ML20106G968
| ML20106G968 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 02/29/1996 |
| From: | Ballinger P, Herron J NEBRASKA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NLS960047, NUDOCS 9603190383 | |
| Download: ML20106G968 (6) | |
Text
I e'
COOPER NUCLEAR STATION P.O. BOX 98. BROWNVILLE, NEBRASKA 68321
)
Nebraska Public Power District "h%""
. :a
- l NLS960047 March 15, 1996 U.
S. Nuclear Regulatory Commission Attention: Document Control Desk l
Washington, D.C.
20555 l
I
Subject:
Monthly Operating Status Report for February 1996, Docket No.
50-298.
Gentlemen:
Enclosed for your information and use is the Cooper Nuclear Station l
Monthly Operating Status Report for February 1996.
The report includes Operating Status, Average Daily Unit Power Level, Unit Shutdown Data and a Narrative Summary of Operating Experience for the month of February.
Should you have any comments, or require additional information regarding this report, please contact me.
Sincerely, l
T. Herron lant Manager JTH:PLB:tlb Enclosures i
cc: ANI Library R. W.
Beck and Associates T. H.
Black I
T. L. Bundy L. J.
Callan J. M.
Cline A. L. Dostal R. L. Gumm G. R. Horn INPO Records Center l
E. A. Lanning J.
L.
Long W. R. Mayben J. R. McPhail J. H. Mueller NRC Senior Resident Inspector R. J. Singer F.
E.
Yost 9603190393 960229 ^
PDR ADOCK 05000299
-b R
pun f
190052 1) ni e
w.,e.-----.e.
-n-ev.
,e p
---,-,m.--
e e+-
e a*
--+ - -
OPERATING DATA REPORT l
DOCKET NO.
050-0298 UNIT CNS DATE March 15. 1996 OPERATING. STATUS TELEPHONE (402) 825-5295 l
1.
Unit Name:
Cocoer Nuclear Station Notes 1
2.
Reporting Period:
februarv 1996 3.
Licensed Thermal Power (MWt):
2381 4.
Nameplate Rating (Gross MWe):
836 5.
Design Electrical Rating (Net MWe):
778 6.
Maximum Dependable Capacity (Gross MWe):
787 7.
Maximum Dependable Capacity (Net MWe):
764 8.
If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
i i
l 9.
Power Level To Which Restricted, if Any (Net MWe):
10.
Fieasons For Restriction. If Any:
l
\\
This Month Yr.-to-Date Cumulative 696:0' 1,440:0{
189,937.0:
11.
Hours in Reporting Period
~
696.0 1!440~.0
'140:481:4:
12.
Number of Hours Reactor Was Critical
~
1 0:0 0*0
~ - ~ ~ ~~ 0*0 i
13.
Reactor Reserve Shutdown Hours
~~ ~
696.0~~~-~~1:4241-~ ' ~ 138,3 68.0 :
14 Hours Generator On-Line
_ _ _ 0*0
~
~ ~~ ~ 0*07~~
~~"0*0' 15.
Unit Reserve Shutdown Hours
~1,651,824:0
~~~~3,199,008.0"~ 287,525,436'.0 t 16.
Gross Thermal Energy Generated (MWH) 550,010:0 1;060,908'.0 93:441,218.0 >
17.
Gross Electric Energy Generated (MWH) 5337452:0 1;027,~770'.0 {~~~~~~ 90 253,899.~0 -
18.
Net Electric Energy Generated (MWH) 100~0^
~~9 8
- 9 - ~ ~
72*81 19.
Unit Service Factor
=
~ 100.0
' ~ ~ - ~ ~ ~
~ 9 8.9 '
~
72.8 20.
Unit Availability Factor
~~
~ 100.3 ' ~ ~ ~ ~ ~ 9 3.~ 4 " ~
~ 62.2 :
21.
Unit Capacity Factor (Using MDC Net)
~~ 9 8 ~'5
~ b 1~'7
~~-~ ~ ~
~~ Ol 'l '
22.
Unit Capacity Factor (Using DER Net) 0.0 l __, _
O'.01
' ~.4 )
8 23.
Unit Forced Outage Rate m
24.
Shutdown Scheduled Over Next 6 Months (Ts ie, Date, and Duration of Each):
None 25.
If Shut Down At End of Report Period, Estimm.ed Date of Startup:
N/A 26.
Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l
l l
. ~ _ _ _
.. -. ~.. _.
.. ~.
~.-
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
050-0298 UNIT CNS DATE March 15. 1996 TELEPHONE (402) 825-5295 MONTH February 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 01 767 17 769 02 767 18 769 03 766 19 771 04 767 20 770 05 768 21 769 06 768 22 769 07 769 23 770 i
08 769 24 746 09 769 25 732 10 769 26 769 11 769 27 768 12 769 28 768 13 768 29 768 14 769 15 769 i
16 769 DISTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
050-0298 UNIT NAME Cooper Nuclear StatiofT DATE March 15.1996 COMPLETED BY P. L. Ballinaer REPORT MONTH February 1996 TELEPHONE
_14021 825-5295 Method Licensee Cause & Corrective Duration Of Event System
- Component' Action to No.
Date Type' (Hours)
Reason' Shutting Report Code Code Prevent Recurrence Down Reactor' e + r?
?
1 F: Forced 2 Reason:
3 Method:
4 Exhebet G - instructions for S: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refueling 3 - Automatic Scram Report (LER) File (NUREG-0161)
D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Load 5 Exhitst I - Same Source F - Administrative 6 - Other G - Operational Error (Explain)
H - Other (Explain)
OPERATIONS NARRATIVE COOPER NUCLEAR STATION February 1996 i
The plant operated at steady state full power operations for the month of February. Normal monthly turbine testing was performed on February 24-25,1996. A capacity factor of 100% was attained for the month of February.
i
l
- l LIST OF NRC COMMITMENTS l ATTACHMENT 3 l Correspondence No: NLS960047 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District.
They are described to the NRC for the NRC's information and are not regulatory commitments.
Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITTED DATE COMMITMENT OR OUTAGE None b
..p l
PROCEDUPE NUMBER 0.42 l
REVISION NUMBER 1 l
PAGE 9 or 11 l
-________