ML20134M651

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1997 for Cooper Nuclear Plant
ML20134M651
Person / Time
Site: Cooper Entergy icon.png
Issue date: 01/31/1997
From: Ballinger P, Peckham M
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLS970032, NUDOCS 9702200335
Download: ML20134M651 (6)


Text

-- _

COOPER NUCLEAR STATON P.O. BOX 96, BROWNVILLE. NEBRASKA 88321 l

TELEPHONE M3811 q Ne6raska Public Power Distn.ct ax --

j NLS970032

)

February 14, 1997 j U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 l

Subject:

Monthly Operating Status Report for January 1997, Docket No. 50-298.

Gentlemen:

1 Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for January 1997 The report includes Operating Status, Average Daily Unit Power Level, Unit shutdown Data and a Narrative Summary of Operating Experience for the month of January.

Should you have any comments, or require additional information regarding this report, please contact me.

i l Sincerely, M. F. Peckham

( Plant Manager MFP:lb I Enclosures cc: ANI Library R. W. Beck and Assoc..ates T. H. Black 1 l T. L. Bundy l

! L. J. Callan

~

J. M. Cline A. L. Dostal l R. L. Gumm , l l G. R. Horn INPO Records Center f- j

(

/

E. A. Lanning d l J. L. Long l W. R. Mayben J. R. McPhail P. D. Graham NRC Senior Resident Inspector W. Turnbull '

F. E. Yost l 9702200335 970131 1 PDR ADOCK 05000298

) R PDR i

<=== = - - = = = -

PowerfulPridein

= = - - = = = =

Nebrasks f.i 2 X/T

=======w=======.====-

I l

  • l l '

OPERATING DATA REPORT DOCKET NO. 050-0298 UNIT CNS DATE 2/1497 OPEMATING STATt'S TELEPilONE (402) 825-5295

1. Unit Name: Cooper Nuclear Station Notes
2. Reporting Period: January 1997
3. Licensed Thermal Power (MWL): 2381  ;

j 4 Nameplate Rating (Gross MWe): 836

5. Design Electrical Rating (Net MWe): 778
6. Maximum Dependable Capacity (Gross MWe): 787
7. Maximum Dependable Capacity (Net MWe); 764
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Lesel To Which Restricted, if Any (Net MWe):
10. Reasons For Restriction,if Any: i This Month Yr.-to-Date Cumulative
11. Ilours in Reporting Period 744.0 744.0 198.025.0
12. Number of flours Reactor Was Critical 744.0 744.0 148.388.7
13. Reactor Reserve Shutdown llours 0.0 0.0 0.0
14. Ilours Generator On-Line 744.0 744.0 146.228.1
15. Unit Reserve Shutdown !!ours 0.0 0.0 00
16. Gross 'Ihermal Energy Generated (MWil) 1.761.672.0 1.761.672.0 305.875.555 0
17. Gross Electric Energy Generated (MWil) 579.000 0 579.000.0 99,459,828.0
18. Net Electric Energy Generated (MWil) 565.268.0 565.268.0 96.130.295.0 !
19. Unit Service Factor 100.0 100.0 73.8
20. Unit Availability Factor 100.0 100.0 73 8
21. Unit Capacity Factor (Using MDC Net) 99.4 99.4 63.5
22. Unit Capacity Factor (Using DER Net) 97.7 97.7 62.4
23. Unit Forced Outage Rate 00 0.0 80
24. Shutdown Scheduled Oser Neu 6 Months (Type, Date, and Duration of Each): Refueling Outage. March 28.1997,40 days.

l 25. If Shut Down At End of Report Period, Estimated Date of Startup: N/A

26. Units in Test Status (Prior to Coramercial Operation): Forecast Achieved INITIAL CRITICALITY

, INITI A!. ELECTRICITY COMMERCIAL OPERATION l

I

. -- - - . . - .- - . . - . . . - - - _ ~ . . . -. _ - - . . . . . .- -

i I

AVERAGE DAILY UNIT POWER LEVEL I

DOCKET NO. 050-0298 UNIT CNS 1

DATE 2/14/97 I I

TELEPHONE (402) 825-5295 MONTH January 1997 DAY. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 763 17 761 l 2 764 18 763 t

3 757 19 766 4 696 20 767 5 764 21 767 l l

6 763 22 766 l 7 763 23 765 I

8 763 24 764 9 762 25 762 10 761 26 735 i

iI 760 27 763  !

12 760 28 763 13 761 29 763 14 761 30 765 1

15 163 31 765 16 760 INSTRUCTIONS:

! On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0298 UNIT NAME Cooper Nuclear 5tation DATE 2/14/97 COMPLETED BY P. L Ballinger REPORT MONTil January 1997 TELEPIIONE (402)825-5295 31cthod Of

"" ' I'" * '"" ^'

No. Date Type i Reason 2 Shutting Dowa Licensee En ent Report Component Code 5 (Ilours) * "*"' " ' " " ' '

Reactor 3 None e

I F: Forced 2 Reason: 4 Exhibit G -Instructions for S: Scheduled A - Equipment Failure (En pisia) 3 Slethod: Preparation of Data Entry B - Slaintenance or Test I - Slamusi Sheets for Licensee Event C- Refueling 2 - 31ammal Scram Report (LER) File (NUREG-016I) i D - Regulatory Restriction 3 - Automatic Scram E - Operator Training & License Esamination 4 - Continued 5 Exhibit I-Same Source F- Administrative 5 Reduced Lead G - Operational Error (Esplain) . 6 - Other .

II- Other (Esplaia)

OPERATIONS NARRATIVE COOPER NUCLEAR STATION January 1997 The plant operated for the month at full power.

A capacity factor of 97.7 % was achieved for the month.

1 1

1 1

~el ATTACHMENT 3 LIST OF NRC COMMITMENTS l Correspondence No: NLS970032 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District. They are described to the NRC for the NRC's i information and are not regulatory commitments. Please notify the Iicensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE '

COMMITMENT OR OUTAGE

$ None

! l l

l PROCEDURE NUMBER 0.42 l REVISION NUMBER 2 l PAGE B OF 10 l