ML031140632

From kanterella
Revision as of 01:23, 23 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Correction to Issuance of License Amendment Nos. 165 and 167, Respectively, Approving Revisions to TSs 1.0, 2.1, 2.3, 3.1, 3.8, 3.10 & 6.9
ML031140632
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 04/24/2003
From: John Lamb
NRC/NRR/DLPM/LPD3
To: Coutu T
Nuclear Management Co
Lamb J, NRR/DLPM, 415-1446
References
TAC MB5717, TAC MB5718
Download: ML031140632 (4)


Text

April 24, 2003 Mr. Thomas Coutu Site Vice President Kewaunee Nuclear Power Plant Nuclear Management Company, LLC N490 State Highway 42 Kewaunee, WI 54216

SUBJECT:

KEWAUNEE NUCLEAR POWER PLANT - CORRECTION TO ISSUANCE OF AMENDMENT 165 AND AMENDMENT 167 (TAC NOS. MB5717 AND MB5718)

Dear Mr. Coutu:

On March 11, and April 4, 2003, the U.S. Nuclear Regulatory Commission (NRC) issued Amendments Nos. 165 and 167, respectively, to Facility Operating License No. DPR-43 for the Kewaunee Nuclear Power Plant (KNPP).

Amendment No. 165 approved revisions to KNPP Technical Specifications (TS) 1.0, Definitions, TS 2.1, Safety Limits, Reactor Core, TS 2.3, Limiting Safety System Settings, Protective Instrumentation, TS 3.1, Reactor Coolant System, TS 3.8, Refueling Operations, TS 3.10, Control Rod and Power Distribution Limits, TS 6.9, Reporting Requirements, and their associated Bases. These modifications allowed you to implement a Core Operating Limits Report (COLR) by relocating cycle-specific, reactor coolant system-related parameter limits from the TSs to the COLR. In addition, Amendment No. 165 made administrative changes to the above TSs.

Amendment No. 167 approved revisions to KNPP TSs for use of Westinghouse 422 VANTAGE

+ nuclear fuel with PERFORMANCE + features.

By letter dated April 15, 2003, you requested a correction to Amendment No. 167 for KNPP TS page TS 2.3-2, because TS page 2.3-2 was issued including both the information stricken, which was to be removed, and the information to be added. KNPP TS page 2.3-2 that you sent the NRC included both the information stricken, which was to be removed, and the information to be added, due to an administrative error. The corrected KNPP TS page TS 2.3-2 is enclosed in Enclosure 1. This administrative correction does not impact or change our safety evaluation and acceptance of Amendment No. 167.

Due to an administrative error, the amendment number was not typed in the lower right hand corner of the KNPP TS pages for Amendment No. 165 and Amendment No. 167 issued on March 11, and April 4, 2003, respectively. The corrected KNPP TS pages for Amendment No. 165 are enclosed in Enclosure 2. The corrected KNPP TS pages for Amendment No. 167 are enclosed in Enclosure 3.

Mr. T. Coutu If there are any comments or questions concerning this letter, please contact me at (301) 415-1446.

Sincerely,

/RA/

John G. Lamb, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-305

Enclosures:

1. Corrected KNPP TS page TS 2.3-2
2. Corrected KNPP TS pages for Amendment No. 165
3. Corrected KNPP TS pages for Amendment No. 167 cc: See next page

ML031140632 OFFICE PDIII-1/PM PDIII-1/LA PDIII-1/SC NAME JLamb THarris LRaghavan DATE 04/24/03 04/24/03 04/24/03 Kewaunee Nuclear Power Plant cc:

John Paul Cowan Jonathan Rogoff, Esquire Chief Nuclear Officer General Counsel, Nuclear Management Company, LLC Nuclear Management Company, LLC 27780 Blue Star Memorial Highway 700 First Street Cover, MI 49043 Hudson, WI 54016 Kyle Hoops Larry L. Weyers Plant Manager Chairman, President and CEO Kewaunee Nuclear Power Plant Wisconsin Public Service Corporation N490 Highway 42 600 North Adams Street Kewaunee, WI 54216-9511 Greey Bay, WI 54307-9002 Gordon P. Arent David Zellner Manager, Regulatory Affairs Chairman - Town of Carlton Kewaunee Nuclear Power Plant N2164 County B N490 Highway 42 Kewaunee, WI 54216 Kewaunee, WI 54216-9511 Sarah Jenkins David Molzahn Electric Division Nuclear Asset Manager Public Service Commission of Wisconsin Wisconsin Public Service Corporation PO Box 7854 600 N. Adams Street Madison, WI 53707-7854 Green Bay, WI 54307-9002 Thomas Webb Nuclear Asset Manager Wisconsin Public Service Corporation 600 N. Adams Street Green Bay, WI 54307-9002 Resident Inspectors Office U. S. Nuclear Regulatory Commission N490 Hwy 42 Kewaunee, WI 54216-9510 Regional Administrator Region III U. S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351