ML20198P008

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Dec 1997 for Cooper Nuclear Station,Consisting of Operating Data Rept & Unit Shutdown Rept,Per GL 97-02
ML20198P008
Person / Time
Site: Cooper Entergy icon.png
Issue date: 12/31/1997
From: Ballinger P, Peckham M
NEBRASKA PUBLIC POWER DISTRICT, OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, NLS980001, NUDOCS 9801210294
Download: ML20198P008 (4)


Text

a-

-6y  % Lg, COOPER NUCLE AR $TATON P.O. 901 es, S40wWLLE. NEBRASKA 48321 ..

TELEPHONE 14004.4 3411 Nebraska ,

Public Power District

-. a ,

w-_ .-

NLS980001 Janua q 15, 1998 U. S. N.tclear Regulatory Commission Attentions Document Control Desk Washington, D.C. 20555-0001 Subjects Monthly Operating St.atus Report for December 1997, Docket No. 50-298.-

Gentlemen:

Enclosed for your information and use is the Cooper Nuclear Station Monthly

- Operating Status Report -for Decenber 1997. In accordance with the guidance provided by Generic Letter 97-02, this report includes an Operating Data Report and Unit shutdown Report for the month of December.

Should you have any comments, or require additional information regarding this report, please contact me.

Sincerely,

} ..

/

{ (o-

. F. Peckham Plant Manager

- MFP:lb Enclosures cci ANI Library R. W. Beck and Associates J. M. Cline A. L. Dostal M. G. Farschon M. A. Gillan P. D. Graham R. L. Gumm INPO Records Center R. P. Kosch ,

E. A, Lanning T. LaPorte' [l B. Lewis W.-R. Mayben [ L-'I )

h e' NRC Regional Administrator

- NRC Senior Resident Inspector E. Pasche R. D.-Stoddard

' llll Ul.i!I.l!ll!I.li.ll 9901210294 971231  ?

POR ADOCK 050002981 6 R -PDR Jj

- ~

Powerful Pride in Nebraska=============w waa=n == w==xw=g=.=== =

4

+ .

APPENDIX A OPERATING DATA ' " ORT IKX'KI:T ho. - 6te429R UNIT N AME Coopee Nuclear Statina DATE 1/15/95 OntPIITI:D llY P. l. Ital 16aree ll:11PilONI. (4021s2 4 5295 Reporting Period: peremher 1997 This Month Yr -to-Date Cumulative 1 Design I:lectrical Raimg (Net MWe) 778 N/A N/A The nominal ret electncal output of the unit specified by the uhhty and used for the purpose of plant design 2 Maximurn Ekpendable Capacity (Net MWe) 764 N/A N/A

' The gross elecincel output as measured at the output termmals of the turbme-generator during the most restnetne scaumal cornhtions minus the normal sinuon service huds

) Numher of flours the Reactor Was Cutical 744 0 7,195 0 t $5 019 7 The total number of hours durmg the gross hours of the reportmg penod that the reactor was entical.

4 Number of flours the Generator Was On 1.ine 7440 1.117 2 152,821 3

( Also called Semce llours) The total numhet of hours dunng the gross hours of the reportmg pennu that the umt operated with the breakers clowd to the station bus lhe sum of the hours the generator was on hne plus the 6'tal outage hours should equal the gross houts in the reportmg period

$ Unit Reserve Shutdown Hours 00 00 00 1he total number of hours durmg the ; rums hours of the reporting penod that the umt wa= removed from service for economic or similar reasons but was available for operation.

6. Net I:lectncal E:nergy (MWil) 567,6RI O 5 455 646 6 101.020,723 6 The gross electrical output of the unit measured at the output terminals of the turbine-generator nunus the normal station wrvice hals dunng the gross hours of the reportmg perkt expressed in mega-watt hours Negatne quantities should not be uwd t/$/98 4:29 PM

m __ - . . ._

9 e

s APPENDIX B -

  • ~

UNIT SHUTDOWNS DOCKET NO. 990-8298 U' .'T NAME Ceeper Nuclear Statsee

'DATE t/15.95 COMPLETED BY P. L Bemager TELEPHONE (4027825-5295 REPORT MONTH - Decesitar 1997

- Type Method Of Shutting CAUSETOttRECTIVE ACTIO%3 g g , {y, F: FORCED Down Reactee (2) COWMENTS S: SC11EDt'I.ED Nome i

St3fMARY: Norinal fell power operation for most of the month. Norinal turteine sencillance testing perfetwed at tideced power em 12/7M7.

(t) Reason:

A - Equipnient Failure (Empleta)

D. Maintenance er Test C- Refuehet D- Reguistory Restrktion E - Operator Tralaing/lkenw Esamination F- Adm6mistratise C - Operational Error (Explais)

II-Osher(Esplain)

(2) Methed:

I - Mammal

2. Massat Trip 5 cram 3 - Aatosse ic Tripscram Coetised in 5 - Other (Etplaie) 1/5/98 4:28 sit a

l

.a ATTACllMENT 3 LIST OF NRC COMMITMENTS l Correspondence No; NLS980001 Thq following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District. They are described to the NRC for the NRC's information and are not regulatory commitments, Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulat ory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE None l PROCEDURE NUMBER 0.42 l REVISION NUMBER 5 l PAGE 9 OF 13 l