Revised Monthly Operating Rept for Sept 1990 for Enrico Fermi Atomic Power Plant Consisting of Operating Data Rept
ML20058H819
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/30/1990
From: Anthony P
DETROIT EDISON CO.
To:
Shared Package
ML20058H813 List:
References
NUDOCS 9011260062
Download: ML20058H819 (1)


Text

-_ - - . . - . .

91,i 4

- OPERATING DATA REPORT COMPLETED BY P. M. Anthony DOCKET NO. 50-341 DATE October 15, 1990 TELEP110NE (313) 586-1617 OPERATING STATUS Fermi 2 l Notes: l

1. UNIT NAME:
2. REPVRTING PERIOD: September, 1990 l None. I I I 3 LICENSED THERMAL POWER (MWL): 3293 I
4. NAMEPLATE RATING (GROSS MWe): 1154 I l
5. DESIGN ELECT RATING (Net MWe): 1067 l
6. HAX DEPENDABLE CAP (GROSS MWe): 1154 I l 1047 l l
7. MAX DEPENDABLE CAP (Not MWe):
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 TilROUGil 7) SINCE LAST REPORT, GIVE REASONS: None.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net): None 9

10. REASONS FOR RESTRICTION, IF ANY ,None THIS MONTH YR TO DATE CUMULATIVE
11. IIRS IN REPORTING PERIOD 720 6551 23,557
12. HRS REACTOR WAS CRITICAL 678.8 6,276.5 17,373.4 0 0 0
13. REACTOR RESERVE SHUTDOWN llRS 6,138.4 16,435.2
14. HOURS GENERATOR ON-LINE _ 676
15. UNIT RESERVE SHUTDOWN HOURS 0 0 0
16. GROSS THERMAL ENERGY GEN (MWil) 2,165,376 19,093,728 48,455,690 709,880 6,303,080 16,047,437
17. GROSS ELECT ENERGY GEN (MWil)
18. NET ELECT ENERGY GEN (MWH) 677,318 6,029,678 15,342,529 1
19. UNIT SERVICE FACTOR 93.9 93 7 69.8
20. UNIT AVAILABILITY FACTOR 93 9 93 7 69.8
21. UNIT CAP FACTOR (USING MDC NET) 89.8 87.2 61.2 t 22. UNIT CAP FACTOR (USING DER NET) 88.1 _

86.3 60.0

23. UNIT FORCED OUTAGE RATE O 2.1 12.5
24. SilUTDOWNS SCHEDULED OVER NEXT 6 MONTilS (TYPE, DATE, DURATION OF EACH) n$8 h0" A refueling outage is scheduled to begin March 15, 1991. It is presently estimated that the outage will last 75 days (breaker to breaker).

y 25. IF SilVT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 10/09/90

$$ 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACillEVED INITIAL CRITICALITY N/A N/A 5$

INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A