_ _ _ _ _ - _ - _ _ - _ _ _ - _ _ _ _ _ _ _ _ - - - _ - - - _ _ _ - _ _ _ _ - -. _ _.

e OPERATING DATA REPORT DOCKET NO. 050-0298 UNIT CNS DATE 4/15/97 OPERATING STATUS TELEPilONE (402)825-5295 1.

Unit Name:

Cooper Nuclear Station '

Notes 2.

Reporting Period:

March 1997 3.

Licensed Thermal Power (MWt):

2381 4

Nameplate Rating (Gross MWe):

836

(

5.

Design Electrical Rating (Net MWe):

778 l

6.

Maximum Dependable Capacity 3 ross MWe):

787 G

7.

Maximum Dependable Capacity (Net MWe):

764 l

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

I

- 9.

Power Level To Which Restricted, If Any (Net MWe).

10. Reasons For Restriction, if Any:

I

%is Month Yr.-to-Date Cumulative I '

I I, llours in Reporting Period 744.0 2.160.0 199,441.0 l-j

12. Number ofilours Reactor Was Critical 675.1 2,091.1 149,735.8
13. Reactor Reserve Shutdown llours 0.0 0.0 0.0 l 4.

Ilours Generator On-Line 674.8 2,090.8 147,574.9

' 15. Unit Reserve Shutdown llours 0.0 0.0 0.0 -

16. Gross Thermal Energy Generated (MWil) 1,522,929,0 4,872.201.0 308.986,084.0 l

17, Gross Electric Energy Generated (MWil) 500,885.0 1,605,775.0 100,486.603.0

18. Net Electric Energy Ocnerated (MWil) 486,261.0 1.561,672.0 97,126,699.0

)

19. Unit Service Factor 90.7 96.8

- 74 0

20. Unit Availanility Factor 90.7 96.8 74.0 21,. Unit Caprsty Factor (Using MDC Net) 85.5 94.6 63.7
22. Unit Capacity Factor (Using DER Net) 84.0 92.9 62.6

~ 23, Unit forced Outage Rate 0.0 0.0 7.9 l

24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage March 28,1997,40 days.

25, _ lf Shut Down At End of Report Period, Estimated Date of Startup:

- May 7,1997

26. Units In Test Status (Prior to Commercial Operation):

Forecast Ach!aved j

INITIAL CRiTICAlllY t

IMTIAL ELECThlCITY COMMERCIAL OPERATION 4

l 9705200127 970514 ADOCK 05000298I-L PDR R

PDR A

-l.

ATTACHMENT 3 LIST OF NRC COMMITMENTS l

~,

Correspondence No: NLS970094 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District.

They are described to the NRC for the NRC's information and are not regulatory commitments.

Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE None l

l 1

l PROCEDURE NUMBER 0.42 l

REVISION NUMBER 4 l

PAGE 8 OF 9 l

,