Interim Deficiency Rept Re Remote Shutdown Panel.Initially Reported on 820819.Control Switches for SW-PCV-38B Will Be Located on Remote Shutdown Panel & Power to Supervisory Panel Will Be Supplied from Outside Control Room
ML20063N337
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/08/1982
From: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML20063N331 List:
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8209200217
Download: ML20063N337 (1)


Text

.

~

' ~

ATTACHMENT A WASHINGTON PUBLIC POWER SUPPLY SYSTEM NUCLEAR PROJECT NO. 2 DOCKET NO. 50-397 LICENSE NO. CPPR-93 REMOTE SHUTDOWN PANEL 10CFR50.55(e) CONDITION #208 DESCRIPTION OF DEFECT OR NONCOMPLIANCE GE design criteria (22A3085, Sec. 4.1) states that "the remote shutdoun system shall be designed to control the required shutdown systems from outside the control room irrespective of shorts, opens, or grounds in control circuits (in the control room)" which we have committed to in the FSAR (Sec. 7.4.1.4.b).

The remote shutdown panel controls loop B of the standby service water (SSW).

During a Human Factors Engineering Review, it was further discovered that the Supervisory Control Panel CS-2, which controls valves SW-V-2B, SW-V-128 and SW-V-69B, received its power from the control room.

Both of these conditions made the system dependent on the control room which is a violation of the design criteria for the system.

SAFETY IMPLICATION If the control room is evacuated and it becomes necessary to bring the reactor to cold shutdown, the sprayponds may not be available. Reactor decay heat would be dumped to the suppression pool which ultimately lead to overpressurization of the primary containment.

APPROACH TO RESOLUTION The design of the remote shutdown panel has been reviewed and no other deficien-cies have been identified. Control switches for SW-PCV-38B will be located on the remote shutdown panel ano power to the supervisory panel will be supplied from outside the control room. Project Engineering Directives (PED's) will be issued to correct the above described deficiencies.

8209200217 pDR ADOCK 05000 820908 S