ML20065B013

From kanterella
Revision as of 23:57, 21 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notifies That B&W Final Rept Re Supplemental ECCS Calculations Will Not Be Completed Before 830301.Util Will Review & Submit Rept to NRC on or Before 830404
ML20065B013
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/15/1983
From: Baynard P
FLORIDA POWER CORP.
To: Lainas G
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0630, RTR-NUREG-630 3F-0283-15, 3F-283-15, NUDOCS 8302220360
Download: ML20065B013 (1)


Text

,e d f h

@Dhb5$

k 3;MM.

it;hdQuu?

%ooz#

M Power CORPORAT8ON February 15, 1983 3F-0283-15 Director of Nuclear Reactor Regulation Attention: Mr. Gus C. Lainas, Assistant Director Safety Assessment Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 NUREG-0630, Cladding Swelling and Rupture Models for LOCA Analysis

Dear Sir:

In Florida Power Corporation's (FPC) letters dated August 13, 1982 and October 14, 1982, FPC committed to submit a short-term report concerning rupplemental Emergency Core Cooling Systems calculations. The issuance of this report has been delayed due to the new LOCA kW/ft limits. These LOCA kW/ft limits are currently being calculated for Crystal River 3.

The final report by Babcock & Wilcox will not be completed before March 1, 1983. FPC will review and submit the report to the NRC on or before April 4,1983.

Sincerely, 0n ). f27,ani

> r. tsy Y. Baynard Assistant to Vice President Nuclear Operations Wheeler (M01)C2-3 cc: Mr. J. P. O'Reilly Regional Administrator, Region II 9 0l U.S. Nuclear Regulatory Commission l 101 Marietta Street N.W., Suite 3100 Atlanta, GA 30303 8302220360 830215 p DR ADOCK 05000302 PDR General Office 3201 inirty-fourin street soutn . P O Box 14042. St Petersburg Florida 33733 813-866-5151