Letter Sequence Draft RAI |
---|
TAC:MB5717, Delete SR Frequencies Based on Inoperable Alarms (Approved, Closed) |
|
MONTHYEARML0217906482002-07-0303 July 2002 Request for Additional Information Re Proposed Revision to Kewaunee Nuclear Power Plant Design Basis Radiological Analysis Accident Source Term Project stage: RAI ML0222504372002-08-16016 August 2002 Letter Regarding Review of Submittals Supporting Future Measurement Uncertainty Recapture Power Uprate Project stage: Approval ML0222502672002-08-23023 August 2002 RAI Related to Environmental Qualification for Design-Basis Radiological Analysis Accident Source Term Project stage: RAI ML0222803682002-09-0505 September 2002 Withholding from Public Disclosure, WCAP-15591, MB5718 Project stage: Other ML0231601992002-10-31031 October 2002 E-mail Enclosure, from John Lamb. Provides Draft RAIs for COLR Proposed Amendment for Kewaunee Project stage: Draft RAI ML0231203332002-11-0808 November 2002 Review Regarding Proposed Amendment Request, Core Operating Limits Report (Colr), July 26, 2002 Project stage: Other ML0232600442002-11-21021 November 2002 RAI, Core Operating Limits Report Project stage: RAI ML0233005512002-11-21021 November 2002 E-mail from John Lamb to Ted Maloney Dated November 21, 2002 RAI for Kewaunee Concerning Technical Specification Changes for Use of Westinghouse Vantage Plus Fuel Project stage: RAI ML0233004762002-11-22022 November 2002 Review Regarding Proposed Amendment Request Conforming Technical Specification Changes for Use of Westinghouse Vantage+ Fuel Dated July 26, 2002 Project stage: Other ML0234402972002-12-10010 December 2002 Review Regarding Proposed Amendment Request Conforming TS Changes for Use of Westinghouse Vantage+ Fuel, Dated July 26, 2002 Project stage: Other ML0236501342002-12-31031 December 2002 Review Regarding Proposed Amendment Request Conforming Technical Specification Changes for Use of Westinghouse Vantage+ Fuel, Dated July 26, 2002 Project stage: Other ML0302104852003-01-21021 January 2003 RAI, Proposed Amendment Request Conforming TS Changes for Use of Westinghouse Vantage+ Fuel Project stage: RAI ML0306901422003-02-27027 February 2003 NMC Responses to NRC Request for Additional Information Concerning License Amendment Request 187 Project stage: Response to RAI ML0306901592003-02-27027 February 2003 Part 2, Kewaunee, NMC Responses to NRC Request for Additional Information Concerning License Amendment Request 187 Project stage: Response to RAI ML0307200612003-03-11011 March 2003 TS Pages for Amendment No. 165, Implement a Core Operating Limits Report Project stage: Request ML0307200492003-03-11011 March 2003 Attachment to Safety Evaluation Re Amendment No. 165, Implement a Core Operating Limits Report Project stage: Request ML0307004562003-03-11011 March 2003 License Amendment, Implement a Core Operating Limits Report Project stage: Other ML0302100622003-03-17017 March 2003 Issuance of Amendment No. 166, Revising the Current Radiological Consequence Analyses for the Kewaunee Design-Basis Accidents to Implement the Alternate Source Term as Described in Regulatory Guide 1.183 & Pursuant to 10 CFR 50.67 Project stage: Approval ML0309200202003-03-19019 March 2003 License Amendment Request 187 to the Kewaunee Nuclear Power Plant TS Project stage: Request ML0310504932003-04-0303 April 2003 Response to a Question Concerning License Amendment Request 187 to Kewaunee TS, Conforming TS Changes for Use of Westinghouse Vantage + Fuel. Project stage: Request ML0309707962003-04-0404 April 2003 Tech Spec Pages for Amendment No. 167 to License No. DPR-43 Project stage: Acceptance Review ML0309402762003-04-0404 April 2003 License Amendment 167, Revises TSs for Use of Westinghouse 422 Vantage+ Nuclear Fuel with Performance+ Features Project stage: Approval ML0311305052003-04-15015 April 2003 Correction to License Amendment 167 to the Kewaunee Nuclear Power Plant Technical Specifications Project stage: Other ML0311406322003-04-24024 April 2003 Correction to Issuance of License Amendment Nos. 165 and 167, Respectively, Approving Revisions to TSs 1.0, 2.1, 2.3, 3.1, 3.8, 3.10 & 6.9 Project stage: Approval ML0311806302003-04-24024 April 2003 Technical Specifications for Amendment No. 165, Corrected Pages Project stage: Acceptance Review ML0311806362003-04-24024 April 2003 Technical Specifications for Amendment No. 167, Corrected Pages Project stage: Acceptance Review ML0315007242003-05-22022 May 2003 License Amendment Request 195, Application for Stretch Power Uprate Project stage: Request 2002-09-05
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24030A0672024-01-26026 January 2024 Email EA Fonsi Notice to Kewaunee Solutions for Exemptions on Site Restoration Activities ML23268A4362023-09-21021 September 2023 Extension Date Approval for Request for Additional Information for Exemptions on Site Restoration Activities ML23134A0012023-05-0909 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No. 50-305) ML23129A0672023-05-0505 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request for Low-Level Radioactive Waste Transport Change from 20 to 45 Days Acknowledgement ML23100A0032023-04-0404 April 2023 Solutions - Acknowledgement Email Regarding Exemption Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No 50-305) ML23094A1442023-03-31031 March 2023 Solutions - Acknowledgement Email Regarding Exemption for Low-Level Radioactive Waste Transport within 20 Days (Docket No. 50-305) ML22108A1762022-04-14014 April 2022 E-mail: Proposed Order Conditions for In-Direct Transfer of Licenses Held by Energysolutions, LLC (Zion, TMI Unit-2, La Crosse Boiling Water Reactor, Kewaunee, Energysolutions Radioactive Materials License, and Energysolutions Export Licens ML22053A2992022-02-18018 February 2022 Email - Additional Time for Request for Additional Information Response Regarding Kewaunee Solutions Decommissioning Quality Assurance Program; NRC Response Included; (EPID L-2021-LLO-0002 and L-2021-DP3-0000) ML22027A3642022-01-26026 January 2022 KPS: CY2022 Inspection Plan, Docket No. 05000305, License No. DPR-43 ML22007A3182022-01-0707 January 2022 E-mail from C. Adams, State of Wisconsin, to K. Sturzebecher, NRC, Notification and Request Kewaunee Power Station License Transfer (L-2021-LLO-002) ML21348A0522021-12-0303 December 2021 E-mail to P. Schmidt, State of Wisconsin, from K. Sturzebecher, NRC - Notification and Request Kewaunee Power Station License Transfer ML21096A1332021-04-0606 April 2021 E-mail for Approval of Proprietary Withholding for Dominion Energy Exemptions for the Magnastor Storage Cask ML20015A3002020-01-14014 January 2020 KPS: CY2020 Master Inspection Plan ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19072A0652019-03-0606 March 2019 Conversation Record with T. Szymanski/Dominion Energy Response to 10 CFR 72.30(c)(3) in Triennial Update for Kewaunee ML19070A2642019-03-0505 March 2019 Email Conversation with T. Szymanski/Dominion Energy Decommissioning Funding Plan (Dfp): Kewaunee ML18351A2742018-12-17017 December 2018 KPS: CY2019 Master Inspection Plan ML17354A9382017-12-20020 December 2017 CY2018 Master Inspection Plan ML17156A0032017-06-0202 June 2017 NRR E-mail Capture - Acceptance for Review of Revision 24 to the Dominion Nuclear Facility Quality Assurance Program Description (QAPD) Topical Report (CAC Nos. MF9732-MF9739) ML17040A0222016-10-18018 October 2016 Wisconsin State Notification (LAR259-L53082) ML16287A7142016-10-13013 October 2016 E-mail - Request for Additional Information: Dominion Energy Kewaunee, Dominion Nuclear Connecticut and Virginia Electric Power Company Nuclear Facility Quality Assurance Program Description Topical Report ML16041A2732016-02-10010 February 2016 Final RAIs Regarding LAR 259 ML16054A2382015-10-14014 October 2015 E-44108 Attachment 8 E-mail from Stewart J. Yuen (Kewaunee Power Station) to Don Shaw (Areva) for Kewaunee Power Station ML15090A4872015-03-26026 March 2015 OEDO-15-00251 - Michael Mulligan, Citizen Ltr 2.206 - Emergency Ultrasonic Inspection Test or Best Available Flaw Detection Technology for USA Reactor Plants Similar to the Thousands of Cracks Discovered in Belgium Nuclear Power Plants ML15071A2752015-03-12012 March 2015 NRR E-mail Capture - Request for Additional Information on Kewaunee 50.54(p) Changes to Physical Security Plan - TAC MF5779 ML15057A2192015-02-25025 February 2015 NRR E-mail Capture - Acceptance Review: Dominion Fleet-Request for Approval of Cyber Security Plan (CSP) Revised Implementation Schedule ML14258A7432014-09-0505 September 2014 NRR E-mail Capture - FW: Comparison of Crystal River'S Exemption Secy Paper with Kewaunee'S ML14251A0972014-08-22022 August 2014 NRR E-mail Capture - Draft RAI to Kewaunee Power Station on Control Room Staffing Issue ML14164A0742014-06-0202 June 2014 NRR E-mail Capture - Draft Request for Additional Information Concerning Dek'S Request for Exemption from Conducting Annual Force-on-Force Exercises at Kewaunee Power Station ML14132A2062014-04-27027 April 2014 NRR E-mail Capture - Kewaunee Amendment Request for Emergency Plan Changes MF3411 - Draft RAIs ML14155A0402014-04-0707 April 2014 NRR E-mail Capture - Summarry of Kewaunee Mitigation Strategy Phone Call Last Week ML14134A5872014-04-0707 April 2014 NRR E-mail Capture - Minor Editorial/Typographical Changes to License Condition TAC MF1771) ML14097A5112014-04-0101 April 2014 NRR E-mail Capture - Draft RAI Related to Kewaunee Proposed Deletion of License Condition on Mitigation Strategy ML14069A3832014-03-0606 March 2014 NRR E-mail Capture - Draft RAI on Kewaunee Permanently Defueled Technical Specifications ML13312A2422013-11-0707 November 2013 NRR E-mail Capture - MF1952-RAII-SRXB-Cunana-002-2011-11-08, Request for Additional Information ML13297A0482013-10-23023 October 2013 NRR E-mail Capture - MF2567 - Kewaunee Eplan RAI #1 and Comparable Wording from Other Eplans ML13295A5672013-10-22022 October 2013 NRR E-mail Capture - MF2567 Kewaunee Exemption Nlar 102 (50.47 and 10 CFR Appendix E) Includes Kewaunee EP Briefing - 19 June 2013 Handout ML13275A0772013-10-0101 October 2013 NRR E-mail Capture - MF2743-RAII-AHPB-Keefe-001-2013-10-01 Request for Additional Information ML13275A0722013-10-0101 October 2013 NRR E-mail Capture - FW: MF1771-MF1952 RAI 9-27-2013.docx ML13275A0622013-09-27027 September 2013 NRR E-mail Capture - FW: MF2370 - Review of Training Plan for Certified Fuel Handler (CFH) Training - (Corrected) Request for Additional Information (RAI) ML13246A0032013-08-30030 August 2013 NRR E-mail Capture - Record of Docketing of Certifications Pertaining to Decommissioning of Kewaunee Power Station (KPS) ML13218B3722013-08-0606 August 2013 NRR E-mail Capture - MF1952 KPS Permanently Defueled License and TS - Request for Additional Information - MF1952-RAII-SCVB-Heida-001-2013-08-06 ML13186A0212013-07-0303 July 2013 NRR E-mail Capture - MF1771 - Correction to Stated Date Due for Request for Information Dated 6/26/2013 (ML13178A011) ML13178A0112013-06-26026 June 2013 NRR E-mail Capture - MF1771 (and Part of MF1952) - KPS - Record of Clarification Call and Associated Request for Additional Information (RAI) Deletion of License Condition 2.C.(15) ML13151A2452013-05-29029 May 2013 NRR E-mail Capture - Kewaunee Correspondence - Dispositioning Flawed Document, Summary of Facility Changes, Tests and Experiments and Summary of Commitment Changes ML13149A0412013-05-28028 May 2013 NRR E-mail Capture - MF1771 - Kewaunee LAR 255 Deletion of Licensing Condition 2.C.(15) - LIC-109 Acceptance Review Results ML13144A1002013-05-23023 May 2013 NRR E-mail Capture - Record of Docketing of Outgoing NRC Correspondence Serial No. 13-293: Certification of Permanent Removal of Fuel -- Confirming Successful EIE Docketing ML13134A5272013-05-14014 May 2013 NRR E-mail Capture - ML13133A086 = MF1438 - KPS - Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) - Acceptance Review Results ML13133A0862013-05-10010 May 2013 NRR E-mail Capture - FW: MF1438 KPS - Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) - Acceptance Review Results ML13128A3612013-05-0707 May 2013 NRR E-mail Capture - MD7112 - Record of Permanent Cessation of Operations 10CFR50.4(b)(8), 10CFR50.82, and the Scheduling of Certain Future Decommissioning Events 2024-01-26
[Table view] |
Text
From: John Lamb To: internet: GERALD.RISTE@nmcco.com Date: 10/31/2002 10:40:22 AM
Subject:
COLR Amendment Draft RAIs
- Gerry, The following are the draft RAIs for the COLR proposed amendment for Kewaunee:
- 1. Your proposed TS 1.0.r.b, "Shutdown Margin (SDM)," states that the SDM is calculated assuming the fuel and moderator temperatures are changed to the program temperature.
NUREG-1431, Vol. 1, Rev. 2, "Standard Technical Specifications, Westinghouse Plants," on the other hand, states that the SDM should be calculated assuming the temperatures are changed to the "nominal zero power design level." What is the difference between "program temperature" and "nominal zero power design level?" If there is a difference, why is it acceptable to use "program temperature" for establishing SDM?
- 2. In TS 2.1, "Safety Limits, Reactor Core," you added peak fuel centerline limits.
NUREG-1431 and WCAP-14483-A, "Generic Methodology for Expanded Core Operating Limits Report," both suggest using a peak fuel centerline temperature adjusted for fuel burnup.
How did you determine your proposed limit of 4700oF and why is this value acceptable? Also, up to what levels of fuel burnup did you account for when determining this value?
- 3. WCAP-14483-A requires that the COLR analytical methods be provided in your TSs. What analytical method did you use to calculate the OTDT and OPDT trip setpoints? Is this method included in your TSs? Are there any required analytical methods missing from your proposed TSs?
- 4. NUREG-1431 shows that the maximum upper limit for Moderator Temperature Coefficient (MTC) needs to be included in the TSs. Your proposed TS 3.1.f.3 does not include this limit.
Why is this proposal acceptable?
- 5. Your proposed Figure 2 of the COLR does not match the original Figure TS 3.10-1.
Specifically, the required shutdown reactivity at 0 full power equilibrium boron concentration increased from 2000 pcm to 2200 pcm. Why is this change acceptable? Did you perform a 50.59 evaluation for this change?
- 6. Kewaunee TS 3.8.a.5, "Refueling Operations," requires that a shutdwon margin of greater than 5% Dk/k be maintained during refueling operations. However, you did not retain this requirement in your proposed COLR. Explain why this omitting this value from the COLR is acceptable.
Please let me know when you are available to discuss the draft RAIs via a conference call.
John