January 2004 Monthy Operating Report for Diablo Canyon, Units 1 and 2
ML040540837
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/13/2004
From: Becker J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-04-015, GL-97-002
Download: ML040540837 (7)


Text

Pacific Gasand ElectricCompany James R.Becker Diablo Canyon Power Plant Vice President-Diablo Canyon PO. Box 56 Operations and Station Director Avila Beach, CA 93424 February 13, 2004 805.545.3462 Fax: 805.545.4234 PG&E Letter DCL-04-015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Monthlv Operatinq Report for Januarv 2004

Dear Commissioners and Staff:

Enclosed is the Monthly Operating Report for Diablo Canyon Power Plant, Units 1 and 2, for January 2004. This report is submitted in accordance with Technical Specification 5.6.4 and NRC Generic Letter 97-02.

Sincer Iy, James R.

smg/1 713/R0254858 Enclosures cc/enc: Paul R. Fox, American Nuclear Insurers Robert D. Glynn, Jr.

Bruce S. Mallett, NRC Regional Administrator, Region IV David L. Proulx, NRC Senior Resident Inspector Gregory M. Rueger Girija S. Shukla, NRC Project Manager INPO Record Center A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Enclosure 1 PG&E Letter DCL-04-015 JANUARY 2004, OPERATION SUMMARIES DIABLO CANYON POWER PLANT UNITS I AND 2 Summary of Unit I Operation Unit 1 began the month in Mode I (Power Operation) at approximately 100 percent power. On January 15, 2004, operators commenced a planned ramp to approximately 50 percent power to inspect the condenser for saltwater in-leakage. After the condenser tube inspections were completed, operators commenced ramping to full power and reached approximately 100 percent power on January 18, 2004. Unit 1 remained at approximately 100 percent for the remainder of the month.

Summary of Unit 2 Operation Unit 2 remained in Mode 1, at approximately 100 percent power, during January 2004.

There were no significant operational activities.

Actuations of Pressurizer Safety or Power-Operated Relief Valves There were no challenges to the pressurizer power-operated relief valves, pressurizer safety valves, or steam generator safety valves.

Enclosure 2 PG&E Letter DCL-04-015 OPERATING DATA REPORT DOCKET NO.: 50-275 UNIT NAME: Diablo Canyon Unit 1 DATE: 2/03/2004 COMPLETED BY: S. Guess TELEPHONE: (805) 545-4692 REPORT MONTH: January 2004 I 1. I Design Electrical Rating (Mwe - Net): I 1,103

2. Maximum Dependable Capacity (Mwe - Net): 1,087 This Month YTD Cumulative
3. Number of Hours Reactor Critical: 744.0 744.0 143,730.8
4. Number of Hours Generator On-Line: 744.0 744.0 142,213.6
5. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
6. Net Electrical Energy Generated (MWH): 791,429 791,429 147,583,159 1

Enclosure 2 PG&E Letter DCL-04-015 UNIT SHUTDOWNS DOCKET NO.: 50-275 UNIT NAME: Diablo Canyon Unit 1 DATE: 2/03/2004 COMPLETED BY: S. Guess TELEPHONE: (805) 545-4692 REPORT MONTH: January 2004 NO. DATE TYPE DURATION REASON' METHOD CAUSE & CORRECTIVE (YM)F (Forced) (HOURS) OF ACTIONS L S (Scheduled) SHUTTING COMMENTS DOWN 2 CMET lN/AThere were no shutdowns this month.

1. Reason 2. Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training/License Examination 5-Other F-Administrative G-Operational Error (Explain)

H-Other (Explain) 2

Enclosure 2 PG&E Letter DCL-04-015 OPERATING DATA REPORT DOCKET NO.: 50-323 UNIT NAME: Diablo Canyon Unit 2 DATE: 2/03/2004 COMPLETED BY: S. Guess TELEPHONE: (805) 545-4692 REPORT MONTH: January 2004 I 1. I Design Electrical Rating (MWe - Net): I 1119 I

2. Maximum Dependable Capacity (MWe - Net): 1087 This Month I YTD Cumulative
3. Number of Hours Reactor Critical: 744.0 744.0 139,393.9
4. Number of Hours Generator On-Line: 744.0 744.0 137,858.1
5. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
6. Net Electrical Energy Generated (MWH): 812,031 812,031 145,229,248 3

Enclosure 2 PG&E Letter DCL-04-015 UNIT SHUTDOWNS DOCKET NO.: 50-323 UNIT NAME: Diablo Canyon Unit 2 DATE: 2/03/2004 COMPLETED BY: S. Guess TELEPHONE: (805) 545-4692 REPORT MONTH: January 2004 NO. DATE TYPE DURATION REASON' METHOD CAUSE & CORRECTIVE (YM )F (Forced) (HOURS) OF ACTIONS S(Scheduled)

S(YYMMDD) = SHUTTING COMMENTS N/AThere were no shutdowns this month.

1. Reason 2. Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training/License Examination 5-Other F-Administrative G-Operational Error (Explain)

H-Other (Explain) 4

TRACKING MEMO (Remove prior to NRC submittal)

Document: PG&E Letter DCL 04-015 Version: 2/03/2004

Subject:

Monthly Operating Report for January 2004 File Location: S:\RS\RA\MOR\DCLO401 5.doc FSAR Update Review zing the guidance in X13.1D2, does the FSAR Update need to be revised? Yes El No Z

  • If "Yes", submit an FSAR Update Change Request in accordance with X13.1D2 (or if this is an LAR, process in accordance with WG-9)

Commitment #1 None A0479867 identifies incorrect outage data in previous submittals due to the definition used by "GENSTATS" not matching NRC's definition of Net Generation. Although the correction for prior years has not been submitted to the NRC, starting in 1999, "negative net generation" (power used during outages) is excluded; so the data submitted matches NRC's definition. However, unless GENSTATS is corrected, submitted data will diverge from GENSTATS.

The method is described in Draft Work Guideline 8. Additional errors were introduced during I R10 and 2R1 0; reference A0521936, and A0535381.

  • InNovember 2001, a new database was created to replace GENSTATS. The new database corrected previous years' data. The new database islocated in httn://wwwnoq/businfo/Qenstats/aen detail monthlv.xls, and the daily shutdown hours are at htto://wwwnoa/businfo/aenstats/aen detail dailv 2003.xis The differences between the reported data and the databases since 1999 are:

Unit Month/Year Correction Correction in Correction in in Month Year (MWH) Lifetime (MWH)

(MWH) 1 Total 1999 N/A 17,246 17,246 1 Total 2000 N/A 29,420 46,666 1 Total 2001* N/A 964 -2,660* = 44,970 1 Total 2002 N/A 28,008 72,978 2 Total 1999 N/A 10,544 10,544 2 Total 2000 N/A 6,746 17,290 2 Total 2001* NIA + 1,720 = 9,997 +1,944* = 27,511 2 Total 2002 N/A 1,052 28,563 2 Feb 2003 2,210 2,210 30,773 2 Mar2003 14,675 16,885 45,448 2 Apr2003 8,734 25,619 54,182 NRC Performance Indicators described in this report:

Unit Hours Rx Scrams Unplanned Critical Unplanned W/O Heat Power Sink Changes 1 yes none None none 2 1yes none None none