MONTHYEARML0217906482002-07-0303 July 2002 Request for Additional Information Re Proposed Revision to Kewaunee Nuclear Power Plant Design Basis Radiological Analysis Accident Source Term Project stage: RAI ML0222504372002-08-16016 August 2002 Letter Regarding Review of Submittals Supporting Future Measurement Uncertainty Recapture Power Uprate Project stage: Approval ML0222502672002-08-23023 August 2002 RAI Related to Environmental Qualification for Design-Basis Radiological Analysis Accident Source Term Project stage: RAI ML0222803682002-09-0505 September 2002 Withholding from Public Disclosure, WCAP-15591, MB5718 Project stage: Other ML0231601992002-10-31031 October 2002 E-mail Enclosure, from John Lamb. Provides Draft RAIs for COLR Proposed Amendment for Kewaunee Project stage: Draft RAI ML0231203332002-11-0808 November 2002 Review Regarding Proposed Amendment Request, Core Operating Limits Report (Colr), July 26, 2002 Project stage: Other ML0232600442002-11-21021 November 2002 RAI, Core Operating Limits Report Project stage: RAI ML0233005512002-11-21021 November 2002 E-mail from John Lamb to Ted Maloney Dated November 21, 2002 RAI for Kewaunee Concerning Technical Specification Changes for Use of Westinghouse Vantage Plus Fuel Project stage: RAI ML0233004762002-11-22022 November 2002 Review Regarding Proposed Amendment Request Conforming Technical Specification Changes for Use of Westinghouse Vantage+ Fuel Dated July 26, 2002 Project stage: Other ML0234402972002-12-10010 December 2002 Review Regarding Proposed Amendment Request Conforming TS Changes for Use of Westinghouse Vantage+ Fuel, Dated July 26, 2002 Project stage: Other ML0236501342002-12-31031 December 2002 Review Regarding Proposed Amendment Request Conforming Technical Specification Changes for Use of Westinghouse Vantage+ Fuel, Dated July 26, 2002 Project stage: Other ML0302104852003-01-21021 January 2003 RAI, Proposed Amendment Request Conforming TS Changes for Use of Westinghouse Vantage+ Fuel Project stage: RAI ML0306901422003-02-27027 February 2003 NMC Responses to NRC Request for Additional Information Concerning License Amendment Request 187 Project stage: Response to RAI ML0306901592003-02-27027 February 2003 Part 2, Kewaunee, NMC Responses to NRC Request for Additional Information Concerning License Amendment Request 187 Project stage: Response to RAI ML0307200612003-03-11011 March 2003 TS Pages for Amendment No. 165, Implement a Core Operating Limits Report Project stage: Request ML0307200492003-03-11011 March 2003 Attachment to Safety Evaluation Re Amendment No. 165, Implement a Core Operating Limits Report Project stage: Request ML0307004562003-03-11011 March 2003 License Amendment, Implement a Core Operating Limits Report Project stage: Other ML0302100622003-03-17017 March 2003 Issuance of Amendment No. 166, Revising the Current Radiological Consequence Analyses for the Kewaunee Design-Basis Accidents to Implement the Alternate Source Term as Described in Regulatory Guide 1.183 & Pursuant to 10 CFR 50.67 Project stage: Approval ML0309200202003-03-19019 March 2003 License Amendment Request 187 to the Kewaunee Nuclear Power Plant TS Project stage: Request ML0310504932003-04-0303 April 2003 Response to a Question Concerning License Amendment Request 187 to Kewaunee TS, Conforming TS Changes for Use of Westinghouse Vantage + Fuel. Project stage: Request ML0309707962003-04-0404 April 2003 Tech Spec Pages for Amendment No. 167 to License No. DPR-43 Project stage: Acceptance Review ML0309402762003-04-0404 April 2003 License Amendment 167, Revises TSs for Use of Westinghouse 422 Vantage+ Nuclear Fuel with Performance+ Features Project stage: Approval ML0311305052003-04-15015 April 2003 Correction to License Amendment 167 to the Kewaunee Nuclear Power Plant Technical Specifications Project stage: Other ML0311406322003-04-24024 April 2003 Correction to Issuance of License Amendment Nos. 165 and 167, Respectively, Approving Revisions to TSs 1.0, 2.1, 2.3, 3.1, 3.8, 3.10 & 6.9 Project stage: Approval ML0311806302003-04-24024 April 2003 Technical Specifications for Amendment No. 165, Corrected Pages Project stage: Acceptance Review ML0311806362003-04-24024 April 2003 Technical Specifications for Amendment No. 167, Corrected Pages Project stage: Acceptance Review ML0315007242003-05-22022 May 2003 License Amendment Request 195, Application for Stretch Power Uprate Project stage: Request 2002-09-05
[Table View] |
|
---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000305/20240022024-08-22022 August 2024 NRC Inspection Report 05000305/2024002 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24136A1952024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML24130A0022024-05-0909 May 2024 Summary of Facility Changes, Tests and Experiments and Commitment Changes IR 05000305/20240012024-05-0202 May 2024 NRC Inspection Report No. 05000305/2024001 ML24121A2472024-04-29029 April 2024 And Three Mile Island, Unit 2 - 2023 Occupational Radiation Exposure Annual Report ML24101A0422024-04-22022 April 2024 Solutions Inc. – Exemption from Select Requirements of 10 CFR Part 73 ((Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24106A0492024-04-15015 April 2024 2023 Annual Radioactive Effluent Release Report ML24080A0702024-03-20020 March 2024 Decommissioning Trust Fund Annual Report ML24079A0162024-03-19019 March 2024 Annual Property Insurance Status Report ML24073A2312024-03-13013 March 2024 And Three Mile Island Nuclear Station, Unit 2 - Management Change ML24061A0202024-02-15015 February 2024 (Ksp) ISFSI, Submittal of Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 6 ML23339A1332024-01-26026 January 2024 Exemption from the Req of 10 CFR Part 50.82(a)(8)(i)(A) to Use the Kewaunee Decommissioning Trust Fund for the Management of Site Restoration Activities IR 05000305/20230022023-12-27027 December 2023 NRC Inspection Report 05000305/2023002 (Drss); 07200064/2023001 (Drss) ML23332A1922023-11-28028 November 2023 Solutions, Inc., Request for Exemptions from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23278A1002023-10-0505 October 2023 Response to Request for Additional Information (RAI) Application for Kewaunee Solutions (Ks) Site Restoration Activities ML23222A1522023-08-29029 August 2023 Letter RAI KPS Exemption Site Restoration Final Repaired IR 05000305/20230012023-08-17017 August 2023 NRC Inspection Report No. 05000305/2023001-Kewaunee Power Station ML23171B0822023-07-0505 July 2023 Letter - Kewaunee Power Station - Issuance of Exemption from Certain Requirements from 10 CFR Part 20, Appendix G, Section Iii.E ML23132A0012023-05-11011 May 2023 2022 Annual Radiological Environmental Operating Report ML23116A2182023-04-26026 April 2023 2022 Annual Radioactive Effluent Release Report ML23089A3042023-03-30030 March 2023 Decommissioning Fund Status Report ML23088A2752023-03-29029 March 2023 Solutions, Inc., Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML23093A0312023-03-29029 March 2023 Solutions, Inc., Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) for Site Restoration Activities ML23087A0292023-03-27027 March 2023 2022 Annual Report of Occupational Radiation Exposure ML23087A0402023-03-27027 March 2023 Annual Property Insurance Status Report ML23066A3232023-03-0707 March 2023 Energysolutions, LLC, Notification of Closing of Transaction ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23024A0122023-01-26026 January 2023 Letter to Energysolutions Transmitting Threshold Determination for Merger/Restructuring IR 05000305/20220022023-01-0303 January 2023 NRC Inspection Report Nos. 05000305/2022002(DRSS) – Kewaunee Power Station ML22292A2302022-11-25025 November 2022 U.S. Nuclear Regulatory Commission’S Analysis of Dominion Energy Kewaunee‘S Decommissioning Funding Status Report for Kewaunee Power Station, Docket No. 50-305 ML22290A0052022-10-13013 October 2022 Resubmittal of Kewaunee Power Station Independent Spent Fuel Storage Installation (ISFSI) Only Emergency Plan (Ioep) and IOEP- Emergency Action Level (EAL) Basis Document, Revision 0KS ML24061A0182022-08-25025 August 2022 (Ksp) ISFSI Submittal of Security Pla11, Training and Qualification Plan and Safeguards Contingency Plan Revision 5 ML22241A0302022-08-25025 August 2022 (Ksp) ISFSI Submittal of Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 5 IR 05000305/20220012022-08-0101 August 2022 NRC Inspection Report Nos. 05000305/2022001(DNMS) - Kewaunee Power Station ML22215A1512022-07-27027 July 2022 Executed Financial Assurance Instruments for the Kewaunee License Transfer License No. DPR-43 (Docket Nos. 50-305, 72-64) ML22209A1252022-07-26026 July 2022 Amendment No. 11 to Indemnity Agreement No. B-53 for Kewaunee Power Station (KPS) - Signed by Kewaunee Solutions, Inc ML22175A1132022-06-30030 June 2022 Solutions, Inc. - Letter for Review and Acceptance of the Energysolutions, LLC Decommissioning Quality Assurance Program with Enclosure ML22160A5262022-06-28028 June 2022 Letter - KPS - Issuance of Conforming License Amendment Regarding Indirect Transfer of License from DEK, Inc. to Kewaunee Solutions, Inc ML22160A5282022-06-28028 June 2022 Enclosure 2 - Amendment No. 11 to Indemnity Agreement B-53 ML22160A5272022-06-28028 June 2022 Enclosure 1 - Amendment No. 221 to Renewed Facility Operating License No. DPR-43 ML22188A0812022-06-23023 June 2022 ISFSI, Virgil C. Summer Nuclear Station, Unit 1 & ISFSI, North Anna Power Station, Units 1 & 2 & ISFSI, Surry Power Station, Units 1 & 2 & ISFSI - Submission of Revision 32 of the Quality Assurance Topical Report ML22172A2452022-06-22022 June 2022 Notification of Planned Closing Date and Required Regulatory Approvals for the Kewaunee License Transfer Transaction ML22175A0662022-06-17017 June 2022 Designation of Additional Reviewing Official for ISFSI and 10 CFR Part 37 Program Security Background Investigations ML22166A3392022-06-13013 June 2022 Notification of Nuclear Insurance ML22138A2552022-05-10010 May 2022 Submittal of 2021 Annual Radiological Environmental Operating Report ML22158A2112022-05-10010 May 2022 Summary of Facility Changes, Tests and Experiments and Summary of Commitment Changes ML22091A1892022-04-0101 April 2022 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report ML22108A0352022-04-0101 April 2022 License Transfer to Kewaunee Solutions, Inc 2024-09-18
[Table view] |
Text
Nur l Committed to Nuclear Excellene Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC NRC-03-040 10 CFR 50.90 April 15, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 CORRECTION TO LICENSE AMENDMENT 167 TO THE KEWAUNEE NUCLEAR POWER PLANT TECHNICAL SPECIFICATIONS
Reference:
- 1) Letter from John G. Lamb (NRC) to Thomas Coutu (NMC), "Kewaunee Nuclear Power Plant - Issuance of Amendment (TAC NO. MB5718) dated April 4, 2003. (ML030940276)
In the referenced letter the Nuclear Regulator Commission (NRC) issued an amendment to the Kewaunee Nuclear Power Plants Technical Specifications (TS). TS page TS 2.3-2 was issued including both the information stricken, which was to be removed, and the information to be added. The Nuclear Management Company (NMC) hereby encloses TS page TS 2.3-2 with the stricken information removed and requests the NRC reissue KNPP TS page TS 2.3-2 associated with license amendment 167.
If there are any comments or questions concerning this request please contact Mr. Gerald Riste, of my staff, at (920) 388-8424.
yo 'lrg Thomas Coutu Site Vice-President, Kewaunee Plant GOR cc- US NRC, Region IlIl US NRC Senior Resident Inspector Electric Division, PSCW Enclosed KNPP TS page 2.3-2
\,LlDA N490 Highway 42
- Kewaunee, Wisconsin 54216-9510 Telephone 920.388 2560
- 3. Reactor Coolant Temperature A. Overtemperature AT *ATo [Ki-K 2 (T-T')I+ J IS+K3(P-P )-f(AI)]
1 + T12 S where ATo = Indicated AT at RATED POWER, %
T = Average temperature, 'F
- [*]F P = Pressurizer pressure, psig PI [*1 psig K, =[*]
K2 = []1 K3 = [*]
Ti [*] sec.
[*] sec.
f(AI) An even function of the indicated difference between top and bottom detectors of the power-range nuclear ion chambers. Selected gains are based on measured instrument response during plant startup tests, where qt and qb are the percent power in the top and bottom halves of the core respectively, and qt + qb is total core power in percent of RATED POWER, such that:
- 1. For qt - qbwithin [*] [*% f (Al) = °-
- 2. For each percent that the magnitude of qt - qb exceeds [*] % the AT trip setpoint shall be automatically reduced by an equivalent of [*] %
of RATED POWER.
- 3. For each percent that the magnitude of qt - qb exceed -[*] % the AT trip setpoint shall be automatically reduced by an equivalent of [*] %
of RATED POWER.
Note: [*] As specified in the COLR Amendment No. 167 TS 2.3-2 04/04/2003