.2 13.
Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14.
Hours Generator On-Line 177.5 177.5 131.456.8 15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
Gross Thermal Energy Generated (MWH) 333.502.0 333.502.0 271.644.746.0 17.
Gross Electric Energy Generated (MWH) 99.225.0 99.225.0 88.217.570.0 18.
Net Electric Energy Generated (MWH) 95.667.0 95.667.0 85.194.105.0 19.
Unit Service Factor 26.4 12.5 72.6 20.
Unit Availability Factor 26.4 12.5 72.6 21.
Unit Capacity Factor (Using MDC Net) 18.6 8.8 61.6 23.
Unst Capacity Factor (Using DER Net) 18.3 8.7 60.4 23, Unit Fo ced Outage Rate 73.6 87.5 8.8 20.
Shutdown Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Refuelino Outaae. October 1995.
I 23.
If Shut Down At End of Report Period, Estimated Date of Startup:
N/A 26.
Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9507140195 950710 PDR ADOCK 05000298 R