Annual Assessment Letter - Callaway Plant (NRC Report 05000483-04-001)
ML040631074
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/03/2004
From: Mallett B
NRC Region 4
To: Edington R
Nebraska Public Power District (NPPD)
References
IR-04-001
Download: ML040631074 (10)


Text

rch 3, 2004

SUBJECT:

ANNUAL ASSESSMENT LETTER - CALLAWAY PLANT (NRC REPORT 05000483/2004001)

Dear Mr. Randolph:

On February 4, 2004, the NRC staff completed its end-of-cycle plant performance assessment of Callaway Plant. The end-of-cycle review for Callaway Plant involved the participation of all technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2003. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.

Overall, Callaway Plant operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Regulatory Response Column of the NRCs Action Matrix, based on one finding of low to moderate safety significance (White) in the Emergency Preparedness cornerstone.

Callaway Plant staff failed to provide tone alert radios to some local residents that were not within emergency siren coverage areas. Your staff identified the issue, distributed the missing tone alert radios, and instituted procedure and audit revisions to ensure that future service area residence changes would be captured and tone alert radios appropriately distributed. NRC staff conducted a supplemental inspection in September 2003 and concluded that the root causes of the finding were appropriately evaluated and understood. We also determined that appropriate corrective actions were implemented.

In our midcycle assessment letter, dated August 27, 2002, we advised you of a substantive crosscutting issue in the area of Problem Identification and Resolution. This issue was updated in our annual assessment letter dated March 4, 2003, and again in our midcycle assessment letter dated August 27, 2003. NRC acknowledges that a number of programmatic changes have been implemented to address this issue, including implementation of a Corrective Action Review Board and expanded training in activities associated with the corrective action program.

Although improvement has been noted, instances of ineffective corrective actions continue to be identified. During the past 12 months, five findings related to ineffective problem identification and resolution were identified. We will continue to monitor your performance with

Union Electric Company -2-regard to this substantive crosscutting issue during implementation of the baseline inspection program, which includes a problem identification and resolution team inspection. Additionally, NRC requests that Callaway Plant provide a response to the issues raised in this letter at the public meeting to discuss NRCs assessment of Callaway Plant performance. The details regarding date, time, and location for this public meeting will be provided by separate correspondence.

As you are aware, the NRC has issued several Orders and threat advisories to enhance security capabilities and improve guard force readiness since the terrorist attacks on September 11, 2001. We have conducted inspections to review your implementation of these requirements and have monitored your actions in response to changing threat conditions. For calendar year 2004, we plan to continue inspections of Order implementation combined with newly developed portions of the security baseline inspection program. The enclosed inspection plan details the inspections scheduled through September 30, 2005. In addition to the baseline inspections, NRC will also be conducting inspections related to Temporary Instruction 2515/152, Reactor Pressure Vessel Lower Head Penetration Nozzles (NRC Bulletin 2003-02),

and Temporary Instruction 2515/153, Reactor Containment Sump Blockage (NRC Bulletin 2003-01). The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 12 months of the inspection plan are tentative and may be revised at the midcycle review meeting.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact David N. Graves at 817/860-8141 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/ by MASatorius for Arthur T. Howell III, Director Division of Reactor Projects Docket: 50-483 License: NPF-30 Enclosure:

Callaway Plant Inspection/Activity Plan

Union Electric Company -3-cc w/enclosure:

Professional Nuclear Consulting, Inc.

19041 Raines Drive Derwood, MD 20855 John ONeill, Esq.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W.

Washington, DC 20037 Mark A. Reidmeyer, Regional Regulatory Affairs Supervisor Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251 Manager - Electric Department Missouri Public Service Commission 301 W. High P.O. Box 360 Jefferson City, MO 65102 Ronald A. Kucera, Deputy Director for Public Policy Department of Natural Resources P.O. Box 176 Jefferson City, MO 65102 Rick A. Muench, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 Dan I. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, MO 63130 Chris R. Younie, Manager Quality Assurance AmerenUE P.O. Box 620 Fulton, MO 65251

Union Electric Company -4-Jerry Uhlmann, Director State Emergency Management Agency P.O. Box 116 Jefferson City, MO 65102-0116 Scott Clardy, Director Section for Environmental Public Health P.O. Box 570 Jefferson City, MO 65102-0570 Keith D. Young, Manager Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251 David E. Shafer Superintendent, Licensing Regulatory Affairs AmerenUE P.O. Box 66149, MC 470 St. Louis, MO 63166-6149 Certrec Corporation 4200 South Hulen, Suite 630 Fort Worth, TX 76109 Tim Diemler Emergency Preparedness Director Callaway County/Fulton P.O. Box 817 Fulton, MO 65251 Lee Fritz Presiding Commissioner Callaway County Courthouse 10 East 5th Street Fulton, MO 65251 Robert Rankin Eastern District Commissioner Callaway County Courthouse 10 East 5th Street Fulton, MO 65251

Union Electric Company -5-Rodney Garnett Western District Commissioner Callaway County Courthouse 10 East 5th Street Fulton, MO 65251 The Honorable Robert Craghead Mayor of Fulton Fulton City Hall P.O. Box 130 Fulton, MO 65251 William Johnson Fulton City Administrator Fulton City Hall P.O. Box 130 Fulton, MO 65251 Steve Myers Deputy Chief of Police Fulton City Hall P.O. Box 130 Fulton, MO 65251 Dennis Crane Sheriff, Callaway County P.O. Box 817 Fulton, MO 65251 The Honorable Tom Shackelford Mayor of Mokane P.O. Box 41 Mokane, MO 65059 Richard Hudson, Director Emergency Management Gasconade County Courthouse P.O. Box 295 Hermann, MO 65041 Ron Jost Presiding Commissioner Gasconade County Courthouse 119 East First Street Hermann, MO 65041

Union Electric Company -6-Max Aubuchon Northern District Commissioner Gasconade County Courthouse 119 East First Street Hermann, MO 65041 Jerry Lairmore Southern District Commissioner Gasconade County Courthouse 119 East First Street Hermann, MO 65041 Glenn Ebker Sheriff, Gasconade County Gasconade County Courthouse 119 East First Street Hermann, MO 65041 Fay Owsley Gasconade County Public Administrator Gasconade County Courthouse 119 East First Street Hermann, MO 65041 The Honorable Samuel Birk Mayor of Morrison Route 1 Morrison, MO 65061 Bob Bishop Emergency Management Director Montgomery County Courthouse 211 East Third Montgomery City, MO 63361 Charles Korman Presiding Commissioner Montgomery County Courthouse 211 East Third Montgomery City, MO 63361 Rich Daniels First District Commissioner Montgomery County Courthouse 211 East Third Montgomery City, MO 63361

Union Electric Company -7-John Noltensmeyer Second District Commissioner Montgomery County Courthouse 211 East Third Montgomery City, MO 63361 Robert Davis Sheriff, Montgomery County Montgomery County Courthouse 211 East Third Montgomery City, MO 63361 The Honorable Steve Wehrle Mayor of Rhineland P.O. Box 384 Rhineland, MO 65069 Bradley Strope Emergency Management Director Osage County Courthouse P.O. Box 1011 Linn, MO 65051 Russell J. Scheulen Presiding Commissioner Osage County Courthouse P.O. Box 826 Linn, MO 65051 Jerry G. Wolfe First District Commissioner Osage County Courthouse P.O. Box 826 Linn, MO 65051 Daryl L. Luecke Second District Commissioner Osage County Courthouse P.O. Box 826 Linn, MO 65051 Carl Fowler Sheriff, Osage County Osage County Courthouse P.O. Box 826 Linn, MO 65051

Union Electric Company -8-The Honorable Vernon McKague Mayor of Chamois Star Route Chamois, MO 65024 Institute of Nuclear Power Operations (INPO)

700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339

Union Electric Company -9-Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

Senior Resident Inspector (MSP)

Branch Chief, DRP/B (DNG)

Senior Project Engineer, DRP/B (RAK1)

Staff Chief, DRP/TSS (PHH)

RITS Coordinator (NBH)

RidsNrrDipmIipb V. Dricks, PAO (VLD)

W. A. Maier, RSLO (WAM)

C. J. Gordon (CJG)

DRS Branch Chiefs (LJS, TWP, ATG, CSM)

W. D. Travers, EDO (WDT)

S. A. Richards, Chief, NRR/DIPM/IIPB (SAR)

R. K. Frahm, PPR Program Manager, NRR/DIPM/IIPB (RKF)

J. W. Craig, Associate Dir. for Inspection and Programs (JWC1)

B. W. Sheron, Associate Dir. for Project Licensing and Technical Analysis (BWS)

T. A. Bergman, Chief, Regional Operations Staff, OEDO (TAB)

H. N. Berkow, NRR Project Director (HNB)

S. Dembek, Chief, Section 2, NRR/DLPM (SXD)

J. N. Donohew, Project Manager (JND)

ADAMS: WYes G No Initials: __ath___

W Publicly Available G Non-Publicly Available G Sensitive W Non-Sensitive S:\DRP\DRPDIR\EOC for 03\Assessment Letters\CWY.wpd RIV:C:DRP/B D:DRS D:DRP DNGraves;df DDChamberlain ATHowell

/RA/ /RA/ MASatorius for 2/23/04 2/26/04 3/3/04 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Page 1 of 2 Callaway 03/01/2004 15:31:33 Inspection / Activity Plan Report 22 03/01/2004 - 10/01/2005 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OB-IN - INITIAL EXAM 4 1 X02258 CALLAWAY - INITIAL EXAM (03/04) 03/01/2004 03/05/2004 Not Applicable PEB-52 - BIENNIAL PIR 4 1 IP 71152B Identification and Resolution of Problems 03/22/2004 04/02/2004 Baseline Inspections OB-EP1 - EP PROGRAM INSPECTION 1 1 IP 7111402 Alert and Notification System Testing 03/15/2004 03/19/2004 Baseline Inspections 1 IP 7111403 Emergency Response Organization Augmentation Testing 03/15/2004 03/19/2004 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 03/15/2004 03/19/2004 Baseline Inspections 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 03/15/2004 03/19/2004 Baseline Inspections 1 IP 71151 Performance Indicator Verification 03/15/2004 03/19/2004 Baseline Inspections TI-152 - TI 2515/152 LOWER HEAD INSPECTION 4 1 IP 2515/152 Reactor Pressure Vessel Lower Head Penetration Nozzles (NRC Bulletin 2003-02) 04/10/2004 05/20/2004 Safety Issues TI-153 - TI-153 REACTOR CONTAINMENT SUMP BLOCKAGE 2 1 IP 2515/153 Reactor Containment Sump Blockage (NRC Bulletin 2003-01) 04/10/2004 05/20/2004 Safety Issues EB-08P - ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 04/26/2004 04/30/2004 Baseline Inspections 1 IP 7111108P Inservice Inspection Activities - PWR 05/03/2004 05/07/2004 Baseline Inspections ACCESSPI - ACRSA/PIV 1 1 IP 7112101 Access Control to Radiologically Significant Areas 04/26/2004 04/30/2004 Baseline Inspections EB-21/02 - SSD&PCI AND 50.59 7 1 IP 7111102 Evaluation of Changes, Tests, or Experiments 06/28/2004 07/02/2004 Baseline Inspections 1 IP 7111121 Safety System Design and Performance Capability 06/28/2004 07/02/2004 Baseline Inspections 1 IP 7111121 Safety System Design and Performance Capability 07/12/2004 07/16/2004 Baseline Inspections 1 IP 7111121 Safety System Design and Performance Capability 07/12/2004 07/16/2004 Baseline Inspections PSB-S1 - AA-AC-FF-PI 2 1 IP 7113001 Access Authorization 09/06/2004 09/10/2004 Baseline Inspections 1 IP 7113002 Access Control 09/06/2004 09/10/2004 Baseline Inspections 1 IP 7113008 Fitness For Duty Program 09/06/2004 09/10/2004 Baseline Inspections 1 IP 71151 Performance Indicator Verification 09/06/2004 09/10/2004 Baseline Inspections ALARA1 - ALARA PLANNING AND CONTROLS 1 1 IP 7112102 ALARA Planning and Controls 10/04/2004 10/08/2004 Baseline Inspections PEB-07B - HX PERFORMANCE 1 1 IP 7111107B Heat Sink Performance 03/07/2005 03/11/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Callaway 03/01/2004 15:31:33 Inspection / Activity Plan Report 22 03/01/2004 - 10/01/2005 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PEB-12B - MAINTENANCE EFFECTIVENESS REVIEW 1 1 IP 7111112B Maintenance Effectiveness 03/07/2005 03/11/2005 Baseline Inspections OB-EP EX - EMERGENCY PREPAREDNESS EXERCISE 3 1 IP 7111401 Exercise Evaluation 05/02/2005 05/06/2005 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 05/02/2005 05/06/2005 Baseline Inspections 1 IP 71151 Performance Indicator Verification 05/02/2005 05/06/2005 Baseline Inspections RP TEAM - RADIATION SAFETY TEAM INSPECTION 4 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 05/16/2005 05/20/2005 Baseline Inspections 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 05/16/2005 05/20/2005 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 05/16/2005 05/20/2005 Baseline Inspections 1 IP 7112203 Radiological Environmental Monitoring Program 05/16/2005 05/20/2005 Baseline Inspections OB-INIT - INITIAL EXAM 4 1 X02286 CALLAWAY (05/05) - INITIAL EXAM 08/01/2005 08/05/2005 Not Applicable 1 X02286 CALLAWAY (05/05) - INITIAL EXAM 08/22/2005 08/26/2005 Not Applicable OB-RQ - REQUAL INSPECTION 2 1 IP 7111111B Licensed Operator Requalification Program 08/01/2005 08/05/2005 Baseline Inspections EB17B - PERM PLANT MODS 2 1 IP 7111117B Permanent Plant Modifications 08/22/2005 08/26/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.